Viindoo demo handbook for manufacturing and assembly

Part X. Equipment maintenance

This part answers these questions: how are the machines in the workshop maintained, by calendar or by running hours; when a machine breaks down in the middle of a shift, how does the worker report it; who repairs it; how long does the station stand still and how does that affect performance. The main readers are the head of maintenance, the technicians and the workshop manager.

The lessons in this part use a piece of equipment that this handbook created during its test run: Hydraulic bearing-cup press #1 (the Vietnamese name is "Máy ép thủy lực ép bát phớt #1"), attached to the work center Tổ khung (Frame team, the team that does the seal-housing pressing and chassis number stamping operation).

The maintenance options tied to manufacturing are in the Manufacturing settings (the box Maintenance - MRP, lesson "Shop floor manufacturing configuration", Step 1).

Lesson 69. Maintenance configuration

About 10 minutes. By the end of this lesson your company knows the catalogs that underlie maintenance: maintenance teams, failure reasons, operating milestones and maintenance schedules. The lesson is for viewing only.

Step 1 - See the maintenance teams

Open the list of maintenance teams.

PathMaintenance > Configuration > Maintenance Teams
Internal maintenance team

What you should see: one team "Internal Maintenance" of the company. Every piece of equipment must have a maintenance team; otherwise you cannot save equipment that has operating hours declared (the box "Please select a maintenance team for the equipment"). The Team Members column is empty: add technicians to the team so that they receive work.

Step 2 - See the maintenance request reasons

Open the list of reasons.

PathMaintenance > Configuration > Request Reasons
Four machine failure reasons

What you should see: four reasons Machine Jammed, Overheating, Unusual Noise, Broken Part, with the Loss column "Equipment Failure". These are exactly the tiles the worker taps when reporting a broken machine at the shop floor; the stop time is counted under this loss type in the effectiveness report.

Step 3 - See the product milestones

Open the list of milestones.

PathMaintenance > Configuration > Product Milestones
Milestones by month, km and machine running hours

What you should see: six milestones: 12, 24, 36 months; 20,000 km; "Mỗi 500 giờ chạy máy" (every 500 machine running hours); "Mỗi 2.000 giờ chạy máy" (every 2,000 machine running hours), each with a Milestone and a Milestone UoM. A milestone is the threshold that generates maintenance work.

Step 4 - See the maintenance schedule

Open the list of maintenance schedules.

PathMaintenance > Configuration > Maintenance Schedule
Two maintenance schedule lines

What you should see: each line combines Part + Milestone + Action + Replace Part, for example "Hệ thống thủy lực (Hydraulic system) - Mỗi 500 giờ chạy máy [500 Hours] - Hydraulic Oil Change - VG46 Hydraulic Oil - 20L Drum". Actions are declared in Maintenance > Configuration > Maintenance Actions, and each action is tied to a service product to compute cost.

Lesson 70. Attach equipment to a work center and schedule maintenance by running hours

About 10 minutes. By the end of this lesson a machine is attached to a production station and the system computes the next maintenance date from the number of hours the machine runs.

A piece of equipment has three Preventive Maintenance Mode values:

Mode How the system computes the next maintenance date
By Default It does not compute; create the preventive request by hand (lesson "Preventive maintenance requests")
By Hour Days between two maintenances = mean time between two failures divided by the average working hours per day; a new machine with no failure history cannot be computed yet
By Schedule From the Maintenance Schedule lines (running-hour, km, month milestones) and the machine's Working Frequency; the system generates a request automatically when it is due, notifying ahead by Days to Notify

Step 1 - Open the list of equipment

Open the list of machines and tools.

PathMaintenance > Equipment > Machines & Tools
Equipment list grouped by equipment category

What you should see: each piece of equipment is a card with the person in charge and a red label with the number of open maintenance requests; the left column filters by COMPANY and EQUIPMENT CATEGORY (Screwdriving Machines, Welding and Fixture Equipment, Battery Testing Equipment, Forklifts and Transport, Air Compressors, Line Jigs and Fixtures). The number of cards changes from day to day.

Step 2 - Create the equipment and attach it to the station

Click New. Fill in Name (for example "CO2 frame welding machine #2"), Work Center "Tổ khung" (Frame team), Maintenance Team "Internal Maintenance", Technician. The next screenshots show the equipment "Hydraulic bearing-cup press #1" of the test run, set up in the same way.

PathMaintenance > Equipment > Machines & Tools
New equipment attached to Tổ khung

What you should see: Company fills in automatically, Equipment Working Schedule "Giờ hành chính 40 giờ/tuần" (Office hours, 40 hours/week), the Work Center field "Tổ khung", Days to Notify 7, and the fields Equipment Category, Used By, Employee and Location. The tabs are Parts (declare the family tree of machine and parts), Description, Product Information (supplier, serial number, warranty expiry date), Maintenance, Worksheet and, once the equipment is saved, Maintenance Schedule.

