Viindoo demo handbook for manufacturing and assembly
Part III. Production planning
Lessons in this part
- Lesson 15. Current production planning configuration
- Lesson 16. A sales order generates a make-to-order manufacturing order
- Lesson 17. Reordering rules (make to stock)
- Lesson 18. Master production schedule from a forecast
- Lesson 19. Reviewing the quantity, date and responsible person of an order
- Lesson 20. Production planning reports
- Lesson 21. Practice exercise: from forecast to manufacturing order
This part answers these questions: what to make, how much, when, and for which order or as stock. The workshop has four sources of manufacturing orders: a sales order (make to order), a reordering rule (make to stock), the master production schedule (make from a forecast) and manual creation. The readers are the production planner, the sales team (who want to know whether a customer order creates a manufacturing order) and the storekeeper (who wants to know where the components come from).
The lessons reuse the vehicle model Zeta Electric Vehicle and the frame assembly Zeta Frame Assembly created in the part Manufacturing engineering; if you have not done so, do the lesson Two-level bill of materials: one BoM for several colours first.
Lesson 15. Current production planning configuration
About 15 minutes. By the end of this lesson your company knows where the workshop takes components and puts finished products, which supply routes exist, which route a new product carries, and by which period the master production schedule plans. This lesson is read-only; nothing is created.
Step 1 - See the list of warehouses
Go to Inventory > Configuration > Warehouse Management > Warehouses.
Inventory > Configuration > Warehouse Management > Warehouses
What you should see: five warehouses with the columns Warehouse, Location Stock, Address and Company: Nhà máy Yên Mỹ (Yen My factory; short name NM1), Kho Tổng (Main warehouse), Nhà máy Khoái Châu (Khoai Chau factory), Kho HCM (Ho Chi Minh City warehouse) and Kho Đà Nẵng (Da Nang warehouse). The orders in this handbook are made at Nhà máy Yên Mỹ.
Step 2 - Open the warehouse Nhà máy Yên Mỹ
Click the line Nhà máy Yên Mỹ.
Inventory > Configuration > Warehouse Management > Warehouses > Nhà máy Yên Mỹ
What you should see: on the tab Warehouse Configuration (with the smart button Routes at the top), the Shipments section has Incoming Shipments set to Receive then Store (2 steps), Outgoing Shipments set to Deliver (1 step) and Enable Foreign Import/Export ticked. The Resupply section has Resupply Subcontractors and Manufacture to Resupply ticked, Manufacture set to Pick components then manufacture (2 steps), Buy to Resupply not ticked and Resupply From Kho Tổng ticked. Two manufacturing steps mean that the components go from stock to the Trước sản xuất (pre-production) area before they go into the order, and the finished product goes into Tồn kho (stock); changing to Manufacture (1 step) is just choosing another option again, not a further development.
Step 3 - See the supply routes
Go to Inventory > Configuration > Warehouse Management > Routes.
Inventory > Configuration > Warehouse Management > Routes
What you should see: 31 routes: the shared routes Replenish on Order (MTO), Buy, Buy - Foreign Import and Manufacture, and the routes that belong to each warehouse, such as Nhà máy Yên Mỹ: Receive in 2 steps (input + stock), Nhà máy Yên Mỹ: Deliver in 1 step (ship), Nhà máy Yên Mỹ: Pick Components and Manufacture and Nhà máy Yên Mỹ: Resupply Subcontractor.
Step 4 - See the default route of a new product
Go to Manufacturing > Products > Products, click New, type any name and click the Inventory tab (no need to save).
Manufacturing > Products > Products > New > Inventory tab
What you should see: the Buy box is already ticked in Routes (circled), and the other routes (Replenish on Order (MTO), Manufacture and so on) are empty. A product that you make yourself must have Buy removed and Manufacture ticked (see the lesson Two-level bill of materials: one BoM for several colours).
Step 5 - See the period of the master production schedule
Go back to Manufacturing > Configuration > Settings and look at the group Planning.
Manufacturing > Configuration > Settings
What you should see: Master Production Schedule has Time Range Weekly (the other options are Monthly and Daily) and Number of Period Columns 12; Security Lead Time is not ticked.
