Viindoo demo handbook for manufacturing and assembly

Part V. Warehouse and quality

This part answers these questions: which warehouses and steps do goods pass through, can defective goods get into stock, which vendor's defects keep repeating, are components for the line taken by loose spare-part sales, and how are materials issued to the workshop? It is written for storekeepers, quality inspectors, team leaders and production planners.

Lesson 31. Warehouse and quality control configuration in use

About 15 minutes. By the end of this lesson your company knows the number of receipt and delivery steps of each warehouse, the types of transfers, the supply routes, and which goods are inspected on arrival.

Step 1 - Look at the list of warehouses

PathInventory > Configuration > Warehouse Management > Warehouses
Five warehouses: Nhà máy Yên Mỹ, Kho Tổng, Nhà máy Khoái Châu, Kho HCM, Kho Đà Nẵng

What you should see: five warehouses, Nhà máy Yên Mỹ (Yen My Factory), Kho Tổng (Central Warehouse), Nhà máy Khoái Châu (Khoai Chau Factory), Kho HCM (Ho Chi Minh Warehouse) and Kho Đà Nẵng (Da Nang Warehouse), each with a Location Stock such as NM1/Tồn kho (NM1/Stock), KT/Tồn kho, NM2/Tồn kho, HCM/Tồn kho and DNG/Tồn kho.

Step 2 - Read the receipt, delivery and manufacturing steps of Nhà máy Yên Mỹ

Open the warehouse Nhà máy Yên Mỹ.

PathInventory > Configuration > Warehouse Management > Warehouses
Nhà máy Yên Mỹ: 2-step receipt, 1-step delivery, 2-step manufacturing

What you should see: Incoming Shipments is set to Receive then Store (2 steps); Outgoing Shipments is set to Deliver (1 step); Manufacture is set to Pick components then manufacture (2 steps); Enable Foreign Import/Export is ticked; Resupply From is Kho Tổng; and Resupply Subcontractors and Manufacture to Resupply are ticked. The other four warehouses receive goods in 1 step.

Step 3 - Read the transfer types and prefixes

PathInventory > Configuration > Warehouse Management > Operations Types
List of operation types of the warehouses

What you should see: each warehouse has its own transfer types. The prefix shown on the transfer code is: IN receipt, STOR storage (the second step of Nhà máy Yên Mỹ), OUT delivery, PC pick components (step one of manufacturing), MO manufacturing order, IMP import customs clearance area, IMP-IN import receipt into the warehouse.

Step 4 - Read the units of measure

PathInventory > Configuration > Units of Measures > UoM Categories
UoM categories: Unit, Weight, Working Time, Set, Pair...

What you should see: each category holds units that convert into one another. Set and Pair are two separate categories; you cannot convert between Set and Unit. That is exactly why the system refuses when import costs are split "by quantity" across lines of different categories.

Step 5 - Read the supply routes by product group

The number of product codes on each route (at the time of writing; it changes when new codes are added):

Route Which product group it is attached to What happens when stock runs short
Manufacture Finished vehicles (13 codes), semi-finished frame and electrical assemblies (6 codes), electrical cabinet shell (1 code) A manufacturing order is generated when the goods are needed
Buy Components and supplies, loose spare parts and other groups (more than 350 codes) It does not buy by itself. There has to be a reordering rule (there is 1 at present), or a plan that creates a supply request, or a purchasing clerk who creates the order by hand
Replenish on Order (MTO) 3 codes Every sales order generates its own supply demand at once
Supply from another warehouse Attached at warehouse level: Nhà máy Yên Mỹ takes from Kho Tổng, Kho HCM takes from Nhà máy Yên Mỹ A supply request generates stock transfers

Step 6 - Read the incoming quality control points

PathQuality > Quality Control > Quality Controls > Control Points
List of quality control points, filtered on IQC

What you should see: the points whose Reference starts with IQC (incoming inspection), with their Title, Products, Operations, Type and Team: appearance of the plastic kit, voltage of batteries and accumulators, frame welds, motor test run, brakes. Open one point:

Control point IQC-02: applies to lithium batteries and accumulators, No Proceed if Failed is on

What you should see: the Title Voltage and Capacity of Battery and Accumulator, the Products the point applies to (batteries and accumulators; a point can also be limited by Product Categories or Product Templates), Operations covering the ordinary receipt (Receipts) and the import receipt, Type Pass - Fail, To Check (%) 100, and the No Proceed if Failed box ticked. This box is the switch that blocks receiving into stock.

