Viindoo demo handbook for manufacturing and assembly
Part II. Manufacturing engineering
Lessons in this part
- Lesson 7. Current manufacturing engineering configuration
- Lesson 8. Two-level bill of materials: one BoM for several colours
- Lesson 9. Work centers, operations, hourly rates and expense accounts
- Lesson 10. Standard consumption and loss rate
- Lesson 11. Engineering change orders (PLM)
- Lesson 12. Submitting a bill of materials for approval
- Lesson 13. Manufacturing engineering reports
- Lesson 14. Practice exercise: a second vehicle model
This part answers these questions: what a vehicle is made of, at which station each part is made and how long it takes, what each hour at a station costs and which account it is posted to, how much material is lost, and how a design change is made and who approves it. The readers are the process engineer, the production manager and the cost accountant (for the stations, hourly rates and expense accounts).
Every create action in this part is done on your company's own vehicle model called Zeta Electric Vehicle, made of one frame assembly (a semi-finished product) and two colours. Your company does not have to edit anyone else's bill of materials. The lessons in the part Production planning reuse exactly this model, so it is best to work through the lessons in order, from the first to the last.
Lesson 7. Current manufacturing engineering configuration
About 15 minutes. By the end of this lesson your company knows which features the system has switched on for manufacturing engineering, what each feature is for and what is lost if it is switched off, how much each station charges per hour, and what an existing bill of materials looks like. This lesson is read-only; nothing is created.
Step 1 - Open the Manufacturing settings screen
Go to Manufacturing > Configuration > Settings. Look at the first two groups: Operations and Planning.
Manufacturing > Configuration > Settings
What you should see: in the Operations group, the Work Orders box is ticked (with the shortcut Work Centers), Subcontracting is ticked, By-Products is ticked and Shop Floor Control - Accounting is ticked; Work Order Dependencies, Unlock Manufacturing Orders and Allocation Report for Manufacturing Orders are not ticked. The Planning group has Master Production Schedule with the Time Range set to Weekly and Number of Period Columns equal to 12.
Step 2 - See the manufacturing features that are switched on
Scroll down to the group Viindoo Manufacturing Features.
Manufacturing > Configuration > Settings
What you should see: the boxes Product Lifecycle, Shop Floor Control, Master Production Schedule, Manufacturing Progress Management, Production Advanced Filter, MRP Standard Consumption, Manufacturing Standard Consumption Analysis, Manufacturing Backdate and MRP Barcode are ticked.
Step 3 - See the manufacturing cost and accounting group
Scroll further down to the group Viindoo Manufacturing Costing & Accounting.
Manufacturing > Configuration > Settings
What you should see: Advanced MRP Accounting, Advanced MRP Landed Cost, BoM Component Cost Percentage and BoM Component Cost Percentage - Unbuild are ticked; MRP Sale Margin is not ticked. Below is the group Viindoo Manufacturing Integrations, with Manufacturing Quality Control, Maintenance - MRP, Documents - MRP and Stock Equipment Bom Kit ticked and Multi-Warehouse Access Control - Manufacturing not ticked.
The table below reads through all the features that belong to manufacturing engineering. The last column is the one that decides: it tells your company what is lost if a feature is switched off.
| Feature (label on screen) | What it is for | What is lost if it is off |
|---|---|---|
| Work Orders | Splits a manufacturing order into operations done at each work center, tracks real time, schedules work | A bill of materials has no operations, there are no work-center hours in the cost, and there is no operation planning screen. Be careful: if you untick it and click Save, every existing operation is archived |
| By-Products | One order makes several products (A + B become C + D) | By-products cannot be declared on a bill of materials |
| Product Lifecycle | Manages bills of materials, routings, versions and engineering change orders | There is no PLM app and no engineering change order can be created |
| Master Production Schedule | Plans manufacturing orders or purchase orders from a sales forecast | There is no master production schedule screen |
| MRP Standard Consumption | Declares the standard quantity and the loss rate on each bill of materials line | A bill of materials line has no Standard Quantity and Loss Rate columns |
| Manufacturing Standard Consumption Analysis | Compares the standard with the actual consumption of each order | There is no Loss Components Analysis report |
| Manufacturing Progress Management | Tracks the progress percentage of each order | An order does not show Progress |
| Production Advanced Filter | Finds child and source orders right in the search box | The search box has no Child MOs and Source MOs options |
| Advanced MRP Accounting | Posts the labor and manufacturing cost entries when an order is completed | Labor hours do not go into the cost of the finished product |
Step 4 - See the list of work centers
Go to Manufacturing > Configuration > Work Centers. Each work center is one working station of the workshop.