The table below is what your company needs to remember when assigning routes:
| Route or setting | Consequence |
|---|---|
| Manufacture | The product is made by a manufacturing order from a bill of materials |
| Replenish on Order (MTO) together with Manufacture | When there is a specific demand (a sales order, or a parent order that needs a semi-finished product) the system creates an order of its own for that demand |
| Buy | The product is bought; a newly created product always has it ticked |
| Reordering rule (Min, Max) | When the forecast stock falls below the minimum, the system orders enough to reach the maximum (make to stock) |
| Manufacture to Resupply (on the warehouse) | Allows this warehouse to be resupplied by manufacturing |
| 2-step manufacturing on the warehouse | Components move to the Trước sản xuất (pre-production) area before they go into the order; with 1 step they are taken straight from the warehouse |
| Security Lead Time | Schedules manufacturing orders earlier to avoid delays; when it is off, an order follows the time of the bill of materials exactly |
Lesson 16. A sales order generates a make-to-order manufacturing order
About 30 minutes. By the end of this lesson your company confirms a sales order for a vehicle and sees the system automatically create the vehicle manufacturing order and the child order for the frame assembly, with the source clearly showing which sales order caused it. The sales team does not have to call the workshop, and the workshop does not have to read the order again.
Step 1 - Open the vehicle product and see its current routes
Go to Manufacturing > Products > Products, open Zeta Electric Vehicle and click the Inventory tab.
Manufacturing > Products > Products > Zeta Electric Vehicle > Inventory tab
What you should see: Manufacture is ticked, Buy and Replenish on Order (MTO) are not.
Step 2 - Tick the Replenish on Order route
Tick Replenish on Order (MTO) and click Save manually. This route is the link between the sales order and the manufacturing order: with it, every sales order line creates a demand and the Manufacture route turns that demand into an order.
Manufacturing > Products > Products > Zeta Electric Vehicle > Inventory tab
What you should see: both Replenish on Order (MTO) and Manufacture are ticked.
Step 3 - Open the list of quotations
Go to Sales > Orders > Quotations and click New.
Sales > Orders > Quotations
What you should see: the list of quotations and sales orders with the columns Number, Creation Date, Customer, Salesperson, Activities, Company, Total and Status; clicking New opens an empty quotation.
Step 4 - Choose the customer and add the vehicle
In Customer choose Đại lý Xe điện Biên Hòa (the pricelist changes by itself to Dealer Pricelist (16% discount)). In the Order Lines tab click Add a product, type Zeta, choose Zeta Electric Vehicle. The dialog Configure your product shows two colour dots: click the red dot (Burgundy), type quantity 2, click Confirm.
Sales > Orders > Quotations > New
What you should see: the dialog has the name Zeta Electric Vehicle (Burgundy) or (Matte black) depending on the dot selected (the red dot is selected in the picture), the quantity box 2, a Price of 21,000,000 VND per vehicle and a Total of 42,000,000 VND. A yellow banner on the quotation may say that the customer has reached its credit limit; it is information only.
Step 5 - Read the order line
After you click Confirm in the dialog, the system puts the vehicle into the order line.
Sales > Orders > Quotations > New > Order Lines tab
What you should see: the line Zeta Electric Vehicle (Burgundy), quantity 2.00, unit price 25,000,000.00, tax 10%; Pricelist is Dealer Pricelist (16% discount) (VND) and Payment Terms is 30 Days. Below the lines, Untaxed Amount is 42,000,000 VND (after the 16% dealer discount), VAT 10% is 4,200,000 VND and Total is 46,200,000 VND; once the quotation is saved, Amount Before Discount shows 50,000,000 VND. These are illustrative (assumed) figures.
Step 6 - Save the quotation and click Confirm
Click Save manually, then click Confirm at the top left.
Sales > Orders > Quotations > S0...
What you should see: the quotation has a number like S0... (S04395 in the picture), the status is Quotation, the buttons Send by Email, Confirm, Preview and Cancel are at the top, and the Confirm button is circled.
Step 7 - Confirm the date
The dialog Sales Order Confirmation asks for the Confirmation Date (by default the current time, used to record a back-dated confirmation when needed). Click Validate.
Sales > Orders > Quotations > S0... > Confirm
What you should see: the dialog with the Confirmation Date box and the two buttons Validate and Cancel.
Step 8 - Read the confirmed sales order
Sales > Orders > Quotations > S0...
What you should see: the status changes to Sales Order and the chatter records Quotation confirmed. The top of the form has the smart buttons Delivery 1 and Manufacturing 2 (one order that makes the vehicle and one that makes the frame assembly), and a Create Invoice button. The Order Lines tab has the extra columns Delivered and Invoiced.
