Try Viindoo yourself, on your own industry's workflows
A running demo system with sample data, a step-by-step guide and preview screens. Open it and start right away, no sign-up needed.
Sign in with the account admin and the password admin. The system is shared, so do not enter real information.
Freight forwarding
Choose your industry
Trading and distribution
Preview: Follow a configure-to-order assembly order
5 screens captured from the demo system itself, in the order the work happens. Click an image to enlarge it.

The quotation shows the cost and margin of the whole order before it is sent to the customer Quotation by configuration
Know the profit of an order right on the quotation
The assembled PC is quoted at 41,023,000 VND before tax, 45,125,300 VND in total. The three columns Cost, Margin, Margin (%) show a cost of 27,990,000 VND and a margin of 13,033,000 VND (31.77%), and the whole order also shows a matching Margin line, so you know whether the order is worth doing before sending it.
Try it in the system
Go to Sales > Orders > Quotations, click New, choose a customer and add an assembled PC, choose the Assembly Workshop warehouse on the Other Info tab, then click the column selector icon at the corner of the line table to turn on Cost, Margin, Margin (%).

One confirmation generates the delivery order and the assembly order Confirm the order and buy components
Confirming the order puts the warehouse and the workshop to work together
Click Confirm on order S00232 and the system immediately generates delivery order XLR/OUT/00065 and assembly order XLR/MO/00073 at the Assembly Workshop. This order has no Purchase button because both components of the PC are in stock at the Workshop; if any component were short, a vendor purchase order would appear alongside.
Try it in the system
On the quotation you just created click Confirm, look at the row of buttons above the order, then click Manufacturing to open the assembly order.

The assembled PC carries its own serial number and the components are deducted from stock Receive goods, record serial numbers and assemble
Each assembled PC has a serial number and you know which components were used
Order XLR/MO/00073 is done: the PC carries serial number 0000005, and the two components (a semi-assembled PC and a Windows 11 Pro license) were fully consumed at 1.00 each and deducted from the Workshop's stock. This serial number follows the PC to the delivery order, invoice and warranty ticket.
Try it in the system
Go to Manufacturing > Operations, open an XLR/MO order whose product is an assembled PC, look at the Components tab and the Lot/Serial Number field, and click the Serial Number button at the top of the order to trace the PC.

The invoice posts revenue, tax, receivables and cost of goods sold in one go Deliver and issue the e-invoice
Once the PC is delivered, the invoice also records the cost of goods sold
After the PC is delivered, invoice INV/2026/00189 posts revenue of 41,023,000 VND, VAT of 4,102,300 VND and receivables of 45,125,300 VND. At the same time, the cost of goods sold of 27,990,000 VND moves from stock 155 to cost of goods sold 632, so the margin matches the real stock issue. The e-invoice is issued once the e-invoice provider's account is connected.
Try it in the system
On the delivered sales order click Create Invoice, click Confirm on the invoice, then click the Journal Items button at the top of the invoice to read each journal entry line.

A warranty ticket opens on the exact serial number just sold and paid for Collect payments, reconcile receivables and warranty
Fully paid, and if the PC breaks, open a warranty by serial number
The payment of 45,125,300 VND has cleared invoice INV/2026/00189 in full, so the customer is no longer in the aged receivables. When PC 0000005 needs warranty service, ticket KBH/RO/00023 at the Warranty Warehouse opens against the exact serial number, with Under Warranty ticked and a link back to sales order S00232.
Try it in the system
On the invoice click Pay and then Create Payment; then go to Repairs > Orders, click New, choose the customer, product and Lot/Serial, tick Under Warranty, choose Operation Type Warranty Warehouse: Repairs and click Confirm Repair.
Watch the video on YouTubeYour whole business on one system
Full industry process: 7 stages, 31 steps, 12 reports
Every step has been run on the demo system. Open a step to see the role, the screen, what the system does automatically and the control point.
1. Receive the customer and prepare the quotation
Record leads and sales opportunitiesSalesperson
CRM > Sales > My Pipeline
AutomatedOpportunities move through the stages New, Qualified, Proposition, Won; from an opportunity, click "New Quotation" to create a quotation for the customer directly, with no retyping of customer details. When a customer submits the Contact form on the online store, the system creates an opportunity in the New stage
ControlConfirming an order does not move the opportunity to Won: the salesperson clicks Won on the opportunity
Track opportunity performance over time and by locationSales manager
CRM > Reporting > Activities; CRM > Sales > My Pipeline (switch to cohort or map view)
AutomatedThe Activities report and cohort view show the time from lead to opportunity; the map view shows opportunity locations by customer address; the activities report only has figures once activities are marked as done
Set up pricelists by customer groupSales manager
Sales > Products > Pricelists
AutomatedEach customer is assigned a pricelist (standard or dealer); quotations take the unit price from the customer's pricelist. A dealer pricelist with a percentage discount shows on the quotation line as an unchanged unit price with the Discount (%) column filled in, and the subtotal is the amount after discount. To give an extra discount on individual lines, turn on Discounts to get the Discount (%) column
Prepare a quotation to the customer's configurationSalesperson
Sales > Orders > Quotations
AutomatedEach PC configuration (processor, memory, storage, power supply) is a product code with its own component bill of materials; the salesperson picks the product code matching the customer's configuration and adds loose components if the customer buys them too; the unit price comes from the customer's pricelist, and VAT is calculated automatically
ControlWhen Sales Credit Limit is on, the quotation shows a warning banner if the current receivable plus the quotation value exceeds the customer's limit; it warns only, and the order can still be confirmed
See gross profit for each line and the whole order right on the quotationSalesperson, Sales manager
Sales > Orders > Quotations (open an order, turn on the Cost, Margin, Margin (%) columns)
AutomatedEach line calculates Margin = subtotal minus cost times quantity; the bottom of the order shows the total Margin and its percentage. The three columns Cost, Margin, Margin (%) are hidden by default; turn them on in the column selector. After delivery, the cost on the line updates to the real stock valuation of the goods actually delivered
Submit a low-margin quotation or an over-limit discount for approvalSalesperson, Sales manager
Sales > Orders > Quotations (gear menu, Get Approved); Approval > Approval Request > Request
AutomatedFrom the quotation click Get Approved (gear menu) and choose the Quotation type: each quotation line becomes a request; click Submit to move it to To Approve and send it to the employee's manager; the approver clicks Approve or Refuse, and who approved and when is saved on the request
ControlA quotation waiting for approval shows a WAITING FOR APPROVAL stamp and a note in the chatter but is NOT locked: the salesperson can still click Confirm and the order becomes a Sales Order; the request goes to the employee's manager (if there is no manager, a reminder banner appears); the system does not force approval by a gross margin % threshold
Send the quotation to the customerSalesperson
Sales > Orders > Quotations
AutomatedClick Print to download the quotation PDF (without cost) or Send to open the email composer with the PDF attached; Preview lets the customer view the quotation online; the quotation moves to Quotation Sent when sent or when you click Mark Quotation as Sent
Business customers order on their own on the online storeBusiness customer, Salesperson
Website > online store; Sales > Orders > Orders; customer portal (Orders, Invoices)
AutomatedA business customer logs in to the store, sees prices, adds PCs to the cart, chooses delivery and bank transfer payment, and receives the transfer instructions page; the order arrives in Sales in the Quotation Sent state for the salesperson to confirm, deliver and invoice like any other order; the customer reviews their orders and invoices on the customer portal
ControlCheckout requires an account: a customer who is not logged in and clicks pay is redirected to the login page
2. Confirm the order and trigger supply
Confirm the sales order when the customer agreesSalesperson
Sales > Orders > Orders
AutomatedOne confirmation triggers the whole chain: in-stock goods generate a delivery order; build-to-order PCs generate a manufacturing order at the Assembly Workshop; made-to-order PCs generate a request for quotation to the vendor, one separate request per sales order. The buttons on the order lead straight to the delivery order, manufacturing order and purchase order
ControlA PC is only assembled when it has a component bill of materials; a PC without a bill of materials but with a vendor is switched to made-to-order purchasing
Request a warehouse transfer or internal replenishment (optional)Warehouse staff, Warehouse manager
Approvals > Approval Requests > Requests
AutomatedCreate a request of the Inventory Reallocation type with the list of goods needed; once approved, click "Launch Procurement" so the system runs along the warehouse supply routes: generating transfers, manufacturing orders or requests for quotation; the generated documents show on the request
ControlThe manager approves or refuses the request; only users with Inventory access can launch procurement; goods with no suitable vendor raise an error immediately instead of being skipped
3. Purchase components
Send a request for quotation to the vendorPurchasing staff
Purchase > Orders > Requests for Quotation
AutomatedDraft requests for quotation are generated by the system from sales orders or procurement requests, or created by staff, to bring components into the Assembly Workshop and the warehouses; the unit price defaults to the vendor pricelist; click "Send RFQ" to send the email
Approve purchase orders by valuePurchasing manager
Purchase > Orders > Requests for Quotation
AutomatedTurn on Purchase Order Approval and set a threshold: a purchase order at or above the threshold moves to To Approve when confirmed; the purchasing manager clicks "Approve Order" and only then does it become a purchase order. You can also use an approval request of the Purchase Order type to keep a record of the approver
ControlA real block: an order at or above the threshold that the manager has not approved does not become a purchase order and does not generate a receipt; an approval request of the Purchase Order type only reminds and does not lock confirmation
Confirm the purchase order and send it to the vendorPurchasing staff
Purchase > Orders > Purchase Orders
AutomatedA purchase order generates a receipt awaiting goods at the warehouse that placed the order; the Receipts smart button on the order leads to the receipt; the order also has the Confirm button (records that the vendor has confirmed) and Send PO; vendor bills are created from the purchase order list
4. Receive goods, record serial numbers and assemble
Receive components from the vendor into the warehouseWarehouse keeper
Inventory > Operations > Transfers > Receipts
AutomatedConfirming a receipt increases stock; a receipt does not post a journal entry by itself, and the stock value is recorded when the vendor bill is posted; a short receipt prompts the system to create a backorder for the quantity not yet received; for a warehouse that receives in two or three steps, goods pass through the input area before going into stock
ControlMulti-step receiving (receive, check, store) is a setting of each warehouse
Record serial numbers for components and machinesWarehouse keeper
Inventory > Operations > Transfers > Receipts
AutomatedEach component and PC is tracked by its own serial number: components get serial numbers in the Details box of the receipt line; an assembled PC gets its serial number when you click Generate Serial on the manufacturing order (the number is issued automatically from the product's sequence); the serial number follows the goods through the assembly order, delivery order and repair order
ControlA receipt cannot be confirmed while serial numbers are missing for goods that require tracking
Assemble PCs to order at the workshopAssembly technician
Manufacturing > Operations > Manufacturing Orders
AutomatedThe manufacturing order carries the sales order number and reserves components per the bill of materials of the exact PC code the customer ordered; click Generate Serial so the PC gets a serial number, then Produce All: the components are deducted from the Assembly Workshop and the PC enters stock at a production cost equal to the total value of the components used
ControlIf components are short, the order stays in a waiting state and components cannot yet be reserved
Create a bill of materials for a new PC configuration straight from the assembly orderAssembly technician, Production manager
Manufacturing > Operations > Manufacturing Orders
AutomatedFor a new PC configuration with no bill of materials: create a manufacturing order, choose the Operation Type Assembly Workshop: Manufacturing, add the components actually fitted, then click Create BoM in the Bill of Materials box of the order; the system opens a new bill of materials pre-filled with the order's components to save and use for later orders
ControlOnly the production manager sees the Create BoM button; a new PC has no production cost yet, so the quotation shows a gross margin of 100% until the order is done and has a real cost
Trace origin by serial numberStorekeeper, Customer care staff
Inventory > Products > Lots/Serial Numbers (Traceability button)
AutomatedFrom a serial number you can see the receipt, the delivery order to which customer, and the repair orders done; the Traceability button is also on the manufacturing order
5. Deliver and invoice
Deliver goods to the customerWarehouse keeper, delivery staff
Inventory > Operations > Transfers > Deliveries
AutomatedConfirming a delivery order deducts stock; the serial numbers of the PCs shipped are recorded on the order and printed on the delivery slip; for a warehouse that delivers in two or three steps, picking, packing and shipping are separate
ControlA short delivery creates a backorder for the quantity not yet delivered
Create a sales invoice from the orderAccountant
Sales > Orders > Orders (Create Invoice button); Sales > To Invoice > Orders to Invoice
AutomatedClick Create Invoice on the order, choose Regular invoice, then Create Draft: the invoice takes the delivered quantity and the unit price, discount and tax from the sales order
ControlThe Invoicing Policy on the product decides whether to invoice by delivered or ordered quantity; goods not yet delivered cannot be invoiced by delivered quantity
Post the invoice: revenue, tax and cost of goods soldAccountant
Accounting > Customers > Invoices
AutomatedPosting the invoice makes the system record receivables (131), revenue (511), output VAT (33311) and the cost of goods sold of the exact goods delivered (Debit 632, Credit 156 or 155) on the same document; a delivery order does not post a journal entry by itself, and the cost of goods sold is recorded together with the invoice; stock on the general ledger matches the warehouse value
Issue the e-invoiceAccountant
Accounting > Customers > Invoices (Vietnam E-Invoice tab)
AutomatedSend the posted invoice to the e-invoice provider, and save the lookup code, issue date and the invoice presentation; the presentation and the converted copy can be downloaded again
ControlIssuing, replacing and adjusting an e-invoice are all recorded on the invoice together with the log of calls to the provider
6. Collect payments, reconcile receivables and pay vendors
Record customer payment (partial or full)Accountant, cashier
Accounting > Customers > Invoices (Pay button); review in Accounting > Customers > Payments
AutomatedClick Pay on the invoice: the Payment box fills in the remaining amount automatically; a partial payment gives the invoice a Partial label, full payment gives Paid; the receipt records Debit 1131 (cash in transit) / Credit 131 until it is reconciled with the bank statement; the due date follows the customer's payment terms
Reconcile bank statements with receipts and paymentsAccountant
Accounting > Dashboard (Bank journal card, Transactions button)
AutomatedEnter statement lines (from a file or by hand), select a line, and the system proposes a matching receipt, payment or invoice; click Confirm and the money moves from the transit account to the bank deposit (Debit 1122 / Credit 1131) and the line is labeled Reconciled; lines that cannot be matched are kept for handling. When no lines are waiting, the Bank card only shows the Transactions button
ControlMoney received or paid but not yet on the bank statement stays in the transit account until reconciliation
Track receivables aging and each customer's balanceReceivables accountant, Sales manager
Accounting > Reporting > Partner Reports > Aged Receivable
AutomatedReceivables are split by overdue bracket for each customer and drill down to each invoice; the partner ledger for each customer can be sent for reconciliation
ControlThe system does not send tiered payment reminder emails by itself; the accountant filters overdue customers on the report and contacts them
Record vendor bills and match them against goods receivedAccountant
Purchase > Orders > Purchase Orders (select an order in the list, Create Bill button); Accounting > Vendors > Bills
AutomatedThe vendor bill takes its lines and unit prices from the purchase order; the quantity on the bill follows the quantity received; the purchase order moves to Fully Billed
ControlThe bill date is required, and the bill cannot be posted if it is left blank; the Control Policy on the product: by received quantity or by ordered quantity; a bill created from a purchase order only takes the quantity received and not yet billed
Pay the vendorAccountant
Accounting > Vendors > Payments
AutomatedThe payment is matched to the vendor bill by the due date of the payment terms; Aged Payable shows which amounts are about to fall due
7. Warranty repairs and returns
Receive goods returned by a customerStorekeeper, Accountant
Inventory > Operations > Transfers > Deliveries (open a delivered order, Return button)
AutomatedFrom a completed delivery order click Return and enter the quantity to return (default 0): the return receipt is pre-filled with the exact serial numbers delivered; the sales order's delivered quantity decreases. A credit note is not created automatically: create it from the original invoice (Credit Note button, Reverse), and the system reverses revenue, tax and cost of goods sold
ControlA return does not automatically create a credit note and has no button to create a repair order; if the returned PC needs repair, create a separate repair order in step 7.2
Receive a faulty PC by serial number and create a repair orderCustomer care staff
Repairs > Orders
AutomatedChoose the PC and the serial number the customer brought in (the Lot/Serial field appears after choosing the product), and record the fault the customer reported; tick Under Warranty if the PC is still within the warranty period under the company's policy; choose Operation Type Warranty Warehouse: Repairs (defaults to the user's default warehouse, usually the Hanoi Warehouse) so the order belongs to the Warranty Warehouse; the order moves through the states New, Confirmed, Under Repair, Repaired; the customer's PC is taken from the Customers location
ControlThe system does not calculate the warranty period from the serial number: staff tick Under Warranty after checking the delivery date against the serial number
Repair a PC under warranty: replace components and record warranty costTechnician
Repairs > Orders
AutomatedThe technician adds replacement components taken from the Warranty Warehouse, then starts and ends the repair; the components are deducted from stock and their value is recorded in the period's warranty expense (Debit 6418, Credit 156), and the customer pays nothing
ControlIf a replacement component is short in the Warranty Warehouse, confirming the order shows a shortage warning and asks whether to confirm anyway
Repair a PC out of warranty: quote, confirm and invoice the repairCustomer care staff, Accountant
Repairs > Orders (Create Quotation button)
AutomatedFrom the repair order click Create Quotation: replacement components become quotation lines at the selling price; when the customer agrees, confirm the order, run the repair order to Repaired (only then does the order's Delivered column rise to 1), then Create Invoice as for a normal sales order. Revenue is posted to 511 from the invoice; the component cost is still posted to warranty expense (Debit 6418 / Credit 156) because of the components' destination location, not to Debit 632. If Under Warranty is ticked, the prices on these lines go to 0
Reports that answer the business owner's questions
- Margin and margin % on each line and each sales orderSales > Orders > Orders (open an order, Cost, Margin, Margin (%) columns)
- Sales analysis with the Margin measure by order, customer, product, salespersonSales > Reporting > Sales
- Invoice and bill analysisAccounting > Reporting > Management > Invoice & Bill Analysis
- Purchase analysis by vendor and productPurchase > Reporting > Purchase
- Stock and stock value by product and warehouseInventory > Reporting > Stock
- Aged receivablesAccounting > Reporting > Partner Reports > Aged Receivable
- Aged payablesAccounting > Reporting > Partner Reports > Aged Payable
- Debt ledger for each customer and each vendorAccounting > Reporting > Partner Reports > Partner Ledger
- Inventory summary (S11-DN), Stock card (S12-DN) and detailed ledger of materials and tools (S10-DN) in Vietnamese formsInventory > Vietnam Legal Reports > General Inventory Journal (S11-DN)
- Balance sheet and Profit and LossAccounting > Reporting > Statement Reports > Balance Sheet
- Repair orders by PC, customer, under or out of warrantyRepairs > Reporting > Repairs
- Sales opportunity analysis (cohort, map)CRM > Reporting > Activities
Freight forwarding
Preview: Follow an export shipment from Hai Phong to Busan
6 screens captured from the demo system itself, in the order the work happens. Click an image to enlarge it.