Manufacturing > Configuration > Work Centers
What you should see: the list of stations with the columns Work Center, Code, Tag, Alternative Workcenters, Cost per hour, Capacity, Time Efficiency and OEE Target. In the picture there are 12 lines: the 11 stations below plus Tổ hàn khung Zeta (Zeta frame welding team), the station created in the lesson Work centers, operations, hourly rates and expense accounts.
The stations that exist, with an hourly rate that is an illustrative (assumed) figure so that your company can see how the calculation works; it is not a real price:
| Station | Cost per hour (VND) |
|---|---|
| Tổ khung (Frame team) | 210,000 |
| Tổ gá cụm các chi tiết nhựa (Plastic parts sub-assembly team) | 165,000 |
| Tổ lốp (Tire team) | 150,000 |
| Tổ gá cụm càng trước (Front fork sub-assembly team) | 170,000 |
| Tổ gá cụm ghi đông (Handlebar sub-assembly team) | 165,000 |
| Tổ gá cụm càng sau (Rear fork sub-assembly team) | 170,000 |
| Tổ điện (Electrical team) | 195,000 |
| Tổ lắp ráp trên chuyền (Assembly line team) | 230,000 |
| Tổ kiểm tra xuất xưởng (Final inspection team) | 185,000 |
| Tổ sửa chữa và điều chỉnh (Repair and adjustment team) | 175,000 |
| Tổ nhập kho và đóng gói (Warehouse receiving and packing team) | 130,000 |
All 11 stations use the calendar "Giờ hành chính 40 giờ/tuần" (office hours, 40 hours per week), a time efficiency of 100%, an employee hourly cost of 41,000 VND and the expense account 627 Manufacturing overhead.
Step 5 - Open one station to read the important boxes
Click the line Tổ khung (Frame team).
Manufacturing > Configuration > Work Centers > Tổ khung
What you should see: at the top are the smart buttons Operations, OEE, Lost, Load and Performance. The Costing Information section has the Cost per hour for each work center, the Overhead Cost Type (Manufacturing Overhead), the Employee Hourly Cost, the Direct Labor Cost Type (Direct Labor) and the Expense Account, which is 627 Manufacturing overhead.
The two cost boxes and the account are the technical link to accounting: when an order is completed, the real hours of an operation multiplied by the hourly rate are posted to the expense account of the station and counted in the cost of the finished product. If Expense Account is left empty, the system takes the expense account of the product category of the finished product (for the category Thành phẩm xe điện (Finished electric vehicles) that is currently 632 Cost of goods sold), which means the labor hours go straight to cost of goods sold instead of passing through manufacturing overhead. So every new station must have an account chosen (see the lesson Work centers, operations, hourly rates and expense accounts).
Step 6 - See the list of bills of materials
Go to Manufacturing > Products > Bills of Materials.
Manufacturing > Products > Bills of Materials
What you should see: each line is one bill of materials with the columns Product, Reference, BoM Type and Company (28 bills of materials in the picture). BoM Type has three kinds: Manufacture this product (a normal bill of materials, which creates manufacturing orders), Kit (the components are expanded straight into the order of the parent product and no order of their own is created) and Subcontracting (used for outside subcontractors).
Step 7 - Open the bill of materials of the Viindoo Lumi electric motorbike
Click the line [XMD-LUMI] Viindoo Lumi Electric Motorbike, then click the Operations tab.
Manufacturing > Products > Bills of Materials > [XMD-LUMI] Viindoo Lumi Electric Motorbike

What you should see: the Components tab has two first lines, Powder-coated frame assembly - Lumi and Electrical harness assembly - Lumi (these are semi-finished products, each with its own bill of materials), followed by the individual components; the plastic body kit lines apply only to particular colours. The Operations tab has three operations: Lắp ráp tổng thành trên chuyền (Final assembly on the line; 45 minutes, at Tổ lắp ráp trên chuyền), Lắp bánh xe, phanh (Fitting wheels and brakes; 15 minutes, at Tổ lốp) and Kiểm tra hoàn thiện, đóng số khung (Final inspection and frame number stamping; 15 minutes, at Tổ kiểm tra xuất xưởng). These durations are illustrative (assumed) figures; the total duration at the bottom of the table is 75:00. The top of the form has the smart buttons Operations Performance, BoM Overview, ECO Original and ECOs.
Step 8 - See the kinds of engineering change order
Go to PLM > Configuration > ECO Types.
PLM > Configuration > ECO Types
What you should see: the list with the column Type Name and two types: New Product Introduction and Design Change. Each engineering change order picks one type so that it can be counted later (see the lesson Engineering change orders (PLM)).
The approval type for a bill of materials and for an engineering change order (who approves, in which sequence) is set up in the part Approvals.