Step 9 - Open the list of orders of the sales order
Click the smart button Manufacturing.
Sales > Orders > Quotations > S0... > Manufacturing
What you should see: the list Manufacturing Orders Generated by S04395 with two lines: Zeta Electric Vehicle (Burgundy) quantity 2 whose Source is the sales order number S04395 and whose Component Status is Not Available, and Zeta Frame Assembly quantity 2 whose Source is the number of the vehicle order and whose Component Status is Available. Both are in the state Confirmed.
Step 10 - Open the vehicle order
Click the line Zeta Electric Vehicle (Burgundy), then the Miscellaneous tab.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... > Miscellaneous tab
What you should see: Source is the sales order number; Operation Type is Nhà máy Yên Mỹ: Manufacturing; Components Location is NM1/Trước sản xuất (pre-production area) and Finished Products Location is NM1/Tồn kho (stock area); Bill of Material shows the bill of materials used (ZETA-V2 if your company has done the lesson Engineering change orders (PLM)). The system fills in the components from the bill of materials by itself.
Step 11 - Open the child order of the frame assembly
Go back to the list of orders and click the line Zeta Frame Assembly.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... (Zeta Frame Assembly)
What you should see: the button Source MO at the top of the form; the three components of the frame assembly with quantities multiplied by the order (frame 2.00, A-leg 2.00 and powder coating 1.68, which is 2 multiplied by 0.84 because the 5% loss is already included). That is the meaning of several levels: the customer's sales order pulls in the vehicle order, and the vehicle order pulls in the frame assembly order.
Lesson 17. Reordering rules (make to stock)
About 25 minutes. By the end of this lesson your company can set a minimum - maximum stock level for a vehicle model and let the system create replenishment orders when the forecast stock is low. Unlike make to order, these orders are not tied to any customer.
Step 1 - Open the Replenishment screen
Go to Inventory > Operations > Procurement > Replenishment and look at the list.
Inventory > Operations > Procurement > Replenishment
What you should see: the list of rules, with the default filter Not Snoozed and the columns Product, Location, On Hand, Forecast, Route, Min, Max, To Order and UoM, and three buttons at the end of each line: Order, Automate, Snooze. Next to the Max column there is the Setup button. The New button at the top left adds a rule.
Step 2 - Declare a rule for a vehicle
Click New. In the new line: Product choose [XMD-AURA-DN-TC] Viindoo Aura Electric Motorbike (Matte black, Standard) (any vehicle that has no rule yet works the same way), Route choose Manufacture, Min 2, Max 6 (illustrative, assumed figures). Click outside to save the line. A product can have only one rule for the same location: if the product already has a rule, change the Min and Max of that rule instead of adding a second one.
Inventory > Operations > Procurement > Replenishment > New
What you should see: the new line has Route Manufacture, Min 2 and Max 6, and the Save and Discard buttons appear at the top.
Step 3 - Filter and read the quantity to order
Type the product code (for example XMD-AURA-DN-TC) in the search box and press Enter.
Inventory > Operations > Procurement > Replenishment
What you should see: one line for the product, with On Hand, Forecast, Min, Max and To Order. The rule is: when the forecast drops below the minimum, To Order equals Max minus Forecast (for the new Aura rule with no stock, 6.00 minus 0.00 gives 6.00 to order, and the buttons Order, Automate and Snooze appear). When the forecast is above the minimum, nothing is ordered: To Order is 0.00 and only Snooze is offered, as in the picture (another vehicle with forecast 21.00, Min 16.00, Max 18.00).
Step 4 - Click Order
Click the Order button at the end of the line.
Inventory > Operations > Procurement > Replenishment
What you should see: Forecast goes up by the quantity just ordered (6.00), To Order goes back to 0.00 and the Order button disappears; Min 2.00 and Max 6.00 are unchanged. The Automate button changes the rule to run by itself whenever the forecast falls below the minimum; the Snooze button pauses the rule.
Step 5 - Open the order just created
Go to Manufacturing > Operations > Manufacturing Orders and find the order whose Source is the rule number (like OP/...).
Manufacturing > Operations > Manufacturing Orders > NM1/MO/...
What you should see: the order that makes the vehicle with a quantity equal to the quantity ordered (6.00 for the Aura rule, order NM1/MO/01292; the picture shows another vehicle's order of 10.00, NM1/MO/01228), the status Confirmed, the components filled in by themselves, Child MO 2 at the top, and a chatter note This manufacturing order has been created from: OP/00011.