New shipment, choose a route template Planning
New shipment built from a route template
Choose the "FCL sea export Hai Phong - Busan" template and the shipment instantly has six stages, from pre-carriage to on-carriage, plus the route's charges.
Try it in the system
Create an export shipment, click From Template and choose this route template.

SHP/2610/00114, status In Transit In transit
Every change to a shipment leaves a trace
Sailing date, weight, volume, status: who changed it, when, and from which value to which value are all in the right-hand column.
Try it in the system
Confirm the shipment you just created, then declare containers and see the history record each step.

Three legs and the route map of the same shipment Route tracking
Three legs on one map
Pre-carriage by truck, main leg by sea, on-carriage to the consignee's warehouse. Each leg has its own mode, location and planned dates.
Try it in the system
Open the Schedule & Performance tab of a running shipment.

Customer page for shipment SHP/2610/00114 Customers track it themselves
Cargo owners view their own shipments
Your customers scan the QR code or log in to the customer portal to see status, planned dates and the map, instead of calling to ask.
Try it in the system
Click Preview on the shipment to open the customer page.

Customer invoice created from a shipment Invoicing
Shipment charges become an invoice, no retyping
Ocean freight, handling charge, B/L fee and seal fee go straight into an invoice in Vietnamese dong, with VAT and an e-invoice tab.
Try it in the system
From the shipment, create a quotation, confirm it, then create the invoice.