Step 3 - Declare the working frequency and choose the maintenance schedule

Open the Maintenance tab and set Preventive Maintenance Mode to By Schedule. Under Working Frequency click Add a line: Starting Amount 0, Working Amount 8, Working Amount UoM Hours, Period Time (Hours) 24 (the machine runs 8 hours every 24 hours). Open the Maintenance Schedule tab, click Add a line, tick the line "Hệ thống thủy lực - Mỗi 500 giờ chạy máy" (Hydraulic system - every 500 machine running hours), and click Select.

PathMaintenance > Equipment > Machines & Tools
Choosing a maintenance schedule line for the equipment

What you should see: the box Add: Maintenance Schedule lists the lines available to choose, with the columns Part, Milestone, Action and Replace Part, and the buttons Select, New and Close; you do not have to retype the part, milestone and action.

Step 4 - Save and read the next maintenance date

Click the save icon and open the Maintenance tab again.

PathMaintenance > Equipment > Machines & Tools
Next maintenance milestone and next preventive maintenance date

What you should see: on the Maintenance tab, Preventive Maintenance Mode is By Schedule; the fields Expected Mean Time Between Failure, Mean Time Between Failure, Estimated Next Failure, Latest Failure and Mean Time To Repair are filled by the system from the corrective requests (in the screenshot the latest failure is 11/23/2026); Next Maintenance Milestone and Date of the next preventive maintenance (10/24/2026 in the screenshot) are computed from the maintenance schedule line, the working frequency and the failure history, and Days between each preventive maintenance shows the interval.

Step 5 - See the equipment on the work center

Open the work center Tổ khung, tab Equipment.

PathMaintenance > Equipment > Work Centers
Tổ khung with the attached equipment, MTBF and MTTR columns

What you should see: the list of the machines of the station (four in the screenshot, including "Hydraulic bearing-cup press #1") with the columns Equipment Name, Technician, Equipment Category, MTBF (mean time between failures), MTTR (mean time to repair) and Est. Next Failure. The smart button bar of the station has Operations, OEE, Lost, Load and Performance.

Lesson 71. Report a breakdown on the shop floor and handle it

About 10 minutes. By the end of this lesson your company has reported a broken machine right on the shop floor screen, seen the station stop by itself and the maintenance request generate by itself, then closed the request so the station can run again.

Reporting a breakdown stops one station and stops every operation running at that station, including those of other orders. The demonstration system is shared by many users: before reporting, open the station's board in Shop Floor, and the Running filter button must be 0; if not, choose another station.

Step 1 - Open an operation at the station that has equipment

In Shop Floor, add Tổ khung (Frame team) to my work centers (lesson "Running the shop floor: start, record labor, stop the machine", Step 2), select Tổ khung, and open an operation of an order your company created (for example the frame assembly order in the lesson "When reality departs from the plan") with Open & start.

PathShop Floor
Finishing welding and powder coating operation running at Tổ khung

What you should see: the operation "Hàn hoàn thiện, sơn tĩnh điện khung" (Finishing welding and powder coating of the frame) is Running, with the button Call maintenance (machine keeps running) in the right panel (used when the machine shows abnormal signs but does not have to stop yet) and the button Stop machine at the bottom; a yellow label ▲ 1 material(s) still short may show on the Materials block until the consumption is recorded.

Step 2 - Report the breakdown

Click Stop machine, then click the red button Equipment failure - call maintenance. Because Tổ khung has several machines, the system first asks you to choose the machine; choose Hydraulic bearing-cup press #1.

PathShop Floor
The system picks the only equipment of the station and asks what is wrong

What you should see: the box What's happening? again, with the block What is wrong? holding four reason tiles Machine Jammed, Overheating, Unusual Noise, Broken Part and the button Cancel (if the station has a single machine, the system attaches it to the request without asking you to choose).

Step 3 - Choose the failure

Tap Overheating.

PathShop Floor
Breakdown reported, station stopped and waiting for maintenance

What you should see: a yellow frame Waiting for maintenance: "Breakdown reported - the work center is stopped and a technician has been called.", the line "Overheating - Hydraulic bearing-cup press #1", a Take photo button to send a photo of the incident; a red strip "Station stopped: Equipment Failure".

Step 4 - See the station's work board

Click Back to leave to the board of Tổ khung.

PathShop Floor
Operation card at a Station stopped

What you should see: Station stopped · 1, a card with the red label Station stopped and the button Open to handle incident. The station keeps this state until the maintenance request is closed at the stage Repaired (Step 7).

Step 5 - Open the maintenance request that was just generated

Open the list of maintenance requests, search by machine name, and open the request "Overheating - Hydraulic bearing-cup press #1".

PathMaintenance > Maintenance > Maintenance Requests
Corrective maintenance request generated from the shop floor

What you should see: the stage bar New Request, In Progress, Repaired, Scrap with New Request lit; Equipment is the right machine; Maintenance Type Corrective; Team "Internal Maintenance"; Responsible; the Manufacturing Order and Work Order being worked on when it broke; Reason "Overheating"; Work Center Stop "Equipment Failure". The buttons Cancel and Create Repair Order; the latter is used when you have to replace a part that is issued from stock.