Step 6 - Read the source of the order
Click the Miscellaneous tab.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... > Miscellaneous tab
What you should see: Operation Type is Nhà máy Yên Mỹ: Manufacturing, Source is OP/00011 (the number of the reordering rule), different from the S0... number of a sales order and from the word MPS of the master production schedule.
Lesson 18. Master production schedule from a forecast
About 25 minutes. By the end of this lesson your company enters a weekly demand forecast for a vehicle model and lets the system create orders for the part that is missing.
Step 1 - Open the schedule screen
Go to Manufacturing > Planning > Master Production Schedule.
Manufacturing > Planning > Master Production Schedule
What you should see: two buttons Replenish All and Add a Product (circled); each product in the schedule is a block of weekly columns (Week 48, Week 49, ...) with the lines Starting Inventory, Demand Forecast, Indirect Demand Forecast, To Replenish, Forecast Stock and Available to Promise. The picture shows 10 products. Do not click Replenish All: it runs for every product in the schedule, including products of other people.
Step 2 - Add the vehicle to the schedule
Click Add a Product. Choose Product [XMD-AURA-DN-TC] Viindoo Aura Electric Motorbike (Matte black, Standard); leave Warehouse as Nhà máy Yên Mỹ; set Maximum to Replenish to 50 (it starts at 100) and leave Minimum to Replenish at 0. Click Save. If the vehicle already has a block on the screen, skip this step.
Manufacturing > Planning > Master Production Schedule > Add a Product
What you should see: the dialog has Product, Bill of Materials, Warehouse, Company, Safety Stock Target (0.00 Units), Minimum to Replenish (0.00 Units) and Maximum to Replenish (100.00 Units by default). After saving, the vehicle has a block of its own on the screen.
Step 3 - Enter the demand forecast
Type the product code in the search box and press Enter to see only the block of this vehicle. On the line Demand Forecast, type 8 in the column Week 49 and 10 in the column Week 50 (assumed figures), pressing Tab after each box.
Manufacturing > Planning > Master Production Schedule
What you should see: the Demand Forecast line (circled) has 8.00 and 10.00; the To Replenish line below calculates by itself from those numbers (also 8.00 and 10.00 when there is no stock or order that covers them), and Available to Promise follows.
Step 4 - Click replenish for this vehicle only
Click the green arrow next to the words To Replenish in the block of the vehicle (the Replenish button).
Manufacturing > Planning > Master Production Schedule
What you should see: the green arrow is circled on the To Replenish line of the vehicle block (the screen is filtered on one product, so no other product is replenished).
Step 5 - Read the result
Manufacturing > Planning > Master Production Schedule
What you should see: the box of Week 49 on the To Replenish line turns grey, which means this period has been replenished.
Step 6 - Open the order that was created
Go to Manufacturing > Operations > Manufacturing Orders, find the order whose Source is MPS and open the Miscellaneous tab.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... > Miscellaneous tab
What you should see: Source is MPS; Scheduled Date falls at the start of the planned week (10/26/2026 in the picture); the status is Confirmed; Operation Type is Nhà máy Yên Mỹ: Manufacturing. The quantity of the order is the part that is missing for the period after stock and existing orders are subtracted, not exactly the forecast. For the Aura line above, with no stock and no other order, the new order is for the full 8 vehicles (NM1/MO/01294); the picture shows another vehicle whose forecast was partly covered by earlier orders, so its order is for 1 vehicle. Your company's numbers may differ depending on the orders already made.
Lesson 19. Reviewing the quantity, date and responsible person of an order
About 40 minutes. By the end of this lesson your company can read the source of each order, change the quantity, start date and responsible person of an order, and knows when a new demand is added to an existing order and when the system creates a new order.
The table for recognising the source in the Source column of the order list:
| Source column says | The order comes from |
|---|---|
| A sales order number, like S0... | A sales order (make to order) |
| A rule number, like OP/... | A reordering rule (make to stock) |
| MPS | The master production schedule |
| Another order number, like NM1/MO/... | A child order, created to make a semi-finished product for the parent order |
| Empty | Created by hand |
Step 1 - Increase the quantity on the sales order
Open the sales order S0... (S04395 in the pictures) of the lesson A sales order generates a make-to-order manufacturing order, click the Quantity box of the vehicle line and change 2 to 3.