Statement of Financial Position (B01-DN) Financial reports
Straight into Vietnamese accounting reports
The shipment's invoice goes into the accounting books. The Statement of Financial Position (B01-DN) under Circular 99 and the S03a-DN, S03b-DN, S38-DN ledgers are available in the Reporting menu.
Try it in the system
Go to Accounting, Reporting and choose Balance Sheet.
Watch the video on YouTubeOne shipment, from quote to cash
Full industry process: 7 stages, 28 steps, 10 reports
Every step has been run on the demo system. Open a step to see the role, the screen, what the system does automatically and the control point.
1. Rate cards and sailing schedules
Enter buying rates from carriers and agents by routeRates manager / Sales
Freight Forwarding > Rates Management > Buying Rates > Carrier Rates; Freight Forwarding > Rates Management > Buying Rates > Agent Rates
AutomatedBuying rates by carrier, route (port of loading - port of discharge), container type and validity period are the basis for calculating cost of goods sold and selling price
Set up sailing schedules and build selling rates with a markupRates manager
Freight Forwarding > Planning > Vessel Schedules; Freight Forwarding > Rates Management > Selling Rates > Customer Rates
AutomatedEach sailing schedule is linked to a vessel, voyage, ETD, ETA and validity period; selling rates take the carrier's buying rate plus a markup, as configured
ControlSailing schedule: ETA must be after ETD; the validity "to" date cannot be before the "from" date
2. Quotation and order confirmation
Create a quotation from a sailing schedule (full container or LCL)Salesperson
Sales > Orders > Quotations > 'Select Sailing Schedule (FCL)' / 'Select Sailing Schedule (LCL)' button
AutomatedA comparison table shows carriers, sailing schedules that fit the route, departure date and container type; once you choose, the system generates the main freight lines, origin charges and destination charges for the service scope (door-to-door, port-to-door...), with the selling price calculated from the buying price plus a markup
ControlThe service scope decides which lines are generated; warns when the Incoterm does not match the role of the leg; flags a missing trucking rate card for a trucking leg
Internal approval and sending to the customer for confirmationSalesperson, Manager
Sales > Orders > Quotations
AutomatedWhen the customer confirms the quotation, it becomes a sales order
ControlA quotation approval step can be added if your company turns on the sales approval workflow
Confirm the order: the system automatically creates the shipment file and hands over to operationsSalesperson
Sales > Orders > Orders; 'Shipment' stat button on the order
AutomatedConfirming an order that has freight lines automatically creates a shipment file in Draft: customer, shipper, consignee, export/import direction, shipment type, origin/destination and legs; stamps the time of handover from sales to operations; sales lines are linked to the shipment to calculate P&L
ControlAll freight lines on one order must have the same shipment type, otherwise the order is refused confirmation, with instructions to split it; cancelling an order does not cancel the shipment (a note is added to the shipment)
Urgent job: create the shipment first, create the quotation laterOperations staff, Sales
Freight Forwarding > Operations > All Shipments > 'Create Quotation' button (shown only when the shipment has a customer, legs and a shipment type)
AutomatedCreates a quotation from the shipment file and links the sales lines to the shipment's charge lines
3. Shipment file, route and cargo
Create the shipment file: parties, route, legs, delivery termsOperations staff
Freight Forwarding > Operations > All Shipments (or Shipment Management > Operations > All Shipments)
AutomatedFrom the service scope, the system pre-builds the pre-carriage, main and on-carriage legs; you can use 'From Template' to copy charge lines and stages from a scenario (three templates come with the product: sea export full container, sea import full container, forwarding service only)
ControlSaving is refused when: the actual departure date is not before the actual arrival date; the cut-off deadline is not before the sailing date of the main leg (the leg is named); the shipment type does not match the transport mode; or a port is changed after a main leg exists
Declare cargo, packages and containersOperations staff
Freight Forwarding > Cargo & Containers > Cargo; Freight Forwarding > Cargo & Containers > Containers; Freight Forwarding > Cargo & Containers > Packages
AutomatedFull container: load cargo into containers; LCL: load cargo into packages; total weight and volume are calculated; dangerous goods by UN number and DG class; HS code
ControlLCL cargo cannot use containers; changing the shipment type is blocked once a full container exists
Confirm shipment operations (handover done, all legs present)Operations staff
Freight Forwarding > Operations > All Shipments > Confirm button
AutomatedThe shipment moves from Draft to Confirmed; if the main leg is missing, the system builds the legs from the information at the top of the file
ControlConfirmation is blocked when a leg is missing, when the main leg has no pickup or delivery location, or when there are 2 or more constrained legs and one of them has no departure date
4. Booking, documents, customs clearance and costs
Send a booking request to the carrier / agent / truckerOperations staff
Freight Forwarding > Bookings > All Bookings > Carrier Bookings; quick booking button on the shipment file
AutomatedWhen you send the request, the system pre-builds the execution containers or packages from the booking basis, and preliminary cargo lines; the booking moves through Draft - Requested - Confirmed - Done
ControlA booking must be linked to one leg; the scope of a full-container booking must match the service scope of the shipment
Carrier confirms space: the system generates freight lines with cost of goods sold from the rate cardOperations staff
Freight Forwarding > Bookings > All Bookings > Carrier Bookings > Confirm button; Charges tab on the shipment file
AutomatedConfirming a booking creates the main freight line (one line per booking) with cost of goods sold taken from the carrier rate card for the route and container type; if a sales line from the quotation already exists, the cost and vendor are added to that line instead of creating a duplicate; each charge line is automatically set to Prepaid or Collect by Incoterm and where the charge arises
ControlIf the carrier is missing configuration, a setup window opens before confirmation; if no rate is found, the cost of goods sold is 0 and the charge line is flagged as estimated cost (with a warning on the P&L); origin and destination charges are not generated automatically - enter them or take them from the quotation / template
Prepare documents: SI, draft B/L, HBL, HAWB, D/ODocumentation staff
Shipment file > Required Documents tab > Prepare SI / Prepare Draft B/L / Prepare HBL / Prepare HAWB; Freight Forwarding > Documents > Shipment Documents / Pending Documents / My Documents
AutomatedEach preparation creates a document request assigned to the responsible person, with a deadline and a tag, and also generates a task; prints the HBL, packing list, delivery order, booking confirmation and debit note from the built-in print templates
ControlTrack pending documents by person and by deadline
Track declaration deadlines and customs clearanceDocumentation / customs staff
Shipment file > 'Customs (Export)' or 'Customs (Import)' group (shown once the shipment leaves Draft); full-container import shipments: 'Cleared' button on each container
AutomatedRecords the declaration filing deadline (export), the declaration opening deadline (import), the filing time and the clearance time; reminder rules 1 day before the deadline (export) and 3 days before (import), which run only when turned on; cargo manifest filing deadline for consolidated shipments
ControlThe declaration filing deadline must be before the sailing date of the main leg; clearance cannot be before the declaration filing time (checked only when both dates exist). The import declaration opening deadline is deliberately not checked against the arrival date
Enter additional charges per shipment (origin charges, destination charges, pass-through charges, on-behalf payments)Operations staff / Accountant
Shipment file > Charges tab
AutomatedEach charge line has a customer, vendor, selling price, cost, currency; for pass-through charges the selling price equals the buying price, while the main freight carries a margin
ControlFor a charge that has already been invoiced, the Prepaid/Collect payment term cannot be changed freely
5. LCL consolidation and deconsolidation (LCL cargo only)
Receive LCL cargo at the CFS and create a master shipment from house shipmentsCFS staff / Operations staff
Freight Forwarding > Operations > All Shipments > House Shipments / Master Shipments; 'Cargo Received at CFS' button
AutomatedSelect LCL house shipments to create one master shipment (with carrier and containers) and load the house packages into the container
ControlOnly LCL house shipments can be consolidated; the CFS cut-off applies to the master shipment
Tally on unstuffing and deconsolidateCFS staff
Import master shipment > Outturn Reports and Deconsolidate buttons
AutomatedThe tally report for each house shipment records full, short, over and damaged cargo; confirm the report, then split the master shipment into house shipments by consignee
ControlThe report needs at least one house line before it can be confirmed; deconsolidation needs at least one consignee line
Allocate master shipment costs to house shipmentsAccountant / Operations
Master shipment > Allocate Costs button
AutomatedSplits the master shipment's costs across house shipments by one of five methods: equal, by quantity, by volume, by revenue ton (W/M), or manual; actual measurements at the CFS take priority; blocks duplicate vendor bills between the master shipment and house shipments
ControlShown only for a master shipment that has house shipments and costs that can be allocated
Issue the delivery order (D/O) and deliver LCL cargoDocumentation staff / CFS staff
Import house shipment > 'Issue D/O' and 'Delivered' buttons
AutomatedRecords the house D/O number, the issue time and the delivery time at the CFS
ControlA D/O can be issued only once for each import house shipment
6. Operations through to delivery
Stamp milestones on each export containerField staff / Operations staff
Freight Forwarding > Cargo & Containers > Containers; or the container line on the shipment file
AutomatedSequence: pick up empty - stuff cargo - gate in - load on vessel; submit the verified gross mass (VGM); mark as not loaded or rolled to a later sailing, and the system sends a reminder to the person in charge of the shipment
ControlNo skipping milestones: each milestone can be clicked only when the previous one is done; VGM requires that the cargo is stuffed and a weight is entered; exception handling is allowed only after gate-in or loading on the vessel
Update shipment progress and notify the customerOperations staff
Shipment file > 'Progress Update' button / 'Trackings' stat button; customer portal /my/logistics/shipments
AutomatedEach update has a title (Booking confirmed, Cargo received, Departed, Arrived, Delivered) and a status (on track / at risk / off track / on hold); it can be published to the customer portal and sent by email; delay warning when ETA has passed; route map by leg
ControlDelayed or at-risk shipments are flagged on reports; the event date cannot be in the future
Start transit and run milestones for each package and containerOperations staff
Shipment file > Start Transit button; container lines, package lines
AutomatedThe shipment moves to In Transit (the actual departure date is recorded if empty); export packages: Ready - At origin CFS - In transit - At destination CFS - Delivered; import packages: In transit - At destination port - At destination CFS - Released - Delivered
ControlThe actual departure date must be before the actual arrival date
Arrival: send the arrival notice, track free days (demurrage and detention), import containersDocumentation staff / Operations staff
Import shipment file > 'Send Arrival Notice' button; container line: Arrived - Cleared - Pulled from port - Unstuffed - Empty returned
AutomatedOpens a pre-written email to the consignee and the notify party (not the shipper), and records "sent" only when the email actually goes to a party outside the company; calculates the detention free days, demurrage (port storage) free days and the last free day; reminder rule 3 days before the last free day
ControlOnly for import shipments that are Confirmed or later; cannot be sent a second time; if no one can receive the email, it is blocked with the reason for each party; detention charges are still entered manually
Issue the delivery order and complete the shipmentOperations staff
Shipment file > Set Done button
AutomatedThe shipment moves to Done, and the actual arrival date is recorded if empty; a done shipment cannot be set back to draft
ControlA done shipment cannot be cancelled; there is no action to close the books on a shipment
7. On-behalf collections and payments, invoices and P&L per shipment
Mark on-behalf collections and paymentsSalesperson / Accountant
Quotation > order line > 'Mark as on-behalf collection/payment' and 'On-behalf collection' columns (choose the partner)
AutomatedOn-behalf lines do not go on the customer invoice, do not count toward revenue and P&L, and appear in a separate "on-behalf collections and payments" block on the shipment P&L; money collected on behalf goes through a separate allocation sheet
ControlChoosing a partner for the on-behalf collection marks the line automatically; an on-behalf payment line with no vendor has revenue and cost of 0
Issue customer invoices from the charge linesAccountant
Shipment file > Charges tab > Create Customer Invoice; Accounting > Customers > Invoices
AutomatedGrouped by customer and currency, one currency per invoice, draft first; the e-invoice is issued through the e-invoice provider your company uses; the debit note is printed from the shipment
ControlA line that has already been invoiced is not invoiced again; on-behalf lines are excluded; a sales line linked to an order has the invoice linked back, so the sales order is not invoiced twice
Receive vendor bills by charge lineAccountant
Shipment file > Charges tab > Create Vendor Bills; Accounting > Vendors > Bills
AutomatedGrouped by vendor and currency and added to the shipment's existing draft vendor bill; cost is recorded to the shipment's analytic account when the bill is posted; links the outsourced purchase order to the booking
ControlBlocks lines that are already on the vendor bill of a master shipment or house shipment (to avoid paying twice) and records the reason as a note on the shipment
View P&L per shipment: expected and actualAccountant, Director, Sales manager
Shipment file > 'Profitability' stat button; Shipment Management > Reporting > Shipment Statistics > Shipment Profitability; shipment file > Total Revenue, Total Cost, Gross Profit
AutomatedRevenue from the sales lines linked to the shipment (invoiced and waiting to be invoiced), cost from the shipment's negative analytic entries (vendor bill entry, timesheets if configured), profit = revenue minus cost; on-behalf collections and payments are shown separately
ControlSales lines with nothing to invoice yet (a newly confirmed shipment) are not counted in report revenue; costs appear only after the vendor bill is posted; charges with no cost of goods sold are shown as estimated
P&L of an LCL master shipment, consolidated from house shipmentsAccountant, Director
Master shipment > Profitability table
AutomatedAdds up the revenue and costs of the house shipments on the master shipment
Reports that answer the business owner's questions
- Profitability per shipment (expected, invoiced, waiting to be invoiced)Shipment Management > Reporting > Shipment Statistics > Shipment Profitability
- Profit by customerFreight Forwarding > Reporting > Profit Reports > Profit by Customer
- Profit by salespersonFreight Forwarding > Reporting > Profit Reports > Profit by Salesperson
- Shipment status report (in progress, done, delayed)Freight Forwarding > Reporting > Status Reports
- Shipments by month / by origin - destination / total shipmentsShipment Management > Reporting > Shipment Statistics
- Delayed shipmentsFreight Forwarding > Operations > All Shipments > Delayed Shipments
- Freight forwarding dashboardFreight Forwarding > Dashboard
- On-behalf collections and payments analysisAccounting > Reporting > Management > On-behalf Payments Analysis
- Receivables and payables by agingAccounting > Reporting > Partner Reports
- Financial statements B01, B02, B03 under the current circularAccounting > Reporting
Manufacturing and assembly
Preview: Follow one vehicle from the dealer order to tracing its frame number
6 screens captured from the demo system itself, in the order the work happens. Click an image to enlarge it.

A dealer order, priced at the right tier automatically Sell to a dealer
Pick the dealer and the price follows its tier
Choose a dealer as the customer and the 16% dealer pricelist and 30-day payment terms fill in by themselves. The vehicle line is made to order, so confirming the order immediately creates a manufacturing order for this very vehicle.
Try it in the system
Create a quotation for the Hai Duong dealer, add an Aura vehicle, check the Pricelist field and the Disc.% column on the Order Lines tab; set the Route to order-based replenishment, then confirm.

A component purchase order in Chinese yuan Import purchase
Short components, bought straight from a foreign vendor
The motors the order is short of are bought from a Chinese vendor in yuan. The vendor price and product code come from the purchase pricelist, and the order converts to VND at the exchange rate.
Try it in the system
Create a request for quotation for Jiangsu Huanyu, set the Currency to CNY, check the Foreign Import and Deliver To fields, then confirm it into a Purchase Order.

Duty, freight and fees in the component cost Import cost price
Import duty, freight and fees are part of the cost price
The landed cost is created from the forwarder bill, an import duty line is added, and the total is split over every motor in the lot. The component cost price is the real cost including every import charge.
Try it in the system
Open the landed cost, check the Additional Costs tab with its Account column and the Vendor Bill field, then go to the Valuation Adjustments tab.

The team lead records time right on the line On the line
Start, stop and finish right on a tablet
The team lead opens the order card and the timer counts the real time of the operation. Recording output and materials used, stopping the machine with a reason or calling maintenance are all done on the spot; the actual time goes straight into the production cost.
Try it in the system
Open Shop Floor, choose a work center, open the card of your own order; try Record output, Stop machine and Finish operation.

The order cannot close until the checks are done Frame number check
One frame number per vehicle, checked before it enters stock
When closing the order, the system lists the vehicle frame number and the finished product checks. The closing button only becomes active once the frame and engine number check against the label and the other checks have a result.
Try it in the system
At the last operation of the order, click Pass on the frame and engine number check and on the two other lines, then click Confirm closing order.

