Demo
Viindoo demo handbook for manufacturing and assembly
92 step-by-step lessons on the demo system: manufacturing engineering and planning, import purchasing, warehouse and quality, shop floor production, subcontracting, sales, warranty, maintenance, approvals, accounting and costing.
Parts of the handbook
How to use this handbook
One vehicle through the whole chain
1 lessons
Part I. General configuration
5 lessons
Part II. Manufacturing engineering
8 lessons
- Lesson 7. Current manufacturing engineering configuration
- Lesson 8. Two-level bill of materials: one BoM for several colours
- Lesson 9. Work centers, operations, hourly rates and expense accounts
- Lesson 10. Standard consumption and loss rate
- Lesson 11. Engineering change orders (PLM)
- Lesson 12. Submitting a bill of materials for approval
- Lesson 13. Manufacturing engineering reports
- Lesson 14. Practice exercise: a second vehicle model
Part III. Production planning
7 lessons
- Lesson 15. Current production planning configuration
- Lesson 16. A sales order generates a make-to-order manufacturing order
- Lesson 17. Reordering rules (make to stock)
- Lesson 18. Master production schedule from a forecast
- Lesson 19. Reviewing the quantity, date and responsible person of an order
- Lesson 20. Production planning reports
- Lesson 21. Practice exercise: from forecast to manufacturing order
Part IV. Purchasing and import
9 lessons
- Lesson 22. Purchasing and import configuration in use
- Lesson 23. Import purchase order in a foreign currency
- Lesson 24. Check material availability and buy the shortfall for a manufacturing order
- Lesson 25. Supply request and approval
- Lesson 26. Purchase order approval threshold
- Lesson 27. Import costs in inventory cost
- Lesson 28. Vendor bills and payables
- Lesson 29. Purchasing and import reports
- Lesson 30. Exercise: receive an import batch of components from start to finish
Part V. Warehouse and quality
10 lessons
- Lesson 31. Warehouse and quality control configuration in use
- Lesson 32. Domestic receipt with incoming inspection
- Lesson 33. A failed incoming inspection blocks the receipt
- Lesson 34. Quality alerts viewed by vendor
- Lesson 35. Lots and serial numbers
- Lesson 36. Receiving imports in stages
- Lesson 37. Reserving components for the line when spare parts share the warehouse
- Lesson 38. Issuing materials to the workshop: the warehouse's part
- Lesson 39. Warehouse reports
- Lesson 40. Exercise: take one component from purchase order to workshop
Part VI. Shop floor production
9 lessons
- Lesson 41. Shop floor manufacturing configuration
- Lesson 42. Create the order, confirm it and plan the operations
- Lesson 43. Issue materials to the shop floor
- Lesson 44. Running the shop floor: start, record labor, stop the machine
- Lesson 45. Quality checks on the line, recording consumption, assigning the chassis number and closing the order
- Lesson 46. Actual hours, cost and journal entries when the order is completed
- Lesson 47. When reality departs from the plan
- Lesson 48. Shop floor manufacturing reports
- Lesson 49. Exercise: complete an assembly order on your own
Part VII. Subcontracting
8 lessons
- Lesson 50. Subcontracting configuration in use
- Lesson 51. Prepare subcontracting data
- Lesson 52. Subcontracting request and approval
- Lesson 53. Place the subcontracting order, supply materials and receive finished goods
- Lesson 54. Settle materials with the subcontractor
- Lesson 55. Subcontracting fee bills
- Lesson 56. Subcontracting reports
- Lesson 57. Exercise: a complete subcontracting order
Part VIII. Sales and distribution
6 lessons
Part IX. Warranty and repairs
5 lessons
Part X. Equipment maintenance
6 lessons
- Lesson 69. Maintenance configuration
- Lesson 70. Attach equipment to a work center and schedule maintenance by running hours
- Lesson 71. Report a breakdown on the shop floor and handle it
- Lesson 72. Preventive maintenance requests
- Lesson 73. Maintenance reports and station performance
- Lesson 74. Exercise: maintain a machine on the line
Part XI. Approvals
5 lessons
- Lesson 75. Approval configuration: which types are on, who approves, what thresholds
- Lesson 76. Submitting and approving an approval request
- Lesson 77. Does approval block confirming a manufacturing order?
- Lesson 78. Approval reports
- Lesson 79. Practice exercise: from bill of materials to engineering change order
Part XII. Accounting and costing
13 lessons
- Lesson 80. Costing accounting and bank configuration
- Lesson 81. Cost of one order when it is completed
- Lesson 82. Post work in progress at the end of the period
- Lesson 83. Allocate production costs to completed orders
- Lesson 84. Production cost report
- Lesson 85. Reconcile the bank statement
- Lesson 86. Value added tax
- Lesson 87. Financial statements B01-DN, B02-DN, B03-DN
- Lesson 88. The general ledger, the trial balance and the books in the Ministry of Finance form
- Lesson 89. Aged receivables and payables
- Lesson 90. Catalog of accounting reports and print templates
- Lesson 91. What the system does not do by itself
- Lesson 92. Self-study exercise - a month of product cost