What you lose without it

PathQuality > Quality Control > Quality Controls > Control Points
Configuration What you lose without it
2-step receipt at Nhà máy Yên Mỹ Goods are received straight into the stock location, with no Input stage to wait for inspection and put-away
2-step manufacturing (Pick Components) The workshop has no separate material pick and cannot reserve goods for each order
IQC control points Defective goods enter stock and nobody inspects them
The No Proceed if Failed box A failed check still does not stop the receipt
Resupply from another warehouse A supply request does not generate transfers between warehouses by itself

Lesson 32. Domestic receipt with incoming inspection

About 20 minutes. By the end of this lesson your company receives a domestic batch, passes an incoming inspection and puts the goods into stock through two steps.

Step 1 - Create the domestic purchase order

Create a Request for Quotation, vendor Nhựa kỹ thuật Xuân Hòa, vendor reference MK-IV-04, one line OPS-LUMI-TR (Painted Plastic Body Kit Lumi - Pearl White) quantity 12, unit price 1,850,000. Save and confirm.

PathPurchase > Orders > Requests for Quotation
Domestic purchase order, 12 plastic kits, 24,420,000 VND including tax

What you should see: the Foreign Import box is not ticked; Deliver To is Nhà máy Yên Mỹ: Receipts; the total is 24,420,000 VND (22,200,000 VND untaxed plus 2,220,000 VND of 10% VAT).

Step 2 - Open the receipt

On the purchase order click Receipt.

PathPurchase > Orders > Requests for Quotation
Receipt NM1/IN, with the Quality Checks button

What you should see: a transfer NM1/IN/xxxxx, with a prominent purple Quality Checks button in the button bar (and a Quality Checks smart button), because the system has already generated the inspection checks for the received products; Destination Location is NM1/Đầu vào (NM1/Input).

Step 3 - Do the check

Click Quality Checks. Read the inspection instructions in the dialog, then click Pass.

PathPurchase > Orders > Requests for Quotation
Quality check dialog with the Pass, Fail and Discard buttons

What you should see: a dialog titled with the name of the check and the product (for example Motor and Controller Test Run: Hub Motor 72V 1500W 12-inch Rim), the inspection instructions in a blue box, Checked (%) 100 (To Check: 100.00%), and the buttons Pass (green), Fail (red) and Discard.

After a passed check, the check button turns green

What you should see: the check button at the top of the receipt turns green with a tick, which means the check has passed.

Step 4 - Confirm the receipt into stock

Click Validate; in the Validate with a Back Date dialog click Validate.

PathPurchase > Orders > Requests for Quotation
Dialog for choosing the effective date

What you should see: the dialog Validate with a Back Date, with the Transfer Date field holding the current date and time (backdating is allowed) and the buttons Validate and Cancel.

Receipt done, with the Next Transfer button

What you should see: the status is Done; the Next Transfer button appears because the goods are only at the Input location so far.

Step 5 - Store the goods

Click Next Transfer, open the transfer NM1/STOR/xxxxx, click Validate and Validate in the date dialog.

PathPurchase > Orders > Requests for Quotation
Storage transfer moving goods from Input to Stock

What you should see: the storage transfer moves goods from NM1/Đầu vào (NM1/Input) to NM1/Tồn kho (NM1/Stock).

Storage transfer done

What you should see: the status is Done, and the goods are in stock and ready to use.

Lesson 33. A failed incoming inspection blocks the receipt

About 20 minutes. By the end of this lesson your company has verified for itself that a failed check blocks receiving into stock, and understands the two different kinds of block.