Step 6 - The technician takes the job

Click the stage In Progress on the stage bar.

PathMaintenance > Maintenance > Maintenance Requests
Request changed to In Progress

What you should see: the stage bar lights up at In Progress, and the history reads "New Request -> In Progress". The station is still stopped.

Step 7 - Close the request when the repair is done

Click the stage Repaired.

PathMaintenance > Maintenance > Maintenance Requests
Request Repaired, the Tổ khung station runs again

What you should see: the stage bar is on Repaired, the Close Date field has a value; the history reads "Status changed: In Progress -> Repaired" and notes that the work center Tổ khung is running again. On the shop floor screen the card no longer has the red label and the worker clicks Continue to carry on. The stop time is recorded in the loss "Equipment Failure" of the station (counted within working hours), and in the mean time to repair of the machine.

Lesson 72. Preventive maintenance requests

About 5 minutes. By the end of this lesson your company has scheduled one periodic servicing and seen it on the maintenance calendar.

Step 1 - Create a preventive request

Open a new maintenance request. Fill in Request "Preventive maintenance - Hydraulic bearing-cup press #1", Equipment, choose Maintenance Type Preventive, Scheduled Date an upcoming working day at 08:00, Duration 02:00.

PathMaintenance > Maintenance > Maintenance Requests
Preventive request being entered

What you should see: when you choose the equipment, Team and Responsible fill in automatically; a Recurrent field appears: tick it to make the request repeat on a cycle (day, week, month, year).

Step 2 - Save the request

Click the save icon.

PathMaintenance > Maintenance > Maintenance Requests
Preventive request saved, with a reminder activity

What you should see: the stage New Request; on the right, under Planned Activities, there is an activity "Maintenance Request" assigned to the person in charge, showing how many days remain or are overdue, with the buttons Mark Done, Edit and Cancel.

Step 3 - See the maintenance calendar

Open the maintenance calendar and click the arrow to move to the week with the scheduled date.

PathMaintenance > Maintenance > Maintenance Calendar
Maintenance calendar of the week with the preventive request

What you should see: the calendar Maintenance Requests filtered by To Do and Active, with a cell "08:00" carrying the name of your request on exactly the date and time you set, colored by technician (see the Technician legend on the right). Drag and drop a cell to move the schedule.

Lesson 73. Maintenance reports and station performance

About 5 minutes. The maintenance part has 5 report screens:

Report Path Which question it answers
Maintenance Requests (analysis) Maintenance > Reporting > Maintenance Requests How many requests are open, by technician, stage, equipment, corrective or preventive type
Dashboard Maintenance > Dashboard How much work each team has to do, scheduled, priority and unscheduled work
Maintenance Calendar Maintenance > Maintenance > Maintenance Calendar Which machines must be maintained this week
Equipment on the work center Maintenance > Equipment > Work Centers > Equipment tab Which machine breaks down often (low MTBF), which takes long to repair (high MTTR)
Overall Equipment Effectiveness Manufacturing > Reporting > Overall Equipment Effectiveness How many hours each station loses to equipment failure compared with other reasons (lesson "Shop floor manufacturing reports", Step 4)

Step 1 - See the maintenance request analysis

Open the maintenance requests report.

PathMaintenance > Reporting > Maintenance Requests
Chart of maintenance requests by technician and stage

What you should see: a bar chart counting active requests by technician, colored by stage (New Request, In Progress, Repaired); requests with no technician are grouped under "None". The number of bars changes from day to day. Switch to the table view to group by equipment or by Maintenance Type.

Step 2 - See the team dashboard

Click the menu Dashboard.

PathMaintenance > Dashboard
Maintenance team overview

What you should see: the tile "Internal Maintenance" with a To Do button and a count (for example "16 To Do") and the lines Scheduled, Top Priorities and Unscheduled with their counts. Click it to go to the team's list of work.

Lesson 74. Exercise: maintain a machine on the line

About 20 minutes.

  1. Create a new piece of equipment for a station, for example "Electronic torque wrench #1" for the station of the order your company created, with a maintenance team and a technician.
  2. Set Preventive Maintenance Mode to By Schedule, declare a working frequency of 16 hours every 24 hours, choose a maintenance schedule line; read the next maintenance date and compare it with when you declare 8 hours.
  3. Create a preventive request with Recurrent ticked monthly; find it on the maintenance calendar.
  4. When the station's board shows Running · 0 (no one else's operation is running): open an operation of the order your company created at that station, report Equipment failure - call maintenance with the failure Unusual Noise; check that the generated request has the equipment, the order and the reason.
  5. Move the request to In Progress and then Repaired; check that the station runs again on the shop floor screen.
  6. Open Shop Floor Entries and find the line of kind "Breakdown", and open the Equipment tab of the station to see the failure figures of the machine.

Self-assessment: if you did it correctly, the corrective request is at Repaired, the station is no longer at Station stopped, and the machine has at least one recorded failure.

Zalo