Lesson 8. Two-level bill of materials: one BoM for several colours
About 35 minutes. By the end of this lesson your company has a new vehicle model with two levels (the vehicle and the frame assembly), with only one bill of materials in which the plastic body kit changes by itself with the colour, and can see the whole structure and the standard cost on one screen.
Your company works from the low level up to the high level: first create the frame assembly and its bill of materials, then create the vehicle and the bill of materials of the vehicle that contains the frame assembly.
Step 1 - Open the product list
Go to Manufacturing > Products > Products and click New.
Manufacturing > Products > Products
What you should see: the product list as cards; clicking New opens an empty product form.
Step 2 - Name the frame assembly and give it a category
Type the name Zeta Frame Assembly. In the Category box choose All / Bán thành phẩm (All / Semi-finished goods). Untick Sales and Purchase, because the frame assembly is made only to be fitted into the vehicle.
Manufacturing > Products > Products > New
What you should see: the name Zeta Frame Assembly, the Category box is All / Bán thành phẩm, and the Sales and Purchase boxes are no longer ticked. The category Bán thành phẩm (Semi-finished goods) uses average costing and automated inventory valuation.
Step 3 - Choose the supply routes for the frame assembly
Click the Inventory tab. In Routes untick Buy, then tick Manufacture and Replenish on Order (MTO). Click Save.
Manufacturing > Products > Products > Zeta Frame Assembly > Inventory tab
What you should see: the two routes Replenish on Order (MTO) and Manufacture are ticked and Buy is not. A newly created product always has Buy ticked, so it must be removed. The Manufacture route gives the frame assembly its manufacturing order; the MTO route makes every confirmation of a vehicle automatically create a child order for the frame assembly. If only Manufacture is ticked, the vehicle order can still be confirmed but the frame assembly shows Not Available and there is no child order.
Step 4 - Open the list of bills of materials
Go to Manufacturing > Products > Bills of Materials and click New.
Manufacturing > Products > Bills of Materials
What you should see: the list of existing bills of materials; clicking New opens an empty bill of materials form.
Step 5 - Choose the product of the bill of materials
In the Product box type Zeta Frame Assembly and choose the suggestion line.
Manufacturing > Products > Bills of Materials > New
What you should see: the Product box is Zeta Frame Assembly, Quantity is 1.00 and BoM Type is Manufacture this product.
Step 6 - Add the components of the frame assembly
In the Components tab click Add a line. Type the component code, choose the suggestion line and enter the Standard Quantity. Do three lines: LK0071 (Veras, Bella E Motorbike Frame) quantity 1; LK0022 (A-Leg Veras, Bella E) quantity 1; and SON-TD-KHUNG (Powder Coating for Frame (kg)) quantity 0.8. Type the decimal number with a decimal point (0.8), as the interface is in English.
Manufacturing > Products > Bills of Materials > New > Components tab
What you should see: each click on Add a line gives an empty line, and the Component box shows a list of suggestions as you type.
Step 7 - Save the bill of materials of the frame assembly
Click Save manually (the cloud icon with an arrow next to the name).
Manufacturing > Products > Bills of Materials > Zeta Frame Assembly
What you should see: three lines [LK0071] 1.00, [LK0022] 1.00 and [SON-TD-KHUNG] 0.80; on the right, the chatter records that the bill of materials was created. In the picture the powder coating line already shows Loss Rate 5.00 and a quantity of 0.84 including the loss, and the green ribbon FULLY APPROVED is there, because this bill of materials has since had its loss rate set (see the lesson Standard consumption and loss rate) and been approved; on your new bill of materials the Loss Rate is 0.00 and there is no ribbon.
Step 8 - Create the vehicle product
Go to Manufacturing > Products > Products and click New. Type the name Zeta Electric Vehicle, choose Category All / Thành phẩm xe điện (All / Finished electric vehicles), type Sales Price 25,000,000, tick Track Inventory and, in the box next to it, choose By Unique Serial Number (so that every vehicle has its own frame number). Untick Purchase; keep Sales. The sales price of 25 million VND is an illustrative (assumed) figure.
Manufacturing > Products > Products > New
What you should see: Sales Price 25,000,000.00 VND, Track Inventory is ticked and the box next to it reads By Unique Serial Number, Category is All / Thành phẩm xe điện, the Sales box is ticked and Purchase is not.
Step 9 - Declare the two colours
Click the Attributes & Variants tab, click Add a line. In Attribute choose Vehicle colour, in Values choose Matte black and Burgundy.
Manufacturing > Products > Products > Zeta Electric Vehicle > Attributes & Variants tab
What you should see: one line Vehicle colour with two tags Matte black and Burgundy. After saving, the product has two variants, Zeta Electric Vehicle (Matte black) and Zeta Electric Vehicle (Burgundy).