Step 1 - Try to receive before inspection

On the import receipt for lithium batteries (the purchase order created in the lesson Import purchase order in a foreign currency), click Validate and then Validate in the date dialog.

PathNM1/IMP/xxxxx
The system blocks: complete the quality checks first

What you should see: the Invalid Operation dialog: "Complete the quality checks QC24522, QC24523 first." This is the first block: there are checks not yet done.

Step 2 - Do a check and click Fail

Click Quality Checks. For the first check (battery voltage and capacity), click Fail.

PathNM1/IMP/xxxxx
Check of voltage, capacity of batteries and accumulators (1/2)

What you should see: a dialog titled Voltage and Capacity of Battery and Accumulator: Lithium Battery 60V-30Ah with a "1 / 2" counter, the inspection instructions, and the buttons Pass, Fail, Next and Discard; after you click Fail the dialog moves to check 2.

Step 3 - Complete the remaining check

The second check measures open-circuit voltage: enter 67.5 in Measure (reference level 67.20), click Validate.

PathNM1/IMP/xxxxx
Voltage measurement check (2/2): the system reminds you of the allowed range

What you should see: the dialog Battery Open-Circuit Voltage Measurement (V): Lithium Battery 60V-30Ah shows a yellow notice with the allowed range ("... it should be between 66.40 and 68.00 V.") and the norm 67.20 beside Measure; the value 67.5 is inside the range, so check 2 passes.

The check button on the receipt turns red

What you should see: the Quality Checks smart button of the receipt turns red because one check has failed.

Step 4 - Try to receive again

Click Validate and Validate in the date dialog.

PathNM1/IMP/xxxxx
The system blocks: a failed check is blocking this step

What you should see: "Failed quality checks Voltage and Capacity of Battery and Accumulator on NM1/IMP/xxxxx block this step; ask your Quality team to re-inspect them or deal with the defective goods." This is the second block and the conclusion: a failed check does block the receipt when the control point has No Proceed if Failed ticked.

Note from the live run: if the control point does not have this box ticked, a failed check does not block.

Lesson 34. Quality alerts viewed by vendor

About 15 minutes. By the end of this lesson your company records a receipt defect as a quality alert tied to a vendor, and can see which vendor has the most defects.

Step 1 - Create an alert from the receipt

On the receipt that was blocked in the previous lesson, click Quality Alert. In Description write the cause.

Pathon the receipt, Quality Alert button
New quality alert: check, product and quality team filled in automatically

What you should see: the alert fills in Check, Team (Main Quality Team), Responsible, Product and Product Variant by itself; the stage is Newly Recorded, and the tabs are Description, Corrective Actions, Preventive Actions and Miscellaneous.

Step 2 - Attach the vendor

Click save, open the Miscellaneous tab, choose Vendor Zhejiang Lianfeng, click save.

Pathon the alert, Miscellaneous tab
Miscellaneous tab of the alert, Vendor field

What you should see: the Vendor field has a name. The alert does not take the vendor from the receipt by itself, so this step is done by hand, otherwise the report cannot group by vendor.

Step 3 - Look at alerts by vendor

Open Quality Alerts as a list, open the search bar, under Group By choose Add Custom Group and then choose Vendor.

PathQuality > Reporting > Quality Alerts
Quality alerts grouped by vendor, with the number of alerts

What you should see: one group per vendor with the number of alerts in brackets (for example Công ty TNHH Nhựa kỹ thuật Xuân Hòa (24) and Zhejiang Lianfeng Battery Technology Co., Ltd (14)); the group None (76) holds alerts not yet tied to a vendor. A vendor with a large number is a vendor with repeated defects.

Lesson 35. Lots and serial numbers

About 15 minutes. By the end of this lesson your company enters a lot number for lot-tracked goods and can look that lot up in stock.

Step 1 - Look at a lot-tracked product

Open the product Lithium Battery 60V-30Ah, General Information tab.