From frame number to component lot Traceability
A dealer reports a fault: the frame number brings up the whole history
From the frame number, the traceability report shows who the vehicle was delivered to, which order assembled it and from which components; the motor lot traces back to the exact receipt of the imported shipment.
Try it in the system
Open Lots / Serial Numbers, choose frame number RLVAU26K24001, open the Traceability Report and click the arrows on the manufacturing order line and the motor line.
Watch the video on YouTubeImport, assembly, distribution: one flow
Full industry process: 7 stages, 35 steps, 13 reports
Every step has been run on the demo system. Open a step to see the role, the screen, what the system does automatically and the control point.
Manufacturing engineering setup
Create a multi-level bill of materialsProcess engineer
Manufacturing > Products > Bills of Materials
AutomatedEach semi-finished product has its own bill of materials; when a finished-goods order is confirmed, a semi-finished product with the Manufacture and Replenish on Order (MTO) routes generates a child manufacturing order. A kit-type bill of materials explodes straight into its components; a subcontracting bill of materials is used for outsourced subcontracting.
Define work centers and operationsProcess engineer, Production manager
Manufacturing > Configuration > Work Centers; Manufacturing > Products > Bills of Materials (operations of the bill of materials)
AutomatedEach operation is linked to a work center and has a standard time; a work center has an hourly cost, capacity and time efficiency. This data is used for scheduling, measuring productivity and calculating production cost.
Assign hourly rates and cost accounts to work centersCost accountant
Manufacturing > Configuration > Work Centers; Settings > Invoicing > Advanced MRP Accounting (Default cost account of the work center)
AutomatedA work center has an Hourly cost (machine), the employee Hourly cost if the shop floor screen is used, and a cost type (Manufacturing overhead or Direct labor cost) so the production cost report shows separate columns. Each work center takes a cost account; under the Vietnamese chart of accounts this is 627 Manufacturing overhead (Circular 99) or 154 (Circular 133); if left empty, labor time is posted to the expense account of the product category. When the order is completed, the work center time cost is credited to this account and debited to work-in-progress account 154.
Manage bill of materials changes with engineering change ordersProcess engineer, Engineering manager
PLM > Changes > Engineering Change Orders
AutomatedAn engineering change order creates a new bill of materials version and compares component and operation changes; it takes effect immediately or on a set date, and can be applied to a single running manufacturing order. There is an approval request flow for engineering changes. To change a bill of materials used by every order, duplicate it, edit the new copy and send it for approval.
ControlA new version replaces the current bill of materials only when the change order is applied
Set consumption standards and scrap ratesProcess engineer
Manufacturing > Products > Bills of Materials; Manufacturing > Reporting > Loss Components Analysis; Manufacturing > Reporting > Loss By-products Analysis
AutomatedEach bill of materials line has a Standard quantity (excluding loss) and a Loss rate; the system computes the quantity including loss. The loss analysis reports compare the actual consumption of each order with the standard: quantity variance, and actual loss rate versus standard loss rate. The production cost report has an extra standard quantity column.
Submit a bill of materials for approvalProcess engineer, Engineering manager
Approvals > Approval Requests > Requests
AutomatedThe Bill of Materials approval type is available; a request carries the product, quantity and component lines taken from the bill of materials when the request is created (Action > Get Approved).
Receive demand and plan production
Confirm the sales order, auto-generate a make-to-order manufacturing orderSalesperson, Production planner
Sales > Orders > Quotations; Manufacturing > Operations > Manufacturing Orders
AutomatedA product with the Manufacture and Replenish on Order routes generates a manufacturing order linked to the sales order. If there is a bill of materials, the order is confirmed immediately and reserves materials; if not, the order stays in draft.
ControlA product without a bill of materials is not auto-confirmed (draft order); add components, then create the bill of materials from the order
Plan make-to-stock using reordering rulesProduction planner
Inventory > Operations > Procurement > Replenishment
AutomatedA reordering rule (min - max) calculates the quantity to replenish and runs the Manufacture or Buy route; it can be automatic or manual.
ControlA manufacturing order generated from a reordering rule is created in Confirmed status
Build a master production schedule from the sales forecastHead of planning
Manufacturing > Planning > Master Production Schedule
AutomatedEnter the forecast by period (day, week, month) and the minimum - maximum safety stock; the system calculates demand down through the bill of materials levels, then runs procurement to create manufacturing orders and purchase orders for the period. The quantity to procure can be edited by hand.
Review quantity, dates and responsible person of ordersProduction planner
Manufacturing > Operations > Manufacturing Orders
AutomatedEdit the quantity, start date, deadline, bill of materials and responsible person. New demand from a reordering rule with the same product, bill of materials and source, not yet planned and with no responsible person, is added to the existing order instead of creating a new one; demand from sales orders and from the master production schedule generates separate orders.
Supply materials for orders
Check whether materials are sufficientProduction planner, Storekeeper
Manufacturing > Operations > Manufacturing Orders (Check Availability button, Component Status column, MO Overview button)
AutomatedConfirming the order reserves stock for available components and shows the Component Status (available / not available). MO Overview lists each component: quantity reserved, when more stock will arrive, and the quantity to order. The surest sign of a shortage is the Pick Components transfer (Reserved column), because Component Status also counts goods still in the receiving area and goods reserved for other orders.
ControlWarns about components that will not arrive before the start date
Buy missing materialsPlanner, Purchaser
Inventory > Operations > Procurement > Replenishment; Purchase > Orders > Requests for Quotation
AutomatedComponents with both the Buy and Replenish on Order routes automatically generate a request for quotation when the order is confirmed; for components with only the Buy route, buy the shortfall from the Replenishment screen or create a purchase order; components with an automatic reordering rule are triggered as soon as the order is confirmed; for the remaining components, the planner selects and orders them from the Replenishment screen.
Submit a supply request and get it approvedPlanner, Manager
Approvals > Approval Requests > Requests
AutomatedAn employee submits a supply request for one or more products; after approval, the system generates supply documents according to the configured routes (transfer between warehouses, manufacturing order or draft purchase order). If configuration is missing, the problem is logged in the chatter and the responsible person is notified.
ControlThe manager approves or rejects the request before supply runs
Approve and send the purchase orderPurchasing manager
Purchase > Orders > Requests for Quotation
AutomatedConfirming the purchase order generates a receipt; when the goods arrive, components are reserved for the manufacturing order.
ControlA purchase order at or above the Minimum amount must be approved by a manager (if Purchase Order Approval is enabled); a Purchase approval type is also available. On the demo system, Purchase Order Approval is turned off
Receive materials and run incoming quality checksStorekeeper, Quality inspector
Inventory > Operations > Transfers > Receipts; Quality > Quality Control > Quality Checks
AutomatedQuality checks are generated by control points (every time, randomly by percentage, or periodically) with the types Pass - Fail, Measure and Take a Picture. A failed check creates a quality alert with corrective and preventive actions.
ControlA receipt cannot be validated while checks are still outstanding, or when there is a Failed check at a control point with the blocking flag
Subcontract part or all of the workPurchaser, Storekeeper
Manufacturing > Operations > Subcontracting Requests; Purchase > Orders > Requests for Quotation; Inventory > Operations > Transfers
AutomatedFor a product with a Subcontracting bill of materials: the purchase order goes to the subcontractor; when the goods are received, the system automatically generates the subcontracting order and consumes the materials already supplied. The transfer supplying materials is generated automatically when the materials have the Resupply Subcontractor on Order route. You can create a Subcontracting Request linked to a confirmed manufacturing order and send it for approval; the subcontracting purchase order is created from Purchase. Per Vietnamese accounting standards: when the transfer supplying materials to the subcontractor is completed, the system immediately posts Debit 154 / Credit 152; when finished goods are received, the material value is deducted from 154, and the subcontracting fee is settled when the vendor bill is recorded.
ControlA subcontracting request can go through an approval request
Settle materials with the subcontractorAccountant, Storekeeper
Accounting > Accounting > Subcontracting Settlements; Accounting > Reporting > Manufacturing Reports > Subcontracting Report
AutomatedCreate a settlement per subcontractor and its subcontracting orders: it reconciles the materials supplied, consumed and remaining at the settlement date; any surplus creates a return transfer to the warehouse. The subcontracting report tracks finished goods ordered - received - remaining and materials delivered - used - remaining, including loss.
ControlCan be confirmed only when the subcontracting order has a completed transfer and a settlement line; a transfer cannot be canceled once goods have been returned to the warehouse, or when a later settlement on the same order has already been calculated from its figures
Release orders and issue materials to the shop floor
Plan operations by work centerForeman
Manufacturing > Operations > Manufacturing Orders (Plan button); Manufacturing > Planning > Work Orders > Planning by MO / Planning by Work Center
AutomatedSchedules each work order on a work center according to its working calendar; view it as a list, cards, calendar or Gantt chart, and drag and drop to reschedule by order or by work center.
ControlIf enabled, an operation can be locked until the previous operation is finished (dependencies between operations)
Issue materials to the shop floorStorekeeper
Inventory > Operations > Transfers
AutomatedThe warehouse sets the manufacturing mode to 1, 2 or 3 steps. From 2 steps, confirming the order generates a pick-components transfer that moves materials to the production area; 3 steps adds a store-finished-goods transfer.
ControlWarns when recorded consumption exceeds available stock
Production on the shop floor
Run each operation, record actual hoursWorker, Foreman
Manufacturing > Operations > Work Orders
AutomatedStart, Pause and Finish record real timestamps; the system adds up the actual duration, compares it with the expected duration of the operation, and uses these actual hours to calculate machine-hour cost in the production cost.
Operate from the touch screen on the shop floorWorker
Shop Floor
AutomatedA work board per work center; record finished goods and the materials actually used as they occur (scan lot, serial number), stop the machine with a reason, and close the order right on the screen. The Record materials used button marks materials as consumed; stock and the material journal entry are posted when the order is closed. The serial number (frame number) is entered on the manufacturing order, or generated from a sequence. Labor cost is calculated from the hourly rate of the employee who actually did the work (the work center rate if missing); machine stop time is not added to the production cost. The shop floor log keeps every entry: who recorded it, for whom, and whether it was undone.
ControlOnly the person who recorded an entry or a production manager can undo it, and only while the order is still open; only a production manager can restart a stopped station
Report a machine stop with a reasonWorker, Foreman
Manufacturing > Operations > Work Orders (Report Stop, Resume buttons)
AutomatedThe work center switches to stopped status; stop time is counted by loss reason for efficiency analysis. Stopping a work center stops every operation running on it.
ControlWhile a work center is stopped, no operation can start until it is resumed
Record actual consumption and scrapWorker, Foreman
Manufacturing > Operations > Manufacturing Orders; Manufacturing > Operations > Scrap
AutomatedActual consumption is recorded per component; scrap is recorded as a scrap order linked to the order or operation and is deducted from stock.
ControlConsumption level of the bill of materials: Allowed / Allowed with warning / Blocked - on completion, a deviation from the standard warns or blocks
In-process quality checksQuality inspector, Worker
Quality > Quality Control > Quality Checks
AutomatedChecks per operation: check materials before starting, measure a value (with target, tolerance and an SPC control chart at the control point), pass - fail, photo; a failed check creates a quality alert. Workers record results right on the shop floor screen; if an IoT box is installed, measurements are read straight from the gauge or scale of the work center.
ControlWhile a check is outstanding, the operation cannot start or finish; a Failed check at a control point with the blocking flag also blocks it
Track order progressForeman, Production manager
Manufacturing > Operations > Manufacturing Orders Progress; Manufacturing > Operations > Manufacturing Orders; Manufacturing > Reporting > Work Orders
AutomatedThe Manufacturing Orders Progress screen groups the orders of one demand: quantity to make, done and remaining, progress percentage, expected versus actual duration, deadline, and a forecast shortage warning. Orders show the status Ready, In Progress or To Close; you can filter late orders.
Complete the order, receive into stock and calculate cost
Check quality of finished goodsQuality inspector
Quality > Quality Control > Quality Checks
AutomatedA finished goods check is generated when the order is confirmed, based on the control points of the product; a failed check creates an alert and pushes the work to the relevant department.
ControlThe order cannot be closed while checks are outstanding, or when there is a Failed check at a control point with the blocking flag
Complete the order and receive finished goods into stockForeman, Storekeeper
Manufacturing > Operations > Manufacturing Orders (Mark as Done button)
AutomatedConsumes components, receives finished goods into stock (with a lot or serial number, which can be generated automatically), and generates stock journal entries. If less than the full quantity was produced, the system asks whether to create a backorder for the remainder.
ControlWarns or blocks when consumption differs from the standard (see the step on recording consumption)
Calculate the order production cost on completionCost accountant
Manufacturing > Operations > Manufacturing Orders (MO Overview button, journal entries button)
AutomatedFinished goods cost = value of materials consumed + machine-hour cost (actual hours x hourly cost of the work center) + labor cost (when the shop floor screen is used: hours of each employee x their hourly rate, excluding machine stop time) + additional unit cost; by-products share the cost by cost ratio. Journal entries are generated automatically: Debit 154 / Credit 152 for materials consumed; Debit 155 / Credit 154 for finished goods received into stock; Debit 154 / Credit the cost account of the work center (627 under Circular 99) for machine-hour and labor cost.
ControlActual cost is calculated only when the product uses FIFO or average costing; for standard-cost products, finished goods are received at the standard cost
Allocate actual manufacturing costs into production costCost accountant
Accounting > Accounting > Production Cost Allocation
AutomatedSelect the completed orders and the cost type (Direct labor cost or Manufacturing overhead), then add cost lines or select accounting entries not yet fully allocated (for example 622 and 627 costs in the period). Allocate by Equal, By Quantity, By Cost of Goods Sold, By Weight or By Volume; the system increases the value of finished goods still in stock, moves the part already sold into cost of goods sold, and credits the selected cost account. The result appears in the matching column of the production cost report.
ControlThe document must be Computed and then Confirmed; a cost line must use the same account as the selected entry, and one entry cannot be selected twice on the same document; a by-product with no cost ratio receives no allocation
Post the end-of-period work-in-progress entryGeneral accountant
Manufacturing > Operations > Manufacturing Orders (select in-progress orders, Actions > Post Work in Progress)
AutomatedThe entry records the work in progress of unfinished orders: Debit 154; Credit 152, 156 by the group of each material taken; Credit 627 (Circular 99) for machine hours and labor already worked (Circular 133: Credit 154). It reverses automatically on the date you choose (default: the next day); the accountant can edit the lines before posting. If consumption figures are edited after an order is completed, the difference is automatically reallocated to finished goods so that 154 returns to zero.
ControlThe entry must balance debit and credit before it can be posted; the reversal date must be after the posting date
View cost and compare with planCost accountant, Production director
Manufacturing > Operations > Manufacturing Orders (MO Overview button)
AutomatedThe order overview shows the standard cost and the actual cost for each component, operation and by-product; the Cost Analysis of a completed order gives the full cost including each person's labor, matching the value received into stock.
Summarize production cost by cost itemCost accountant, Finance director
Accounting > Reporting > Manufacturing Reports > Production Cost Report; Manufacturing > Operations > Manufacturing Orders (Costs Analysis button)
AutomatedA report by product and period, compared with the previous period: direct material cost, direct labor cost, manufacturing overhead (by each type), additional cost and the allocated part, scrap, by-products, and unit cost; export to Excel. Costs Analysis shows the detail of one order or one product.
ControlOnly accounting users can view it; Costs Analysis opens only when the order is completed
Machine maintenance and performance analysis
Maintain equipment and machines on scheduleMaintenance team
Maintenance > Maintenance Requests; Maintenance > Equipment > Machines & Tools; Manufacturing > Configuration > Work Centers
AutomatedManage equipment and components by genealogy; preventive and corrective maintenance requests; maintenance schedules by product or by machine running hours (a failure history is needed to compute the date); notifications before maintenance is due. Each piece of equipment is linked to the work center it serves; the work center shows its equipment, technician, mean time between failures and mean time to repair; maintenance requests can be created from a manufacturing order or a work order.
ControlOnly the assigned technician or a maintenance manager can close a request that is keeping a work center stopped
Report a machine breakdown on the shop floor, call maintenanceWorker, Maintenance team
Shop Floor (Stop > Machine breakdown - call maintenance)
AutomatedOne tap stops the work center and creates a maintenance request; the equipment and reason are filled in by station, and you can take a photo of the problem. Stop time is counted from the moment of the report. You can also call maintenance while the machine is still running. A second tap is merged into the request already created.
ControlThe station shows Waiting for maintenance until the request is closed at the stage that returns the machine to operation; only a maintenance manager and a production manager can restart the station manually
Analyze work center performanceProduction manager
Manufacturing > Reporting > Overall Equipment Effectiveness; Manufacturing > Reporting > Work Orders
AutomatedRun time and stop time by loss reason, efficiency (standard versus actual), and the load of each work center. The Overall Equipment Effectiveness metric = run time divided by (run + stop) over the last 1 month.
Reports that answer the business owner's questions
- Manufacturing order overview (cost versus plan, material status)Manufacturing > Operations > Manufacturing Orders > MO Overview button
- Bill of materials overview (multi-level standard cost)Manufacturing > Products > Bills of Materials > BoM Overview button
- Overall Equipment EffectivenessManufacturing > Reporting > Overall Equipment Effectiveness
- Work order analysisManufacturing > Reporting > Work Orders
- InventoryInventory > Reporting > Inventory
- Production cost report (direct materials, direct labor, manufacturing overhead by product and period)Accounting > Reporting > Manufacturing Reports > Production Cost Report
- Cost analysis of a completed orderManufacturing > Operations > Manufacturing Orders > Costs Analysis button
- Quality checks and quality alertsQuality > Reporting > Quality Checks; Quality > Reporting > Quality Alerts
- Manufacturing orders progressManufacturing > Operations > Manufacturing Orders Progress
- Loss analysis of materials and by-products versus standardManufacturing > Reporting > Loss Components Analysis; Manufacturing > Reporting > Loss By-products Analysis
- Subcontracting report (ordered - received - remaining, materials delivered - used)Accounting > Reporting > Manufacturing Reports > Subcontracting Report; Purchase > Reporting > Subcontracting Report
- Master production schedule (forecast, demand, supply by period)Manufacturing > Planning > Master Production Schedule
- Shop floor log (shop floor actions: finished goods, consumption, machine stops)Manufacturing > Reporting > Shop Floor Entries
Retail chain
Preview: follow a day of selling crepes at one of the chain's stores
5 screens captured from the demo system itself, in the order the work happens. Click an image to enlarge it.