Sales > Orders > Quotations > S0... > Order Lines tab
What you should see: the quantity box of the vehicle line can be edited, with its content selected.
Step 2 - Save and read the reaction of the system
Click Save manually.
Sales > Orders > Quotations > S0...
What you should see: the quantity is 3.00; the total goes up accordingly (the amount due is 69,300,000 VND including tax in the picture, instead of 46,200,000 VND); after saving, the chatter says the ordered quantity has been updated: 2.0 -> 3.
Step 3 - See the number of orders of the sales order
Look at the smart button Manufacturing.
Sales > Orders > Quotations > S0...
What you should see: the Manufacturing button goes from 2 to 4. The system does not add 1 vehicle to the old order; it creates one more order for 1 vehicle (together with its child order for the frame assembly).
Step 4 - Assign a responsible person
Open the order created from the reordering rule in the previous lesson (the Source column is OP/...). The Responsible box of such an order is empty at first; click it, choose a person and click Save manually.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... (Source OP/...)

What you should see: the Responsible box shows the name of the person just chosen (Phạm Thị Thu Hương in the picture, order NM1/MO/01228); the chatter has a (Responsible) line with that name. An order that has a responsible person is an order that someone has taken over, so new demands will not be added to it (step 5).
Step 5 - Raise the minimum to create a new demand
Go to Inventory > Operations > Procurement > Replenishment, filter on the vehicle, edit Min and Max of its rule to be higher than the current Forecast (in the picture 12 and 14 with Forecast 10.00), then click Order.
Inventory > Operations > Procurement > Replenishment
What you should see: in the picture (the Aura rule with Forecast 10.00, Min 12.00 and Max 14.00) To Order equals Max minus Forecast, that is 4.00. After you click Order, the order that already has a responsible person keeps its quantity, and the system creates a new order for the quantity just ordered (see the list in step 9).
Step 6 - Raise it once more to see demand added up
Repeat step 5 at a still higher level (for example 26 and 28), then click Order. The picture shows the rule line before you raise it: Forecast 21.00, Min 16.00, Max 18.00, To Order 0.00.
Inventory > Operations > Procurement > Replenishment
What you should see: To Order has a number again; this time the new order of step 5 (which has no responsible person) gets extra quantity instead of a third order being created (see the list in step 9: that order has a quantity equal to the sum of the two times). The rule is: a new demand is added to an existing order when that order has the same product, the same bill of materials, is still in the status Draft or Confirmed, is not yet planned and has no responsible person.
Step 7 - Change the quantity of an order
Open the order that was added up in step 6 and click the number of the quantity to produce (next to the word Quantity). In the dialog Change Quantity To Produce type the new number in Quantity To Produce (in the picture it is 9) and click Set Quantity (the other button is Discard).
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... > Quantity

What you should see: the dialog says Modifying the quantity to produce will also modify the quantities of components to consume for this manufacturing order. After you set it, the quantity changes (in the picture NM1/MO/01285 goes from 1 to 9) and every component line is multiplied again (the component lines are 9.00 and the tire 18.00). The child order of the frame assembly may go up too, and the Child MO button changes its number.
Step 8 - Change the start date
On the same order, click the Scheduled Date box, type the new date and time (in the picture it is 11/27/2026 08:00:00), press Enter, then click Save manually.
Manufacturing > Operations > Manufacturing Orders > NM1/MO/... > Scheduled Date

What you should see: Scheduled Date is the new date, Scheduled End moves with it (11/27/2026 08:45:00, the same day, 45 minutes later). The chatter on the right records each change of quantity, 1.00 → 9.00 (Quantity To Produce).
Step 9 - Read the whole list of orders of the Zeta vehicle
Go to Manufacturing > Operations > Manufacturing Orders, remove the default filter, type Zeta Electric Vehicle in the search box and choose Search Product for.
Manufacturing > Operations > Manufacturing Orders
What you should see: one line per order (8 in the picture) with the columns Reference, Start, Product, Next Activity, Source, Component Status, Quantity, UoM, Company, Progress, Alert Count and State: orders whose Source is a sales order (S04373 three times, 1.00 each, and S04381 for 20.00), two orders whose source is OP/00011 (10.00 and 9.00; the order that has a responsible person and the order that was added up), one order whose source is MPS (1.00) and one order with no source (made by hand, Done). The Component Status column says Not Available for the orders that are still Confirmed: that is correct behavior when the frame assembly and components are not enough, and the next job is to receive goods or make the frame assembly (see the parts Purchasing and import and Shop floor production).