PathPurchase > Products > Products
Lithium battery product: Track Inventory, By Lots

What you should see: the Track Inventory box is ticked, with By Lots selected. Finished vehicles are tracked by serial number (one frame number per vehicle).

Step 2 - Receive without a lot number

PathPurchase > Products > Products

Create an import purchase order for PIN-LI-60V30 quantity 2 (vendor reference MK-IV-03), pass the two checks, and click Validate on the receipt.

PathPurchase > Products > Products
The system asks for a lot/serial number

What you should see: the Invalid Operation dialog: "You need to supply a Lot/Serial Number for product: - [PIN-LI-60V30] Lithium Battery 60V-30Ah".

Step 3 - Enter the lot number

PathPurchase > Products > Products

On the product line click the list icon at the end of the line. In the dialog type MK-LOT-LI-0001 in Lot/Serial Number, press Tab, click Save.

PathPurchase > Products > Products
Entering lot MK-LOT-LI-0001 for 2 units

What you should see: the dialog Open: Stock move shows the line with Lot/Serial Number MK-LOT-LI-0001, Quantity 2.00, and Store To the customs clearance area.

Step 4 - Validate the receipt and look up the lot

Click Validate on the receipt. Then open the list of lot numbers.

PathInventory > Products > Lots / Serial Numbers
Lot numbers grouped by location, the new lot is in the customs clearance area

What you should see: the receipt is done; in the list of lot numbers (search Lot/Serial Number for MK-LOT, grouped by Location), the location NM1/Nhập khẩu - khu vực thông quan (NM1/Import - customs clearance area) holds 1 lot, the lot you just received.

Lesson 36. Receiving imports in stages

About 10 minutes. By the end of this lesson your company knows why the receipt of imported goods into the warehouse is blocked before customs clearance.

Step 1 - Try to receive into the warehouse before customs confirmation

For an import batch whose customs clearance request is not yet confirmed (for example the front disc rim batch of the lesson Import costs in inventory cost), open the transfer NM1/IMP-IN/xxxxx (the Next Transfer button on the IMP transfer), click Validate.

PathNM1/IMP/xxxxx
The system blocks receiving into the warehouse because the customs clearance request is not confirmed by customs

What you should see: "You cannot process the transfer NM1/IMP-IN/00197 while its original transfer NM1/IMP/00203 's customs declaration document CD/IMP/00198 has not been confirmed by the customs authority. Please get it confirmed first!" Your company has to go through the whole lesson Import costs in inventory cost (steps 4 to 7) before the goods can be received into the warehouse.

Lesson 37. Reserving components for the line when spare parts share the warehouse

About 15 minutes. By the end of this lesson your company can tell goods on hand from goods available for use, and sees how a manufacturing order reserves components so that loose spare-part sales cannot take them.

Step 1 - Read the stock of one component

Open the Stock report and search DC-HUB.

PathInventory > Reporting > Stock
Stock of the hub motor: Free to Use is well below On Hand

What you should see: the On Hand column (all real stock, 152 here) is larger than the Free to Use column (82): the difference is goods already reserved by other orders (the Incoming and Outgoing columns show the quantities still to come in and go out). Loose spare parts and line components share one warehouse, so look at Free to Use, not On Hand.

Step 2 - See how the manufacturing order reserves components

Open again the Aura manufacturing order from the lesson Check material availability and buy the shortfall for a manufacturing order, Components tab, after the component pick has been completed (the next lesson).

PathManufacturing > Operations > Manufacturing Orders
Manufacturing order: the green Quantity column is what has been reserved for the order

What you should see: the green Quantity column is what has been reserved and moved to NM1/Trước sản xuất (NM1/Pre-production); components that could not be reserved still show 0.00. Goods that already sit in Pre-production can no longer be taken by loose spare parts or other orders.

Lesson 38. Issuing materials to the workshop: the warehouse's part

About 15 minutes. By the end of this lesson your company issues materials for a manufacturing order to the area in front of the line, even when some components are short.

Step 1 - Open the component pick of the order

Open the Aura manufacturing order, click Transfers, open the transfer NM1/PC/xxxxx.