Step 10 - Choose the Manufacture route for the vehicle and save
Click the Inventory tab. Untick Buy, tick Manufacture. Click Save.
Manufacturing > Products > Products > Zeta Electric Vehicle > Inventory tab
What you should see: Manufacture is ticked and Buy is not. After saving, the top of the form has the smart button Bill of Material.

Step 11 - Make the bill of materials of the vehicle, the common components
Go to Manufacturing > Products > Bills of Materials, click New, choose Product Zeta Electric Vehicle. In the Components tab add six lines, each with quantity 1 except the tire with quantity 2: Zeta Frame Assembly (this is the second level), LK0230 (Motor 60V1200W - Viindoo 10-inch Rim Basic Brake), LK0188 (Front Disc Rim 2.15x10 Vepas, V6), LK0082 (Tubeless Tire 3.5-10, quantity 2), LK0206 (Headlight Veras, Bella E) and LK0144 (Viindoo Charger 60V20Ah).
Manufacturing > Products > Bills of Materials > New > Components tab
What you should see: six lines, the first one is Zeta Frame Assembly. The frame assembly sits in the bill of materials of the vehicle as a component, and because it has a bill of materials of its own, the system understands it as the second level.
Step 12 - Add the plastic body kit by colour, then save
Click the slider icon at the end of the header row of the components table and tick the column Apply on Variants. Add two lines: OPS-AURA-DN (Painted Plastic Body Kit Aura - Matte Black), and in the Apply on Variants column choose Vehicle colour: Matte black; and OPS-AURA-DD (Painted Plastic Body Kit Aura - Burgundy Red), choose Vehicle colour: Burgundy. Click Save manually.
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > Components tab

What you should see: the two body kit lines have a colour tag in the Apply on Variants column (Vehicle colour: Matte black and Vehicle colour: Burgundy); the other six lines leave this column empty (they are used for both colours). The existing model Viindoo Lumi Electric Motorbike uses exactly this method for 5 colours and 2 versions.
Step 13 - Open the BoM Overview
Click the smart button BoM Overview at the top of the bill of materials form.
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > BoM Overview
What you should see: a new screen titled Zeta Electric Vehicle (Matte black), with the buttons Manufacture, Print All Variants and Unfold, and a structure table with the columns Quantity, Lead Time, Route, BoM Cost and Product Cost.
Step 14 - Expand the two-level structure
Click the Unfold button (after the click the button changes to Fold).
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > BoM Overview
What you should see: the line Zeta Frame Assembly opens up to its three components (frame, A-leg, powder coating 0.84, which is 0.80 plus the 5% loss once the loss rate is set); the common components of the vehicle sit at the same level as the frame assembly. The Operations lines show the minutes of each work center. In the picture the vehicle line has BoM Cost 5,036,209 VND and Product Cost 5,214,532 VND. For the colour Matte black only the body kit Aura - Matte Black is there.
Step 15 - Switch to the colour Burgundy
In the Variant box at the top, type Zeta and choose Zeta Electric Vehicle (Burgundy).
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > BoM Overview
What you should see: the title changes to Zeta Electric Vehicle (Burgundy) and the body kit line changes to Aura - Burgundy Red (Product Cost 5,204,032 VND), while the other lines stay the same. At the bottom of the table the Unit Cost line sums the whole structure (5,036,209 VND in BoM Cost). That is what one bill of materials for several colours gives: there is no need to make two bills of materials, and the wrong kit cannot be fitted by mistake.
Lesson 9. Work centers, operations, hourly rates and expense accounts
About 20 minutes. By the end of this lesson your company has a new station with an hourly rate and the expense account 627, and has attached the operations of the station to the bill of materials of the frame assembly and of the vehicle just created.
Step 1 - Open the list of work centers
Go to Manufacturing > Configuration > Work Centers and click New.
Manufacturing > Configuration > Work Centers
What you should see: the list of stations; clicking New opens an empty form.
Step 2 - Name the station and set the hourly rate
In Work Center Name type Tổ hàn khung Zeta (Zeta frame welding team). In Cost per hour (per work center) type 210,000; in the second line (per employee) type 41,000. These two figures are illustrative (assumed), at the same level as Tổ khung (Frame team).
Manufacturing > Configuration > Work Centers > New
What you should see: Cost per hour 210,000 VND per work center and 41,000 VND per employee. Under the two hourly rates, Overhead Cost Type is Manufacturing Overhead and Direct Labor Cost Type is Direct Labor; they tell the cost report in which cost column the machine hour and the employee hour appear.
Step 3 - Choose the expense account 627
In Expense Account type 627 and choose 627 Manufacturing overhead. Click Save manually.