Lesson 20. Production planning reports
About 15 minutes. The planning part has the following screens. The table lists all of them; three are walked through below.
| Report | What question it answers | Path |
|---|---|---|
| Manufacturing Overview | How many work orders each station has, what the OEE is, how the week plan looks | Manufacturing > Overview |
| Planning by Production | Which operations each order has and how long they are expected to take | Manufacturing > Planning > Work Orders > Planning by Production |
| Planning by Workcenter | How busy each station is this week, whether work overlaps | Manufacturing > Planning > Work Orders > Planning by Workcenter |
| Master Production Schedule | Which week needs how many vehicles to meet the forecast | Manufacturing > Planning > Master Production Schedule |
| Replenishment | Which item is under its minimum, how much to order | Inventory > Operations > Procurement > Replenishment |
| List of manufacturing orders by source | Which orders are make to order, make to stock or from the forecast | Manufacturing > Operations > Manufacturing Orders (the Source column) |
The reports Manufacturing Orders Progress and Work Orders are in the part Shop floor production.
Step 1 - Open the Manufacturing overview
Go to Manufacturing > Overview.
Manufacturing > Overview
What you should see: the screen Work Centers Overview with one card per station (12 in the picture): the station name, a button WORK ORDERS or PLAN ORDERS, the OEE figure (for example 80% for Tổ khung) and a weekly chart (15 - 21 Nov, This Week, ...). A station with running work also shows To Launch and In Progress counts.
Step 2 - Open Planning by Production
Go to Manufacturing > Planning > Work Orders > Planning by Production.
Manufacturing > Planning > Work Orders > Planning by Production
What you should see: the screen Work Orders Planning as a list grouped by manufacturing order (for example NM1/MO/01228 (2)); expand a group to see its work orders. The columns are Operation, Work Center, Product, Quantity Re..., Expected Duration, Real Duration and Status; the default filter is In Progress or Ready or Waiting or Pending, and the buttons at the top right switch between list, calendar, pivot and graph.
Step 3 - Open Planning by Workcenter
Go to Manufacturing > Planning > Work Orders > Planning by Workcenter.
Manufacturing > Planning > Work Orders > Planning by Workcenter
What you should see: the same screen grouped by Work Center (for example Tổ khung (2) (Frame team), Tổ điện (2) (Electrical team), Tổ lắp ráp trên chuyền (20) (Assembly line team) and Tổ hàn khung Zeta (3) (Zeta frame welding team)), with the expected duration of each group (900:00 for the assembly line team). This is the screen on which to see which station is overloaded.
Lesson 21. Practice exercise: from forecast to manufacturing order
About 45 minutes. There are no step-by-step pictures.
The task. Your company receives a sales order for 3 Zeta Electric Vehicle (Matte black) from Cửa hàng Xe điện An Phát and wants to keep a minimum stock of 4 Matte black vehicles.
What to do.
- Make a quotation for 3 Matte black vehicles for the customer above and confirm it. Write down the number of the order created and the number of the child order.
- Open the vehicle order, read the Source column and the Bill of Material box.
- Create (or edit) the reordering rule of the Matte black vehicle with minimum 4 and maximum 8; click Order. Write down the order created.
- Enter in the master production schedule a forecast of 5 Matte black vehicles for next week; click replenish for this vehicle only; write down the quantity of the orders.
- Assign a responsible person to the make-to-order order; increase the quantity of the order from the reordering rule by 2.
- Open the list of orders filtered by product and classify each order by the Source column.
Self-check. It is right when: (a) the make-to-order order has the sales order number as Source and a child order Zeta Frame Assembly of the same quantity; (b) the order from the rule has Source OP/... and the chatter note This manufacturing order has been created from: OP/...; (c) the order from the master production schedule has Source MPS; (d) after a responsible person is assigned to an order, the next replenishment does not add to that order; (e) the total of the Matte black orders without a responsible person and with the source OP/... is only one order if your company replenishes twice in a row.
If it does not come out like this. Confirming the order does not create an order: check that the vehicle has both Manufacture and Replenish on Order (MTO) routes, and that the vehicle has a bill of materials. The rule gives no quantity to order: check whether Forecast is higher than Min (then nothing is ordered). The order from the master production schedule is smaller than the forecast: it is the part missing after the existing orders are subtracted.