Opening a shift, with the opening cash carried over from the last shift Open session
Count the till at opening: the system already knows what should be there
The cashier opens a shift at the Hoan Kiem counter; the opening cash is prefilled with 768,000 VND, the amount counted when the last shift closed. Count the till again: if it matches, open the register; if not, correct the amount and the difference is recorded in the shift history.
Try it in the system
Go to Point of Sale, click Open Register on the May Crepe Hoan Kiem card, check Opening cash and Opening note, then click Open Register.

A member earns points right on the order Sell and earn points
Pick the customer and see the points earned at once
Each item takes its price from the Cau Giay store pricelist. Pick a member and the order shows the current points and the points added: 1 point per 1,000 VND, one card shared by all five stores and the website.
Try it in the system
Open the May Crepe Cau Giay counter, add a few items, click Customer and pick a member, check the Points line under Total, then pay.

A 20,000 VND cash shortage shows the moment the shift closes Close session, settle cash
Know at closing whether the till is over or short
The system adds up the opening cash, the cash taken during the shift and any cash in or out to get what should be in the till. The cashier enters the amount counted and any difference shows in red; when the shift closes, a shortage is booked to the counter's cash shortage expense.
Try it in the system
On the register screen, open the menu and choose Close Register; enter the amount in Cash Count, check the Difference line, add a Closing note, then click Close Register.

The kitchen sends batter, sauce and toppings to the Hoan Kiem store Central kitchen replenishment
One transfer: kitchen stock goes down, store stock goes up
The Gia Lam central kitchen sends batter mix, sauce and sausage to the Hoan Kiem store with one internal transfer. Validating it lowers the kitchen stock and raises the store stock; every crepe the store sells then draws exactly its ingredients from the store's own stock.
Try it in the system
In Inventory, create an internal transfer of the Gia Lam central kitchen to MHK/Stock, add batter mix and sauce, validate it, then check the stock of the Hoan Kiem store.