Manufacturing > Configuration > Work Centers > Tổ hàn khung Zeta

What you should see: the Expense Account box shows 627 Manufacturing overhead; the chatter on the right records the creation of the record. A newly created station leaves this box empty (627 is not filled in by itself), so this step is mandatory if your company wants labor hours to go into manufacturing overhead.
Step 4 - Open the Operations tab of the bill of materials of the frame assembly
Go to Manufacturing > Products > Bills of Materials, open the bill of materials Zeta Frame Assembly and click the Operations tab.
Manufacturing > Products > Bills of Materials > Zeta Frame Assembly > Operations tab
What you should see: the tab is empty, with two buttons Add a line and Copy Existing Operations (used to take over the whole list of operations of another bill of materials).
Step 5 - Add an operation
Click Add a line. In the Create Operations dialog: in Operation type Hàn khung, sơn tĩnh điện (Frame welding and powder coating); in Work Center choose Tổ hàn khung Zeta; leave Duration Computation on Set duration manually and in Default Duration type 40:00 (40 minutes, assumed); the other boxes (Apply on Variants, Employee Capacity, the Work Sheet tab) stay as they are. Click Save & Close, then click Save manually on the bill of materials form.
Manufacturing > Products > Bills of Materials > Zeta Frame Assembly > Operations tab > Add a line

What you should see: one line Hàn khung, sơn tĩnh điện of Tổ hàn khung Zeta, duration 40:00; the total duration at the bottom of the table is 40:00. The Duration Computation box has two ways: Compute based on tracked time (taken from the orders already done) and Set duration manually (your company enters it).
Step 6 - Add two operations to the bill of materials of the vehicle
Open the bill of materials Zeta Electric Vehicle, Operations tab. Add: Lắp ráp tổng thành trên chuyền (Final assembly on the line) at Tổ lắp ráp trên chuyền (Assembly line team) 45:00, click Save & New, then Kiểm tra hoàn thiện, đóng số khung (Final inspection and frame number stamping) at Tổ kiểm tra xuất xưởng (Final inspection team) 15:00, click Save & Close. Click Save manually.
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > Operations tab
What you should see: two lines with their stations and durations 45:00 and 15:00; the total at the bottom of the table is 60:00. From now on, a manufacturing order for the Zeta vehicle has operations at these stations, and the labor hours at completion are calculated at the hourly rate of each station.
Lesson 10. Standard consumption and loss rate
About 10 minutes. By the end of this lesson your company can declare the loss for one component, and sees that the manufacturing order takes the quantity that already includes the loss.
Step 1 - Open the bill of materials of the frame assembly
Open the bill of materials Zeta Frame Assembly, Components tab, and find the line [SON-TD-KHUNG] Powder Coating for Frame (kg).
Manufacturing > Products > Bills of Materials > Zeta Frame Assembly > Components tab
What you should see: the powder coating line has Standard Quantity 0.80, a Loss Rate column and a third column. The third column (Quantity; some views title it Qty. Included Consumption) is the quantity that already includes the loss; it is the quantity that the manufacturing order will take. On a new bill of materials the line reads 0.80, 0.00 and 0.80; in the picture it already reads 0.80, 5.00 and 0.84.
Step 2 - Enter the loss rate
Click the Loss Rate box of the powder coating line and type 5 (meaning 5%).
Manufacturing > Products > Bills of Materials > Zeta Frame Assembly > Components tab
What you should see: the Loss Rate box shows 5.
Step 3 - Save and read the result
Click Save manually.
Manufacturing > Products > Bills of Materials > Zeta Frame Assembly
What you should see: the powder coating line has Standard Quantity 0.80, Loss Rate 5.00 and the third column changes to 0.84 (0.80 multiplied by 1.05). When an order makes two frame assemblies, the powder coating line of that order needs 1.68 (see the lesson A sales order generates a make-to-order manufacturing order, the child order of the frame assembly). After the order is completed, the report Loss Components Analysis compares the actual consumption with this standard quantity (see the lesson Manufacturing engineering reports).
Lesson 11. Engineering change orders (PLM)
About 40 minutes. By the end of this lesson your company can change one component in a bill of materials, apply the change to a running manufacturing order through an approved engineering change order, and see that the order has changed.
Example: the Zeta vehicle changes to the new charger (LK0143). Your company does two things: makes a new bill of materials ZETA-V2 with the new charger, then makes an engineering change order so that the running manufacturing order moves to the new bill of materials.
Step 1 - Open the list of manufacturing orders
Go to Manufacturing > Operations > Manufacturing Orders and click New.
Manufacturing > Operations > Manufacturing Orders
What you should see: the list of manufacturing orders; clicking New opens an empty order.
Step 2 - Choose the vehicle to make
In the Product box type Zeta and choose Zeta Electric Vehicle (Matte black). Leave the quantity at 1.