Pathon the manufacturing order, Transfers button
Component pick: from NM1/Stock to NM1/Pre-production

What you should see: Operation Type Nhà máy Yên Mỹ: Pick Components, Source Location NM1/Tồn kho (NM1/Stock), Destination Location NM1/Trước sản xuất (NM1/Pre-production), Source Document is the manufacturing order, and the list of components with quantities. If some line is not fully reserved, the Check Availability button appears so you can reserve again.

Step 2 - Validate the transfer

Click Validate, then Validate in the date dialog.

Pathon the component pick, Validate button
Dialog asking whether to create a backorder

What you should see: if some component is not complete, the Create Backorder? dialog appears with the message "You have processed less products than the initial demand." and three buttons, Create Backorder, NO BACKORDER and Discard.

Step 3 - Create the backorder

Click Create Backorder.

Paththe Create Backorder? dialog
Component pick done

What you should see: the transfer is Done; the missing components sit in a new PC transfer (the backorder, here NM1/PC/01497), waiting for goods. The workshop can start with what is available.

Lesson 39. Warehouse reports

About 10 minutes. The table below lists the warehouse and quality reports.

Report Path Question it answers
Overview Inventory > Overview How many transfers each warehouse has to process, late, waiting
Stock Inventory > Reporting > Stock On hand and available quantity of each product, by warehouse
Valuation Inventory > Reporting > Valuation Stock value and each cost layer
Stock Age Report Inventory > Reporting > Stock Age Report How long goods have sat in the warehouse
Moves History Inventory > Reporting > Moves History Every receipt, issue and transfer of goods
Moves Analysis Inventory > Reporting > Moves Analysis Moves by period and by operation type
Warehouse Analysis Inventory > Reporting > Warehouse Analysis Stock by many dimensions
Locations Inventory > Reporting > Locations Which location the goods are in
Landed Costs Analysis Inventory > Reporting > Landed Costs Analysis Cost added to inventory cost, by product
Product Journal (S10-DN) Inventory > Vietnam Legal Reports Detailed ledger in the statutory format
General Inventory Journal (S11-DN) Inventory > Vietnam Legal Reports Receipts, issues and stock in the period
Stock Card (S12-DN) Inventory > Vietnam Legal Reports Stock card of each item
Stock-In Report and Stock-Out Report Inventory > Vietnam Legal Reports List of receipts and deliveries in the period
Quality Checks Quality > Reporting > Quality Checks Pass and fail rate over time
Quality Alerts Quality > Reporting > Quality Alerts Defects by vendor, product and cause
Alert Actions Analysis Quality > Reporting > Alert Actions Analysis Corrective and preventive actions still pending
PathInventory > Overview
Inventory overview: one column of operation cards for each warehouse

What you should see: one card per transfer type and warehouse, with buttons such as To Receive, To Process, To Deliver and To Manufacture and figures such as Waiting, Late, Back Orders, In Progress and Operations showing the backlog; click a card to open the list of transfers.

Stock move history

What you should see: every line is one move, with the product, from where to where, and the quantity.

Lesson 40. Exercise: take one component from purchase order to workshop

About 45 minutes. There are no step-by-step images.

  1. Create a purchase order for OPS-LUMI-DN (Painted Plastic Body Kit Lumi - Matte Black) quantity 6 from Nhựa kỹ thuật Xuân Hòa, and confirm it.
  2. Receive the goods: do the appearance check, try clicking Fail, then try to validate the receipt to see the block. (A check that has failed cannot be changed back; do this step on a separate trial order, and use another order for the batch that passes.)
  3. For the batch that passes: validate the IN transfer, then the STOR transfer.
  4. Create a quality alert for the failed batch, attach the vendor, and check that the vendor appears in the grouping by Vendor.
  5. Create a manufacturing order for one Lumi vehicle, confirm it, open Overview, find the matte black kit line, and read Free to use / On Hand and Reserved.
  6. Validate the PC transfer of the order. Answer for yourself: after this step, at which location is the plastic kit you just received?

Zalo