Five stores, three entities, one comparison table Revenue by store
Which store sells best, and at what margin
Select all three entities and group orders by point of sale to see the orders, revenue and margin of each store, franchise stores with their own books included. Click a store to break it down further by month, item or shift.
Try it in the system
Select all three companies, go to Point of Sale > Reporting > Orders, switch to the pivot view, group by Point of Sale and add the Margin measure.
Watch the video on YouTubeOne shift, from opening the register to sales by store
Full industry process: 10 stages, 44 steps, 21 reports
Every step has been run on the demo system. Open a step to see the role, the screen, what the system does automatically and the control point.
Set up the chain: companies, warehouses, products, registers, membership cards
Set up three business units, each with its own booksSystem administrator, Chief accountant
Settings > Users & Companies > Companies
AutomatedThe brand-owner company (central kitchen and company-owned stores) and two franchise households are three separate companies, each with its own Vietnamese chart of accounts, journals and financial statements. Users pick the active company at the top of the screen; a household's documents show only when that household is selected.
Set up the central kitchen warehouse and each store's warehouseWarehouse manager
Inventory > Configuration > Warehouse Management > Warehouses
AutomatedEach new warehouse creates its own stock locations and operation types: Receipts, Delivery Orders, Internal Transfers, Manufacturing, PoS Orders. A franchise store's warehouse belongs to the household's company, so the household's stock and transfers stay separate from the central kitchen.
Define each crepe as an ingredient kitHead chef, Chain manager
Manufacturing > Products > Bills of Materials
AutomatedEach item has the Kit bill of materials type, for example a sausage crepe is 50 g of batter, 15 g of mayonnaise sauce, 40 g of sausage and 1 paper bag. The item holds no stock; when sold, the stock transfer splits it into ingredients by bill of materials and deducts them from the selling store's warehouse.
Set a separate pricelist for each storeChain manager
Point of Sale > Products > Pricelists
AutomatedEach store has its own pricelist: the Hoan Kiem store sells 3,000 VND higher per item, the Phuc An household sets its own prices; the register applies its own store's pricelist. The website uses the May Crepe standard retail price list.
Configure each store's register, sales journal and cash boxChain manager, Accountant
Point of Sale > Configuration > Point of Sales; Point of Sale > Configuration > Payment Methods
AutomatedEach register is tied to its store's warehouse, so counter orders deduct from the right warehouse; it has its own sales journal (for example POS Sales Hoan Kiem) and its own cash journal with cash difference loss and gain accounts. The QR transfer method posts money to the unit's bank account. The register shows only two categories, savory crepes and sweet crepes.
ControlCash control is on: cash in the drawer must be counted at the start and end of each session
Create a membership card program shared by the counter and the websiteChain manager, Marketing
Loyalty > Loyalty Programs; Loyalty > Members > Loyalty Cards
AutomatedEach customer has one card used at all five registers and on the website, for all three business units. Every 1,000 VND earns 1 point; 100 points can be redeemed for a 10,000 VND discount. Every point earned or spent is recorded as a line in the card's points history.
Buy ingredients for the central kitchen
Create purchase orders for ingredients, toppings and packagingPurchaser
Purchase > Orders > Purchase Orders; Purchase > Configuration > Vendor Pricelists
AutomatedPick the vendor and item, and the order fills in the unit price and lead time from the vendor pricelist. Deliver To defaults to Central Kitchen Gia Lam: Receipts; confirming the order automatically creates a receipt into the central kitchen warehouse.
Receive goods into the kitchen warehouseKitchen storekeeper
Purchase > Orders > Purchase Orders (Receive button); Inventory > Operations > Transfers > Receipts
AutomatedA confirmed purchase order has a Receive button that opens the kitchen's receipt (code BGL/IN/...) in Ready status, from the vendor into BGL/Stock. The storekeeper counts, edits the Quantity column if it differs from the ordered amount, then clicks Confirm: kitchen stock goes up and the ingredient's average cost is recalculated. For a short receipt, the system asks Create Backorder? so the purchase order keeps the part not yet received. Receiving does not post to the books yet (the Journal Entries button shows 0): inventory value is posted when the vendor bill is recorded.
Record the vendor bill and pay when dueAccounts payable accountant
Accounting > Vendors > Bills
AutomatedThe purchase order has no create-bill button: the accountant goes to Accounting > Vendors > Bills, clicks New, then picks the purchase order in the Auto-Complete field to pull in the received quantities. Posting: debit the inventory account of the product category (ingredients, goods), credit accounts payable to the vendor. The Pay button records the payment and reconciles the payable.
ControlBills follow the quantity received: goods not yet received cannot be billed
Make batter and sauces at the central kitchen
Set up work centers and hourly costHead chef, Production cost accountant
Manufacturing > Configuration > Work Centers
AutomatedEach work center has an hourly cost (Weighing and Mixing Area 120,000 VND, Sauce Cooking Area 150,000 VND, Packing Area 90,000 VND) and a direct labor expense account; actual running hours on the work center count toward the batch's production cost.
Create bills of materials for batter and sauces with operationsHead chef
Manufacturing > Products > Bills of Materials
AutomatedA 30 kg batch of batter mix needs 24 kg of flour, 4 kg of milk powder and 2 kg of sugar, through three operations: weighing, dry mixing, bagging; a 10 kg batch of mayonnaise sauce needs 7 kg of oil, 2 kg of eggs and 1 kg of vinegar. The BoM Overview screen calculates the batch's expected production cost.
ControlFlexible consumption is set to Allowed with warning
Create manufacturing orders from the weekly planHead chef
Manufacturing > Operations > Manufacturing Orders
AutomatedCreated by hand on the Manufacturing Orders screen; the Operation Type field defaults to Central Kitchen Gia Lam: Manufacturing. Confirming the order immediately reserves ingredients in the kitchen warehouse (no need to click Check Availability) and creates work orders for each work center following the bill of materials, in the set operation sequence (Weigh Ingredients, Mix, Bag for batter; Emulsify, Pack for sauce).
ControlBatter and sauces have no automatic manufacturing route or minimum stock rule, so the head chef creates orders by hand from the weekly plan
Run operations, record actual consumption and complete the orderKitchen staff, Head chef
Manufacturing > Operations > Manufacturing Orders; Manufacturing > Operations > Work Orders
AutomatedStarting and finishing each operation records the actual duration; edit hours on the work order's Time Tracking tab. When all operations are done, the order moves to To Close; clicking Produce All deducts ingredients by the actual amount used and receives the semi-finished product into kitchen stock.
ControlIf ingredient use differs from the bill of materials, clicking Produce All shows a Consumption Warning, and you must confirm to complete the order
See batch production cost and manufacturing journal entriesProduction cost accountant
Manufacturing > Operations > Manufacturing Orders (Overview button on the order)
AutomatedBatch production cost = value of ingredients used at average cost + actual hours multiplied by the work center's hourly cost; batter and sauces enter stock at this cost. Journal entries on completion: debit 154 credit 152 for ingredients, debit 155 credit 154 for semi-finished products, debit 154 credit 622 for labor hours.
Central kitchen supplies company-owned stores
Move batter, sauces and toppings from the kitchen to a company-owned storeKitchen storekeeper, Store manager
Inventory > Operations > Transfers > Internal
AutomatedAn Internal Transfer from the kitchen warehouse to the Hoan Kiem store warehouse; Confirm reduces kitchen stock and increases store stock. The kitchen and the store are in the same company, so the transfer creates no journal entry and stock value stays unchanged.
Track ingredient stock in the kitchen and each storeChain manager, Storekeeper
Inventory > Reporting > Stock; Inventory > Reporting > Moves History
AutomatedOn-hand quantity of each ingredient by warehouse, with the history of receipts, deliveries, transfers and consumption by bill of materials from sales orders; select several companies to see the franchise households' warehouses too.
Franchising: recruit partners, sell ingredients, collect receivables
Track franchise applicantsFranchise development lead
CRM > Sales > My Pipeline
AutomatedWhen a visitor submits the form on the website's Contact page (the Send franchise application button on the Franchise page), it becomes a new lead in CRM; the owner drags it through the stages New, Qualified, Proposition, Won.
Create franchise household records with 15-day payment termsAccounts receivable accountant
Accounting > Customers > Customers; Accounting > Configuration > Invoicing > Payment Terms
AutomatedThe payment term 15 days (franchise) set on the household fills in automatically on sales orders and invoices; the invoice due date is the invoice date plus 15 days.
The kitchen takes ingredient orders and confirms sales ordersKitchen salesperson
Sales > Orders > Orders
AutomatedThe sales order for a household records the store's order reference and the ingredient sale prices; the delivery warehouse defaults to Central Kitchen Gia Lam. Confirming creates a delivery from the kitchen warehouse.
Deliver ingredients and invoice the householdKitchen storekeeper, Accounts receivable accountant
Inventory > Operations > Transfers > Deliveries; Accounting > Customers > Invoices
AutomatedConfirming the delivery reduces kitchen stock. Creating the invoice takes the delivered quantity; posting the invoice: debit the household's receivable, credit revenue, and the system also adds a cost of goods sold line: debit cost of goods sold, credit inventory of semi-finished products or goods at average cost.
ControlInvoicing policy is by delivered quantity: nothing can be invoiced until it is delivered
A franchise household creates a purchase order, receives goods into the store warehouse and records the vendor billFranchise owner or store manager
Purchase > Orders > Purchase Orders; Inventory > Operations > Transfers > Receipts; Accounting > Vendors > Bills (select the household's company)
AutomatedThe household creates the purchase order in its own books, with the brand-owner company as vendor, and enters the kitchen's sales order number in the vendor reference; batter and sauces can be ordered because Can Be Purchased is on. Receiving adds to the household's store stock. The purchase order has no create-bill button: create the vendor bill from Accounting > Vendors > Bills and pick the purchase order in the Auto-Complete field; the bill debits ingredients and credits payables. The household's purchase order is a separate document and is not created automatically from the kitchen's sales order.
Partners view their own orders, invoices and balance on the portalFranchise owner
May Crepe website: Partner Sign In > My Account > Sales Orders; Invoices
AutomatedEach household's portal account sees only that household's own sales orders and invoices, with due dates and the amount still to pay.
Collect payment when due and track each household's agingAccounts receivable accountant
Accounting > Customers > Invoices (Pay button); Accounting > Reporting > Partner Reports > Aged Receivable
AutomatedRecording the receipt reconciles the invoice and the status changes to Paid; the aging report splits each household's receivable by days overdue.
A session at the counter
Open the session and check opening cashCashier, Store manager
Point of Sale > Dashboard (Open Register button on the register's card)
AutomatedCreates a new session for the register; the Opening cash field is pre-filled with the amount counted when the previous session closed, and the cashier recounts and opens the session.
ControlIf the opening count differs from the amount carried over from the previous session, the difference is recorded in the session's history
Sell crepes at the store pricelist, deducting ingredients by bill of materialsCashier
The register's selling screen (categories Savory Crepes, Sweet Crepes)
AutomatedPrices come from the store's pricelist. Each paid order creates a PoS Orders stock transfer that splits the item into ingredients by kit and deducts them from the store warehouse; each order's cost of goods sold and gross profit are calculated from the ingredients' average cost.
Members earn pointsCashier
Selling screen > Customer
AutomatedPick the customer from the member list and the order shows the points it will earn; when payment is confirmed, the points are added to the customer's shared card and a points history line is recorded.
Redeem points for a discountCashier
Selling screen > Actions > Rewards
AutomatedA customer with 100 points has the reward 10,000 VND off for 100 points; choosing the reward adds a discount line to the order and the points are deducted at payment. Points earned on an order are calculated on the item amount before the reward is deducted (a 62,000 VND order earns 62 points even after the discount).
ControlA reward cannot be redeemed without enough points
Pay by cash or bank transferCashier
Selling screen > Payment
AutomatedChoose Cash (the register calculates change) or QR Transfer, then click Confirm to print the receipt. For QR Transfer the cashier confirms the money was received; the screen does not show a QR code. Cash adds to the expected amount in the drawer; the payment journal entry is posted in one lump when the session closes.
Return goods to the customer and take back pointsStore manager
Selling screen > Orders > select the order > Refund
AutomatedCreates a return order linked to the original order, with negative quantities, refunded by the chosen method. A member customer loses the points earned on the returned items; points already redeemed for a reward stay as they are.
Close the session, settle cash, deposit money
Deposit part of the sales cash into the bankStore manager
Selling screen > Cash In/Out > Cash Out
AutomatedRecords an outgoing line on the register's cash journal with a reason; the expected amount in the drawer decreases accordingly. The accountant reconciles this with the money arriving in the bank account.
ControlOnly the point of sale manager or someone with invoicing accountant rights can cash in or out at the register
Close the session, count cash and handle differencesCashier, Store manager
Selling screen > Close Register
AutomatedThe closing window shows the system amount for the drawer and for each method; the cashier enters Counted (or counts by denomination in Cash Count), and the system calculates the Difference. A shortage goes to the cash difference loss expense, an overage to the cash difference gain income on the register's cash journal.
ControlIf there is a difference, a Payments Difference warning appears and you must choose Proceed Anyway to close; if a maximum difference is set, a difference above it can only be closed by a manager. A session cannot be closed while draft orders remain
Post the session and review itAccountant, Chain manager
Point of Sale > Orders > Sessions; Point of Sale > Reporting > Session Report
AutomatedClosing creates one journal entry for the whole session on the register's sales journal: revenue, cash by each method, cost of goods sold and the ingredient stock reduction by the bill of materials delivered. The entry carries the closing date.
Sell online on the website
Customers order crepes on the website and earn points on the same cardCustomer
May Crepe website: Order Crepes > Cart > Checkout
AutomatedPrices follow the standard retail price list. A buyer who is not signed in gets a new contact and a new card for each order, which does not add up with the card used at the counter; a customer who signs in to their own member account earns points on the same card used at the counter. Points are earned when the order is confirmed, calculated on the item amount (the delivery fee earns no points).
Choose home delivery or store pickup, and how to payCustomer
May Crepe website: Checkout (delivery and payment step)
AutomatedHome delivery within the city (15,000 VND) allows Cash on Delivery; Store Pickup allows Pay on Site; both have Bank Transfer. Orders paid on delivery or at the store are confirmed immediately; bank transfer orders wait for the store to confirm the money was received.
ControlPay on Site shows only when the customer picks Store Pickup; Cash on Delivery shows only for delivery methods that allow cash collection
The store handles web ordersHoan Kiem store manager
Website > eCommerce > Orders > Orders; Inventory > Operations > Transfers > Deliveries
AutomatedA confirmed web order creates a delivery from the Hoan Kiem store warehouse, and the crepes are split into ingredients by kit as at the counter; this delivery creates no journal entry. The invoice by delivered quantity records revenue and receivable but has no cost of goods sold line for kit items, so the web channel's gross profit has no cost yet (counter sales do, because the session journal entry takes it from the stock transfers).
HR, shift attendance and payroll
Create employee records, contracts and shift schedulesHR
Employees > Employees (Payroll tab of the record); Payroll > Employees > Employee Records
AutomatedThe Payroll tab of the employee record holds salary, working schedule (Store Morning Shift 8:00 - 15:00, Store Afternoon Shift 14:30 - 21:30, Office Hours 8 hours), work entry source Attendance, pay by hour for shift staff or by day for office staff, and the Meal Allowance. The department decides the payroll expense account: kitchen 622, stores 641, office 642.
Check in and out by shiftEmployee, Store manager
Attendances > Management (view check-ins); Attendances > Overview > Dashboard (New button for manual entry); Attendances > Kiosk Mode (card scan)
AutomatedEach check-in and check-out is matched against the shift schedule: the system calculates Valid Check-in, Valid Check-out, Valid Worked Hours, Late Hours and Early Leave Hours; hours within the schedule generate work entries automatically. The Management screen is view-only, with no New button; kiosk mode is for card scanning at the store.
Confirm work entries before the pay periodPayroll accountant
Work Entries > Work Entries > Work Entries
AutomatedWork entries generated from attendance wait for review; the payroll accountant checks unusual days, then clicks Confirm.
ControlPayslips take only confirmed work entries
Calculate the monthly payroll from actual workPayroll accountant
Payroll > Payslips > Payslips Batches
AutomatedCreate payslips for the unit's employees for the period, then Compute the payroll: base salary by actual hours or days worked, meal allowance in proportion to work, employee and company insurance contributions, deductions, and progressive personal income tax. The meal allowance is excluded from taxable income up to the legal limit; when taxable income after deductions is not positive, tax is zero.
Confirm the payroll and post itChief accountant
Payroll > Payslips > Payslips Batches
AutomatedConfirming creates a journal entry per payslip: debit payroll expense on the department's account (with the department's management account), credit payable to employees, insurance payable and personal income tax. The payroll entry is dated the last day of the period; if that date is later than today, the entry stays in Draft, and you must choose Actions > Confirm Entries and tick Confirm them now to post it. Closing completes the payroll batch.
Disburse salariesPayments accountant
Payroll > Payslips > Salary Disbursements
AutomatedCreate a disbursement from the payroll batch, choose the Bank journal instead of the document's default cash journal, and click Execute: it creates a salary payment for each unpaid payslip and reduces the payslip's amount still due. The payment stays In Process until it is reconciled with the bank statement.
ControlIf the payroll entry is still Draft, Execute reports "No payslip is due"; approval can be required before payment: set the Required domain before approval on the Salary Disbursement Approval type; without approval, Execute is not allowed
Accounting and performance by store and business unit
Compare revenue and gross profit across stores, sessions and itemsChain owner, Chain manager
Point of Sale > Reporting > Orders
AutomatedAnalyze counter orders by Point of Sale, Session, employee, item and date, with total amount and Gross Profit (revenue less ingredient cost by bill of materials). Select all three companies to compare company-owned stores with franchised stores.
Read each register's revenue and cost of goods sold in the booksAccountant
Accounting > Reporting > Audit Reports > Journal Items Analysis
AutomatedEach register posts to its own sales journal, so grouping by Journal and Account gives each store's revenue and cost of goods sold, matching the unit's general ledger.
Prepare financial statements B01-DN, B02-DN, B03-DN for each business unitChief accountant
Accounting > Reporting > Statement Reports > Balance Sheet; Profit and Loss; Cash Flow Statement
AutomatedChoose the Circular 99 template (B01-DN, B02-DN, B03-DN) for each company; each unit has its own set of statements because the books are separate by company. The direct cash flow statement reads cash flows through the counterpart links of journal entries.
Reports that answer the business owner's questions
- Revenue and gross profit by point of sale, session, employee, itemPoint of Sale > Reporting > Orders
- Sales details by date range or by sessionPoint of Sale > Reporting > Sales Details
- Session report (cash by method, differences)Point of Sale > Reporting > Session Report
- Loyalty points issued at the counterPoint of Sale > Reporting > Loyalty Points Report
- Points analysis and points balance of member customersLoyalty > Reports > Points Analysis; Loyalty > Reports > Points Balance
- Chain-wide revenue combining counter orders, website orders and sales to franchise householdsSales > Reporting > Sales
- Online salesWebsite > Reporting > Online Sales
- Ingredient stock by kitchen warehouse and each storeInventory > Reporting > Stock
- History and analysis of receipts, deliveries and transfersInventory > Reporting > Moves History; Inventory > Reporting > Moves Analysis
- Inventory in-out-balance journal and stock card in Vietnamese formatsInventory > Vietnam Legal Reports > General Inventory Journal (S11-DN); Stock Card (S12-DN)
- Purchases by vendor and itemPurchase > Reporting > Purchase
- Work orders and work center efficiencyManufacturing > Reporting > Work Orders; Manufacturing > Reporting > Overall Equipment Effectiveness
- Statement of Financial Position B01-DN for each business unitInvoicing > Reporting > Statement Reports > Balance Sheet
- Income statement B02-DN for each business unitInvoicing > Reporting > Statement Reports > Profit and Loss
- Cash flow statement B03-DN for each business unitInvoicing > Reporting > Statement Reports > Cash Flow Statement
- Revenue and cost of goods sold of each register by sales journalInvoicing > Reporting > Audit Reports > Journal Items Analysis
- Aged receivable of franchise households and aged payable to vendorsInvoicing > Reporting > Partner Reports > Aged Receivable; Aged Payable
- Cash book and bank deposit bookInvoicing > Reporting > Vietnam Accounting Reports > Account Cash Book (S07-DN); Account Bank Deposit Book (S08-DN)
- Attendance by employee and shiftAttendances > Reporting > Attendances
- Payroll analysis, insurance contributions and personal income taxPayroll > Reports > Payroll Analysis; Payroll Contribution Analysis; Personal Income Tax Analysis
- Franchise applications by stageCRM > Reporting > Pipeline
Services, projects and rental
Preview: follow a project from quote to profit and loss
5 screens captured from the demo system itself, in the order the work happens. Click an image to enlarge it.

A milestone-billed project sales order with a down payment already collected Project quotes
One sales order creates the project, the payment milestones and the estimate
Order S00046 is worth 1,360,000,000 VND before tax (1,496,000,000 VND in total) and is collected over three milestones; the customer paid a 30% deposit of 408,000,000 VND before tax (448,800,000 VND including tax, paid), leaving 1,047,200,000 VND. Right on the order there are buttons that go straight to the Project (1), Milestones (3), Tasks (0 / 9), recorded hours (180 hours), Invoices (1) and Estimates (1).
Try it in the system
Go to Sales > Orders > Quotations, click New, choose a customer and a full-package service product, click Confirm, then look at the row of Project, Milestones and Tasks buttons above the order.