Manufacturing > Operations > Manufacturing Orders > New
What you should see: the Product box is Zeta Electric Vehicle (Matte black); the Bill of Material box and the components table fill in by themselves from a bill of materials of the vehicle. If ZETA-V2 already exists on your system, the order proposes it right away (as in the picture); in that case choose the older bill of materials Zeta Electric Vehicle in the Bill of Material box, so that the change order below has something to change.
Step 3 - Save the order
Click Save manually.
Manufacturing > Operations > Manufacturing Orders > New
What you should see: the title changes from New to an order number like NM1/MO/... (NM1/MO/01285 in the picture), the status is Draft and the Confirm button is lit.
Step 4 - Confirm the order
Click Confirm.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/...
What you should see: the status is Confirmed; at the top there are two more smart buttons, Child MO (1; the order that makes the frame assembly) and Transfers (1); Component Status reads Not Available because the frame assembly is not yet available.
Step 5 - Duplicate the bill of materials of the vehicle
Go to Manufacturing > Products > Bills of Materials and open the bill of materials Zeta Electric Vehicle. Click the gear icon Actions next to the name and choose Duplicate.
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > Actions > Duplicate
What you should see: the Actions menu has BoM Overview, Archive, Duplicate, Delete, Move Message Thread and Get Approved; choosing Duplicate opens an unsaved copy.
Step 6 - Set the reference and change the charger
In Reference type ZETA-V2. On the charger line LK0144, click the component box, clear it and type LK0143, then choose [LK0143] Viindoo Charger 60V20Ah - Version 2.
Manufacturing > Products > Bills of Materials > Zeta Electric Vehicle > Duplicate
What you should see: the charger line is [LK0143] Viindoo Charger 60V20Ah - Version 2 (circled in the picture), and the other lines are unchanged.
Step 7 - Save the new bill of materials
Click Save manually.
Manufacturing > Products > Bills of Materials > ZETA-V2: Zeta Electric Vehicle
What you should see: the title ZETA-V2: Zeta Electric Vehicle; the product Zeta Electric Vehicle now has two bills of materials. From here on, when you create a new order for the vehicle, look at the Bill of Material box on the order to see which bill of materials the system took (if you no longer want the old one, Archive the old bill of materials).
Step 8 - Open the list of engineering change orders
Go to PLM > Changes > Engineering Change Orders and click New.
PLM > Changes > Engineering Change Orders
What you should see: the list (it may already hold a few orders as cards); clicking New opens an empty order with the statuses Draft, To Approve, Approved, Done, Refused, Cancelled.
Step 9 - Fill in the engineering change order
Fill in: Short Summary Switch to the new charger for the Zeta order; Type Design Change; Apply on choose Production; Production choose the manufacturing order from steps 1 to 4 (NM1/MO/01228 in the picture); New Bill of Materials choose ZETA-V2: Zeta Electric Vehicle.
PLM > Changes > Engineering Change Orders > New
What you should see: Product and Bill of Materials (the current bill of materials) fill in from the manufacturing order; the New Bill of Materials box is ZETA-V2: Zeta Electric Vehicle. The three choices of Apply on are Bill of Materials, Product and Production; this lesson uses Production because the goal is to change a running order. The status bar shows Draft, To Approve, Approved, Done, Refused, Cancelled, the button Apply Changes is at the top left and the smart buttons Approval Request and Document are at the top.
Step 10 - Save and view the component changes
Click Save manually, then click the Component Changes tab.
PLM > Changes > Engineering Change Orders > ECO... > Component Changes tab

What you should see: the order number has the prefix ECO... (ECO0011 in the picture, with the status bar on Done, the Is Effective switch on and a green FULLY APPROVED ribbon); the comparison table (columns Type, Product, Quantity, Product UoM) says Add for the new charger and Remove for the charger LK0144 (negative quantity -1.00). The table also lists the Burgundy Red body kit line with Add; when the change is applied to the order, only the kit of the order's own colour is used (see step 17).
Step 11 - Send the change order for approval
Click the gear icon Actions next to the name of the engineering change order.
PLM > Changes > Engineering Change Orders > ECO... > Actions
What you should see: the gear icon is circled; the menu has the lines Archive, Duplicate, Delete, Move Message Thread and Get Approved.
Step 12 - Choose Get Approved
Click Get Approved.
PLM > Changes > Engineering Change Orders > ECO... > Actions > Get Approved
What you should see: the dialog Submit for Approval opens.
Step 13 - Create the approval request
In the dialog, Approval Request Type is Engineering Change Order. Click Create Approval Request.
PLM > Changes > Engineering Change Orders > ECO... > Actions > Get Approved
What you should see: the dialog has a blue note that one approval is created with all the lines (Multiple records per approval request), a title like Engineering Change Order for ECO0012: ... from
Step 14 - Submit the request
Click Submit.