Nine tasks in order, each with an assignee and dependencies Plan and approval
The project plan is visible on one chart
The project has 9 tasks, each assigned to one person. After the Site survey and technical scenario sign-off, 2D/3D design and Subcontractor and materials ordering run first; the three tasks Prepare the LED screens, Prepare the lighting system and Prepare the sound system run in parallel; then come Stage installation, alignment and full rehearsal, Technical operation on event day, and Teardown, acceptance and final settlement. The connecting arrows show which task waits for which.
Try it in the system
Go to Project > Projects, open a project, click the Tasks button at the top, then choose the Gantt view (the icon on the far right) to see the assignees and the dependencies between tasks.

Timesheets, purchase orders and vendor bills against the budget right on the dashboard Actual hours and expenses
Hours and actual costs are checked against the budget right away
The dashboard shows the project is On Track, with 180 of 900 hours logged (20%), 2 purchase orders and 3 vendor bills. The Budgets table puts the forecast of -995,000,000 VND next to the actual of -269,850,000 VND, leaving a difference of 725,150,000 VND; each item, such as Stage, frame and backdrop (-600,000,000 VND against -190,000,000 VND) or Internal timesheets (-110,000,000 VND against -31,350,000 VND), is shown separately.
Try it in the system
Go to Project > Projects, open a project and click the Dashboard button; from there click Timesheets, Purchase Orders or Vendor Bills to see each detailed line.

Three invoices issued exactly by the three milestones of 30%, 40%, 30% Invoices by progress
An invoice for each milestone reached
Order S00003 of Thien Phuc Pharmaceutical JSC has three payment milestones, so there are three invoices: INV/2026/00003 (07/10/2026) 354,000,000 VND, INV/2026/00004 (08/01/2026) 472,000,000 VND, INV/2026/00005 (08/08/2026) 354,000,000 VND before tax, matching 30%, 40%, 30%. All three are paid, adding up to 1,180,000,000 VND before tax (1,298,000,000 VND after tax).
Try it in the system
Open the project's sales order (Sales > Orders > Orders), click the Milestones button to see each milestone and its percentage, then click the Invoices button to see the invoices issued.

The loss-making project is plain to see: revenue 540,000,000, costs 607,550,000 Profit and loss by project
Know which project is losing money, and on which item
The project Le ky niem 20 nam thanh lap - Tan Long earns 540,000,000 VND but spends 607,550,000 VND (timesheets 98,550,000 VND, purchase orders 485,000,000 VND, expenses 24,000,000 VND), a loss of 67,550,000 VND (-13%). The Budgets table right above explains why: actual hours are 610 against 380 planned (161%), the Internal timesheets item exceeds its forecast by 40,550,000 VND, and total spending exceeds the budget by 52,550,000 VND.
Try it in the system
Go to Project > Projects, open a project, click the Dashboard button, then scroll down to the Profitability table to read revenue, costs and profit and loss.
Full industry process: 7 stages, 41 steps, 18 reports
Every step has been run on the demo system. Open a step to see the role, the screen, what the system does automatically and the control point.
Project track - 1. Project quote and contract signing
Prepare the project quote with the agreed payment methodSalesperson
Sales > Orders > Quotations
AutomatedThe service line on the quote carries its invoicing method: fixed price, milestone completion or timesheet hours; send the quote to the customer from this same screen
Prepare the estimate of planned revenue, cost and profitProject manager, Accountant
Estimates > Estimates > New (create and save the estimate first), then gear > Get Approved; Estimates > Reporting
AutomatedTotals costs, revenue and planned profit; supports multiple currencies; sub-estimates are merged into the main estimate on confirmation; a Sales Order, Purchase Order, Budget or Project can be created straight from an estimate; the estimate is created first, then sent for approval with the Get Approved button in the estimate's gear menu, and the approval request is linked to that estimate
ControlBlocks: the start date must be before the end date; the date range of a sub-estimate must fall inside the main estimate; a sub-estimate must use the same currency as the main estimate; only estimates in Draft can be deleted; once the main estimate is confirmed, the state of its sub-estimates cannot be changed; lines generated from a sub-estimate cannot be edited or deleted; the Estimate Approval type requires an estimate, so create and save the estimate first rather than creating the request first and entering the estimate afterward
Submit the estimate for approval before useProject manager, Director
Estimates > Estimates > (open an estimate) > gear > Get Approved; Approval > Approval Request > Request
AutomatedFrom the estimate's gear menu, open the Send for Approval box and click Create Approval Request: the request comes pre-filled with the name, partner, owner, date and the estimate lines (quantity, unit price, tax); the request goes through Draft, Submit and Approve, and once approved the estimate moves to Confirmed
ControlWhen an estimate is linked to an approval request, the direct confirm button is hidden and the state follows the approval flow your company defines. A request of the Estimate Approval type needs an existing estimate, so create the estimate first
Approve the quote or sales order before sending it to the customerDepartment head, Director
Approval > Approval Request > Request > select a Quotation > Action > Get Approved (the gear menu of the quotation form does not have Get Approved)
AutomatedFrom the Requests list, select a quotation or sales order, then Action > Get Approved: the request fills in partner, salesperson, date, product lines, unit prices, taxes and analytic distribution by itself; the approval result syncs back to the order
ControlA request can only be created for quotations that match the filter your company defines (for example, on the sample system only quotations above 1.5 billion VND before tax are included). Approval is an internal convention: the system does not lock the Confirm button of a quotation that is not yet approved. Blocks: a request can only be withdrawn or changed while the order is in Draft or Cancelled; a confirmed order must be set back to Draft first
Confirm the order: the system opens the project and milestonesSalesperson
Sales > Orders > Quotations > Confirm
AutomatedConfirming the order creates a project from the project template of the service line (the project name is the order number plus the template name; two lines with the same template produce one project) and links the project's analytic account so revenue, timesheets and costs flow to one place; milestone-based lines get their milestones created; tasks are only created when the project template has template tasks; the project manager can read the project's sales order without the Sales access right
Project track - 2. Project planning, resources and approval
Set the project budget by itemProject manager, Accountant
Budgets > Budgets; see the result at Project > Projects > (open a project) > Dashboard button (the project dashboard page)
AutomatedOnly confirmed budgets count in the Budgets panel of the project dashboard; actuals come from the project's analytic entries and only amounts inside each budget line's period are counted (amounts outside the period are dropped, with no warning); the budget type is chosen by product or by timesheet
ControlCompare only, does NOT block spending over budget (observed: a sample project exceeded the timesheet item by 40,550,000 and could still be posted). Data blocks: the date of a budget line must fall inside the budget's period; a line must have a budget type or an analytic account; a budget that has gone past Draft cannot be deleted; a budget type that is in use cannot be deleted. A budget still in Draft leaves the panel on the dashboard empty with no message
Break down into items and milestones, set dependencies, assign ownersProject lead
Sales > Orders > Quotations > (open an order) > Milestones (create milestones); Project > Projects > (open a project) > Tasks (switch from Kanban to List, then New, because in Kanban the New button only creates a quick card)
AutomatedA task takes an assignee, a milestone, a deadline and allocated time; planned start and end dates are set by dragging the bar on the Gantt chart (the task form has no planned start date field); dependencies are declared on the Blocked By tab (Add a line, pick a task) and form a chain of work
ControlBlocks: tasks cannot depend on each other in a circle (shows "Two tasks cannot depend on each other."), and a task cannot depend on its own parent or child task
Schedule on the Gantt chart and detect overlapsProject lead
Project > Tasks > All Tasks (switch to Gantt view); Project > Projects > (open project) > Tasks (Gantt view)
AutomatedCalculates the planned end date from planned hours, allocation rate and the assignee's working calendar; shows a warning (red triangle, with the number of other tasks of the same employee that overlap in time, including tasks of other projects); drag the body of the bar to move the dates, drag the right edge to change the end date, saved immediately; arrows show dependencies between tasks
ControlThe overlap warning is for display only and does not block saving. The only block: the planned start date must be on or before the planned end date. Gantt works only at task level (there is no Gantt bar for a whole project) and does not calculate a critical path
Submit the project plan for approvalProject lead, Director
Project > Projects > (open a project) > gear (Action) > Get Approved > Send for Approval box > Create Approval Request
AutomatedA request of the Project Plan Approval type comes with the project's milestone list (Project Milestones tab) and the approvers; it goes through Draft, Submit, Approve; once approved, the project shows an APPROVED ribbon
ControlWhen the approval type is set to 'Project manager approval = Required', it blocks: the request must select a project, the project must have an active project manager, and that manager must belong to the approval team leader group; this type must also have 'Has Project' = Required. The project only goes into execution when the approver agrees (depending on the approval flow your company defines). Editing the project after approval is not blocked and does not send the request back to Draft: the system only posts the note "Changes detected after approval was submitted" in the chatter as a reminder that it may need to be submitted again
Project track - 3. Execution: hours, expenses, purchases
Log working hours on a taskProject staff
Timesheets > Timesheets > My Timesheets (hours of the logged-in user); Timesheets > Timesheets > All Timesheets (enter hours for another employee); or the Timesheets tab in a task
AutomatedEach hours line creates an analytic cost line for the project, equal to hours times the employee's hourly cost; it does not create a journal entry
Log hours with the start and stop buttons on the taskAssignee
Project > Tasks > All Tasks > (open task) > Log Timesheet / Stop Timesheet Log; filter All WIP Timesheet
AutomatedClick Start Timer when you work and Stop Timer when you pause or finish, and the system creates the timesheet line; if you forget to stop past midnight, a dialog opens so you can choose the real stop time or the actual hours worked
ControlBlocks: hours cannot be logged on a project that does not have Timesheets enabled; no hours on an archived task or project; a task that still has a running timesheet cannot be archived
Approve an employee's timesheetsEmployee, Project manager
Timesheets > Timesheets > All Timesheets (select the timesheet lines of one employee) > Action > Get Approved > Create Approval Request; Approval > Approval Request > Request
AutomatedSelect the timesheet lines of one employee, then create one approval request; the next approver is the project manager (the system administrator is not an approver, so only sees Refuse, Cancel and Force Approval); each timesheet line carries its own state (Draft, To Approve, Approved, Refused) shown in the timesheet report; lines of a type that needs no approval are approved automatically
ControlBlocks: once a timesheet line is submitted or approved, a regular user cannot edit its project, task, employee or hours; a line attached to a request cannot be deleted; a request contains the timesheets of one employee only (selecting lines of two people shows "You cannot create a timesheet approval request for several employees at the same time!") and only lines still in Draft; a line must have both a project and an employee. Approval is not a condition for invoicing by hours: a timesheet line still in Draft can be invoiced
Submit employee expenses and reimbursement, linked to the projectEmployee, Team lead, Accountant
Expenses > My Expenses > My Expenses; Expenses > My Expenses > My Expense Reports; Expenses > Expense Reports (approver and accountant)
AutomatedThe employee enters the expense, selects an analytic distribution pointing to the project's account, then creates an expense report; the expense flows into the project Profitability table automatically; it can be re-invoiced to the customer; the team lead approves, the accountant posts the journal entry and then pays
ControlThe expense report must be approved by the team lead (Submit to Manager, Approve or Refuse) before the accountant posts it
Request an advance for the project team and reconcileEmployee, Accountant
Advances > Requests/Declarations > Advances; Advances > Accounting > Employee Advance Reconcile
AutomatedTracks each employee's unsettled advance balance; pays the advance through a payment registration; reconciles with expenses when the advance is returned
ControlAdvances are submitted through an approval request. Blocks: you cannot pay more than the remaining balance of the advance request; a reconciliation cannot be confirmed until there is a debit; a journal entry or payment linked to a reconciliation cannot be set back to draft; an advance attached to an approval request cannot be deleted; the employee must have a work contact
Purchasing and outsourcing for the projectPurchaser, Project lead
Purchase > Orders > Requests for Quotation; Purchase > Orders > Purchase Orders
AutomatedPurchase order lines carry the project's analytic account, so the cost enters the profitability table once the vendor bill exists; outsourced services on a sales order can generate a purchase order automatically
ControlPurchase orders can be made subject to approval by a filter condition (orders below the threshold, for example 500 million on the sample system, are confirmed immediately). A vendor bill must have an Invoice Date before it can be confirmed
Update the project status periodicallyProject lead
Project > Projects > (open a project) > Dashboard button (the project dashboard page) > New
AutomatedEach update captures the progress, milestones and profit at that moment so you can compare with the next one
Track progress by task points and completion velocityProject manager
Project > Tasks > All Tasks > (open task) > Task Points, Progress Mode; Project > Reporting > Velocity Analysis
AutomatedEach task has work points and a weight relative to the other tasks of the same project; progress is calculated automatically from timesheets or from completion points entered by hand; a report shows each person's completion velocity. Completion points only appear after you click Recompute Completion Points and then OK (entering allocated hours does not calculate points by itself); entering Allocated Time also changes the task's planned end date by the hours
ControlBlocks: manually entered progress must be between 0 and 100
Project track - 4. Invoicing by progress
Create the advance payment invoiceAccountant, Salesperson
Sales > Orders > Orders > Create Invoice
AutomatedGenerates the advance payment invoice as a percentage or fixed amount; later invoices automatically deduct what was already collected
Invoice by completed milestoneAccountant
Sales > To Invoice > Orders to Invoice
AutomatedWhen the project manager marks a milestone as reached, the delivered quantity of the order line increases and the order appears in the list to invoice; the invoice of the milestone automatically gets a line that deducts the down payment already collected. Milestones are marked in the Milestones list opened from the Milestones button on the order (the Reached column can only be ticked while the line is being edited)
ControlUntil a milestone is reached, there is no quantity to invoice
Invoice by actual hours workedAccountant
Sales > To Invoice > Orders to Invoice; Timesheets > Reporting > Timesheets > By Billing Type
AutomatedTakes the hours recorded into the order line at the contract unit price (hours are recorded from the Recorded button on the order; the invoice creation box has an extra Timesheets Period field); shows billable and non-billable hours by type
ControlTimesheet approval is not a condition: a timesheet line still in Draft can be invoiced
Invoice a lump sum and re-invoice expenses paid on the customer's behalfAccountant
Sales > Orders > Orders > Create Invoice; Accounting > Customers > Invoices
AutomatedA regular invoice collects what remains; employee expenses paid on the customer's behalf can be added to the order and reinvoiced to the customer: on the expense form choose the Customer to Reinvoice (only shown after choosing an on-behalf expense category), and after the journal entry is posted the system adds a line to the order at cost
Track collections and receivables agingAccountant
Accounting > Customers > Payments; Accounting > Reporting > Partner Reports > Aged Receivable
AutomatedMatches payments to invoices; the aging report is grouped by customer
Multi-level payment follow-up by days overdueReceivables accountant, Salesperson
Followup > Follow-up Reports; Followup > Follow-up Levels (also at Accounting > Configuration > Invoicing > Follow-up Levels)
AutomatedA customer with an overdue invoice goes into the Follow-up Reports automatically; each level matches a number of days overdue, automatically creates a reminder letter with the invoice attached (sent through the company's outgoing mail server) and can assign a task to the person in charge; when the customer pays, the level updates by itself to the real aging; there is a Follow-up button on the customer's report to send manually (Follow-up Reminder box); a salesperson only sees the customers they are responsible for
ControlBlocks: a company cannot have two levels with the same number of days overdue. A negative number of days means reminding before the due date as a courtesy notice. Automatic follow-up applies only to customers set to the Automatic follow-up type; customers set to Manual wait for someone to click send
Project track - 5. Profit and loss by project
View the project's Profitability table and drill down to documentsProject lead, Director
Project > Projects > (open a project) > Dashboard button > project dashboard page > Profitability panel; also opened from the sales order > Project button > Dashboard button
AutomatedRevenue comes from customer invoices; cost comes from timesheet hours, vendor bills and employee expenses; click any line to open the list of source documents
ControlThe viewer must belong to the project management group; the project must be Billable and have an analytic account; if any of these three conditions is missing, the Profitability table is hidden or empty with no message
Compare with the approved budgetDirector, Accountant
Budgets > Budgets Analysis; Project > Projects > (open a project) > Dashboard button > Dashboard (Budgets panel)
AutomatedShows the planned vs actual difference by item; opens the analytic entries that produced the actual figure; the Budget panel on the project Dashboard counts only confirmed budgets
ControlDisplay and comparison only, no blocking; the Total line has the opposite sign from the items (a positive Total means money left, a positive item means over budget)
Analyze profit and loss on other analytic axesManagement accountant
Accounting > Reporting > Management > Analytic Report; Accounting > Accounting > Analytic Items
AutomatedThe same cost line can be allocated across several axes (project, department, site...) without re-entering it; the Analytic Report is a pivot table, searchable by the Project field
Close the project and lock in the resultProject lead, Accountant
Project > Projects > (open a project) > stage bar > ... > Done
AutomatedClose the project with the Done stage (the stage bar is collapsed: click ... then choose Done); missing invoices are checked by the user, the system has not been seen to check when closing; there is no screen comparing against the original estimate
Rental track - 6. Set up equipment, sign the rental contract and deliver
Set up rental equipment and period-based price listsRental manager
Rental > Products > Products; Rental > Products > Pricelists; Rental > Configuration > Periodicity
AutomatedA base price for one base period (day), discounts for longer periods (week, month, quarter); define a product that charges late fees; the hourly price equals the daily price divided by 24
Set up the warehouse and rental locations, track by serial numberWarehouse keeper
Inventory > Configuration > Warehouse Management > Warehouses; Inventory > Configuration > Warehouse Management > Locations
AutomatedEach warehouse has its own rental delivery type, return type and route; a rental location shows which machines are at the customer; equipment is tracked by serial number
Prepare the rental quote and check machines available in the periodSalesperson
Rental > Orders > Orders
AutomatedChoose the rental period on the order line; the Rental Configuration box shows Remaining (units and serial numbers still available to rent in the period), and calculates the price by period and the discount by length (for example, weekly price = daily price x 7 x 0.9)
ControlA period in the past gives Remaining of 0 and no serial number can be chosen; a quantity above the remaining shows "Invalid fields: Serial Number"; the end date must be after the start date; the serial numbers chosen must match the quantity
Confirm the rental contractSalesperson
Rental > Orders > Orders > Confirm
AutomatedCreates ONE delivery slip that moves the equipment from the warehouse to the rental location, waiting to be confirmed at the delivery step; creates the reminder "Receive Back Rented Goods" for the person in charge
Deliver the equipment to the customerWarehouse keeper
Rental > Orders > Orders > (open order) > Delivery > Confirm Delivery
AutomatedThe order has no separate deliver button: click the Delivery smart button and confirm the outgoing stock transfer (Warehouse -> Rental); once confirmed, the order changes to Received (or Partially Received); the serial numbers delivered are recorded on the order line; the delivery slip creates no journal entry
ControlBlocks: you cannot pick up more than the quantity rented on the contract line
Swap rented equipment for another machineSalesperson, Warehouse keeper
Rental > Orders > Orders > (open order) > Swap
AutomatedThe Swap button opens the Confirm Swap dialog: choose the returned machine and the new machine by serial number; the system generates a receipt for the old machine and a delivery for the new one, updates the serial numbers on the order line and logs it in the order's history
ControlOnly equipment tracked by serial number can be swapped; the button appears only when the order is in Picked up status; no late fee is charged on a swap
See where the equipment isRental manager, Warehouse keeper
Rental > Rental Schedule; Rental > Reporting > Inventory Report; Inventory > Products > Lot/Serial Numbers
AutomatedThe Gantt by equipment shows which unit is rented, until when, and to which customer; the Inventory Report opened on the Location screen shows units by location (warehouse, rental location); the serial number of a unit at a customer does not record the customer name (the Customer field stays empty), see who holds it on the Gantt or the rental order; the order list has a Late Returns filter
Rental track - 7. Return, charges, maintenance and invoicing
Receive equipment back into the warehouseWarehouse keeper
Rental > Orders > Orders > (open order) > Return
AutomatedThe Return button opens the Confirm Return dialog: choose the quantity, serial numbers and return location; generates a receipt into the chosen location (it can be an inspection area); the order moves to Returned when everything is returned
ControlBlocks: you cannot return more than what was picked up; no return date in the future; the dialog leaves the quantity at 0 by default, and if you do not fill it in, it reports that you must enter at least one non-zero quantity
Charge late return feesWarehouse keeper, Accountant
Rental > Orders > Orders > (open order) > Return; the Late Fee line is added to the order automatically
AutomatedWhen a return is confirmed with a return date later than the due date plus the minimum late hours, the system automatically adds a Late Return Fee line to the order, calculated at the equipment's Day period price, in proportion to the time beyond the minimum late hours threshold
ControlThe fee applies only when the rental product has a late fee product set up, the returned quantity is greater than 0, and the delay exceeds the minimum delay; no fee on an equipment swap
Record damage or loss chargesWarehouse keeper, Accountant
Rental > Orders > Orders > (open an order) > Add a product
AutomatedManually add the product line Rental Equipment Damage Fee, enter the unit price (0 by default), then issue the invoice
Inspect and maintain equipment between rentalsTechnician
Maintenance > Maintenance > Maintenance Requests; Maintenance > Maintenance > Maintenance Schedule; Maintenance > Equipment
AutomatedWhen equipment is set to the Scheduled preventive maintenance mode with the product's maintenance calendar, the system automatically creates a maintenance request when it is due (a job that runs every day); in the By Default mode the system does not calculate the next maintenance date (the period field is hidden) and requests are created by hand; requests show on the maintenance calendar; equipment can be linked to serial numbers
ControlReceiving equipment back does not automatically create a maintenance request (there is no bridge between Return and Maintenance Request)
Repair when a fault is foundTechnician
Maintenance > Maintenance > Maintenance Requests (Create Repair Order button)
AutomatedFrom a maintenance request click Create Repair with materials; Confirm Repair, Start Repair, End Repair; a finished repair order does not automatically move the maintenance request to Repaired
Invoice rentals, and recurring invoices for long-term contractsAccountant
Rental > Orders > Orders > Create Invoice; Subscriptions > Subscriptions
AutomatedInvoices follow the rental order (with the late fee line; keep a draft to review); long-term contracts follow a subscription: each period renews into a new order, the unit is taken back on the old order (receipt at 07:30) and delivered again on the new order (delivery at 08:00) even though it stays at the customer
Analyze rental performanceDirector
Rental > Reporting > Rental Analysis
AutomatedRental revenue, quantity delivered and returned by equipment, customer and product group; a rental invoice report
Reports that answer the business owner's questions
- Project profitability (revenue, cost, drill down to documents)Project > Projects > (open project) > Dashboard > Profitability
- Timesheets by projectTimesheets > Reporting > Timesheets > By Project
- Timesheets by billing typeTimesheets > Reporting > Timesheets > By Billing Type
- Timesheets by employeeTimesheets > Reporting > Timesheets > By Employee
- Timesheets by taskTimesheets > Reporting > Timesheets > By Task
- Task analysisProject > Reporting > Tasks Analysis
- Analysis report by analytic axesAccounting > Reporting > Management > Analytic Report
- Aged receivablesAccounting > Reporting > Partner Reports > Aged Receivable
- Employee expense analysisExpenses > Reporting > Expenses Analysis
- Approval analysisApproval > Reports > Approval Analysis
- Follow-up report (overdue customers by level)Followup > Follow-up Reports
- Task completion velocity analysisProject > Reporting > Velocity Analysis
- Budget analysis (plan vs actual)Budgets > Budgets Analysis
- Budget reportAccounting > Reporting > Management > Budget Report
- Estimate reportEstimates > Reporting
- Rental schedule (equipment Gantt)Rental > Rental Schedule
- Rental inventory report (machines in the warehouse and at the customer)Rental > Reporting > Inventory Report
- Rental analysisRental > Reporting > Rental Analysis
Try each app
One shared system for 8 apps, loaded with 12 months of data from a fictional company. Once you sign in, the app you chose opens directly.
- Customer management (CRM)
Enter an opportunity, drag it through the stages to Won, then see the monthly win and loss rate.
- Sales
Create a quotation for two products, send it to the customer, then confirm it as a sales order.
- Employees
Create an employee record with a contract, then view the organization chart by department.
- Time Off
Create an annual leave request, check the remaining days and the requests waiting for approval.
- Attendance and attendance devices
See check-in and check-out times by month, late arrivals and early leaves, and the data downloaded from attendance devices.
- Payroll
Open a payslip to read the social insurance, personal income tax and net pay.
- Recruitment
Move an applicant through the interview rounds to a signed contract.
- Objectives management (OKR)
Create a quarterly objective, add key results and update a score to see the progress change.
Before you start
- The demo system is sharedAnyone who tries it sees what others have entered. Do not enter real information about your business, customers or employees.
- Data is reloaded every morningData is deleted and reloaded at 05:00 or 06:00 Vietnam time, depending on the system. Anything entered during the day is gone the next morning.
- Sample data built for the demoCompany names, documents and amounts in the demo only illustrate the workflows.
- When you use Viindoo in productionYour own system: only people with an account can sign in, with permissions set by role; information security is managed under ISO 27001:2022. View certificate
When you have finished trying it
Book an expert (30 minutes)
A Viindoo expert reviews your process and shows which parts you can use right away and which need configuration or additional development. Bring the questions you ran into while trying it yourself.
Book an expertFrequently asked questions
Is the demo system real software?
Yes. This is running Viindoo software, with the same functions you will use. Only the data is sample data built for the demo.
Do I need to register or provide a phone number?
No. The demo system and the guides (in Vietnamese) are open to everyone. Only the separate 15-day trial requires an account.
Can other people see the data I enter in the demo?
Yes, because the demo system is shared. The data is reloaded every morning. To try it with real data, use the separate 15-day trial.
What if my industry is not on the list?
You can try each app on the shared system under "Try each app", or book an expert to see a demo built around your own process.
Does Viindoo have reports under Vietnamese accounting standards?
Yes. The demo systems include the Statement of Financial Position (B01-DN) under Circular 99 and accounting books in Vietnamese formats.
- ISO 27001:2022Information security management system
- ISO 9001:2015Quality management system
- Software copyright certificatesIssued for software developed by Viindoo