Approval > Approval Request > Request > [APVL...] Engineering Change Order for ECO...
What you should see: the status changes to To Approve, Next Approver(s) is Phạm Thu Trang and Minimum Approvals is 1; the buttons Refuse, Cancel and View ECO appear, together with Approve for an approver (in the picture Force Approval is shown instead, because the logged-in account is not in the approver list). The yellow warning reads No manager of this employee is a Team Approver; Phạm Thu Trang approves instead. An Approval administrator can add the manager to Team Approver. It means that no manager of the employee who submits the request is a team approver, so the request goes to the approver who has been declared. The request lines at the bottom show the change order with the state To Approve. The request in the picture is in the company Công ty CP Cơ khí Chính xác Viindoo.
Step 15 - Approve the request
The approver clicks Approve. The account of your company in the trial version is exactly an approver of this kind.
Approval > Approval Request > Request > [APVL...] Engineering Change Order for ECO...
What you should see: the status is Approved, Approval Progress is 100% and Approved Date has a date and time; the buttons Refuse, Mark as Done, Cancel and View ECO appear.
Step 16 - Mark as done to apply the change
Click Mark as Done. This is the step that makes the engineering change order take effect.
Approval > Approval Request > Request > [APVL...] Engineering Change Order for ECO...
What you should see: the request status is Done; only Cancel and View ECO remain; the chatter has the line Approved → Done.
Step 17 - Check that the manufacturing order has changed
Open the manufacturing order from steps 1 to 4 again.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/...
What you should see: the Bill of Material box has changed to ZETA-V2: Zeta Electric Vehicle (circled in the picture; the order is NM1/MO/01223 there); in the components table the line [LK0143] Viindoo Charger 60V20Ah - Version 2 replaces the old charger; the body kit is still Aura - Matte Black, the right colour for the order. The ECO smart button shows 1.
Step 18 - View the engineering change order after it is applied
Open the engineering change order again.
PLM > Changes > Engineering Change Orders > ECO...
What you should see: the status bar on Done, the Is Effective switch on, the green FULLY APPROVED ribbon, and the chatter records the status changes.
Good to know. The Apply on: Bill of Materials option (to change the common bill of materials for later orders) on this trial system goes through approval and can be marked as done, but the system does not create a new revision of the bill of materials, so the bill of materials does not change by itself. To change the bill of materials for later orders, your company duplicates the bill of materials as in steps 5 to 7 and then Archives the old bill of materials; the engineering change order of the type Production is used to change the orders that are running, as in this lesson.
Lesson 12. Submitting a bill of materials for approval
About 5 minutes. By the end of this lesson your company has sent the bill of materials ZETA-V2: Zeta Electric Vehicle for approval. How the approver approves is covered in the part Approvals (lesson Submitting and approving an approval request).
Step 1 - Open the bill of materials to approve
Open the bill of materials ZETA-V2: Zeta Electric Vehicle and click the gear icon Actions next to the name.
Manufacturing > Products > Bills of Materials > ZETA-V2: Zeta Electric Vehicle > Actions
What you should see: the gear icon is circled on the bill of materials ZETA-V2: Zeta Electric Vehicle.
Step 2 - Choose Get Approved
Click Get Approved.
Manufacturing > Products > Bills of Materials > ZETA-V2: Zeta Electric Vehicle > Actions > Get Approved
What you should see: the menu opens with the line Get Approved circled.
Step 3 - Create the request
In the dialog Submit for Approval, Approval Request Type is already Bill of Materials. Click Create Approval Request.
Manufacturing > Products > Bills of Materials > ZETA-V2: Zeta Electric Vehicle > Actions > Get Approved
What you should see: the dialog has a blue note that the type is configured with One record per approval request (one approval is created for each line), and the Source Records table (columns Product, Approval Title, BoM Code, Employee, Quantity, Unit of Measure) with one line Bill of Materials for ZETA-V2: Zeta Electric Vehicle, BoM Code ZETA-V2.
Step 4 - Read the request just created
The system opens the approval request.
Approval > Approval Request > Request > [APVL...] Bill of Materials for ZETA-V2: Zeta Electric Vehicle
What you should see: the request number like [APVL...] (APVL00075 in the picture), the status Draft, the Submit and View Bill of Materials buttons at the top left, the BoM Lines tab listing the components (each in the state Draft), the Approvers tab listing the approvers. The yellow warning reads Approval request is invalid due to missing required information: Employee linked to the requester. Please complete the employee information or contact HR for assistance. It appears when the account that creates the request has no employee record; the request can still be submitted. The chatter shows Approval Request created.
Lesson 13. Manufacturing engineering reports
About 15 minutes. The manufacturing engineering part has the following reports. The table lists all of them; the three most important screens are walked through below.
| Report | What question it answers | Path |
|---|---|---|
| BoM Overview (button on the bill of materials) | What a vehicle is made of at every level, what the standard cost is, which kit is used for which colour | Manufacturing > Products > Bills of Materials > (open a bill of materials) > BoM Overview |
| Operations Performance (button on the bill of materials) | How efficiently the operations of this bill of materials run | Manufacturing > Products > Bills of Materials > (open a bill of materials) > Operations Performance |
| OEE, Lost, Load, Performance (buttons on the work center) | How much of its capacity this station uses, where hours are lost | Manufacturing > Configuration > Work Centers > (open a station) |
| Loss Components Analysis | Which component is consumed more than the standard, by how many percent | Manufacturing > Reporting > Loss Components Analysis |
| Loss By-products Analysis | By-products obtained compared with the standard | Manufacturing > Reporting > Loss By-products Analysis |
| ECOs (PLM) | How many engineering change orders, of which type, for which product | PLM > Reporting > ECOs |
| PLM Dashboard | Which engineering change orders are open, by type | PLM > Dashboard |
The other reports in the menu Manufacturing > Reporting (the manufacturing cost report, the shop-floor entries, overall equipment effectiveness, work orders) belong to the parts Shop floor production and Accounting and costing.
Step 1 - Open the Loss Components Analysis report
Go to Manufacturing > Reporting > Loss Components Analysis.
Manufacturing > Reporting > Loss Components Analysis
What you should see: a pivot table by component (one row per component, with a Total row on top and the Measures button) with the columns Standard Quantity, Standard Loss Rate (%), a second Standard Quantity (the quantity that includes the loss), Actual Consumption Qty., Actual Loss Rate (%), Difference Qty. and Difference Rate (%); the default filter is Done. A negative number in the difference column means consumption was less than the standard. The figures change from day to day, so the handbook does not quote fixed numbers.
Step 2 - Open the Loss By-products Analysis report
Go to Manufacturing > Reporting > Loss By-products Analysis.
Manufacturing > Reporting > Loss By-products Analysis
What you should see: the screen says No data to display (with the hint Try to add some records, or make sure that there is no active filter in the search bar.) when no completed order has made a by-product yet. This is a correct result, not an error.
Step 3 - Open the ECOs report
Go to PLM > Reporting > ECOs.
PLM > Reporting > ECOs
What you should see: a pivot table titled Engineering Change Orders that counts the change orders by Type (column Design Change) and by product (rows [BTP-KHUNG-AURA] Powder-coated frame assembly - Aura 1 and Zeta Electric Vehicle 2; total 3). The counts reflect the orders on the system.
Step 4 - Open the PLM dashboard
Go to PLM > Dashboard.
PLM > Dashboard
What you should see: the PLM Dashboard with one card per type of change order: New Product Introduction (0 Engineering Changes) and Design Change (3 Engineering Changes).
Lesson 14. Practice exercise: a second vehicle model
About 45 minutes. There are no step-by-step pictures. Your company does a complete manufacturing engineering cycle for a new vehicle model, then checks it.
The task. Your company has the model Zeta Electric Vehicle Mini made of:
- its own frame assembly (a semi-finished product) welded at the station Tổ hàn khung Zeta (Zeta frame welding team) in 30 minutes, with an 8% loss on the powder coating;
- three colours Matte black, Burgundy, Moss green, each with its own plastic body kit (use the Aura kit of each colour);
- final assembly on the line for 40 minutes at Tổ lắp ráp trên chuyền (Assembly line team);
- only the approval of the bill of materials is needed before it goes into production.
What to do.
- Create the frame assembly (routes Manufacture and MTO, Buy not ticked) and its bill of materials with one operation.
- Create the vehicle with three colours, tracked by serial number, route Manufacture.
- Make the bill of materials of the vehicle with the frame assembly, at least four common components and three body kit lines that apply by colour.
- Open the BoM Overview of each colour and check that the kit changes with the colour.
- Send the bill of materials for approval.
Self-check. It is right when: (a) the BoM Overview of each colour has exactly one kit, of the right colour; (b) the frame assembly shows at the second level when you click Unfold; (c) the powder coating line has a third column equal to the standard quantity multiplied by 1.08; (d) the approval request has a number like [APVL...] and the status Draft; (e) the total duration of the two bills of materials is 30 and 40 minutes.
If it does not come out like this. The kit does not change with the colour: check the Apply on Variants column of the three kit lines. The overview has no second level: check whether the frame assembly already has a bill of materials of its own. A quantity that comes out wrong (for example 8 instead of 0.8): check that you typed the decimal point.