Viindoo demo handbook for manufacturing and assembly
One vehicle through the whole chain
Lesson 1. One vehicle through the whole chain: from the dealer's order to chassis number lookup
About 45 minutes. By the end of this lesson your company has gone through a complete cycle of an assembly business on documents it created itself: take a dealer's order for one vehicle at the correct dealer price, see which components are short and buy them from an overseas vendor in a foreign currency, put import tax, freight and fees into the cost, inspect the goods before they enter stock, assemble the vehicle on the shop floor screen, attach the chassis and engine numbers, read the cost of the vehicle, deliver it to the dealer, invoice it, and look the chassis number up to see the full history of the vehicle.
The lesson goes through five stages. Each stage is expanded into a part of its own later in the handbook; this lesson follows the main road only.
| Stage | What happens | Steps | Time |
|---|---|---|---|
| 1 | Quote the dealer on the dealer pricelist, confirm the order for one vehicle | 1 - 3 | 5 minutes |
| 2 | Components that are short against the bill of materials, bought from an overseas vendor in a foreign currency | 4 - 6 | 6 minutes |
| 3 | Receive the components: quality check first, then receipt into stock, import tax, freight and fees added to the cost | 7 - 16 | 14 minutes |
| 4 | Assemble on the shop floor screen, attach the chassis number, check chassis and engine numbers, close the order | 17 - 25 | 11 minutes |
| 5 | Vehicle cost, delivery to the dealer, invoice, chassis number lookup | 26 - 33 | 8 minutes |
Every step runs in the company "Công ty Cổ phần SX Viindoo", warehouse "Nhà máy Yên Mỹ" (Yen My Factory). When you open a path, check that the top right corner shows this company.
The document numbers in this lesson (S04396, NM1/MO/01282, P01269...) come from the trial run made while writing the handbook. When your company follows the lesson, the system issues new numbers. The amounts of the sales order and the purchase order will be the same if you choose exactly as the lesson says; the converted foreign-currency amounts follow the exchange rate of the day your company does it, and the average cost and labour hours follow the minutes actually clocked, so they will differ a little.
Step 1 - Create a quotation for the dealer and choose the vehicle model
Open the list of quotations and click New. In the Customer box type and choose Đại lý Xe điện Hải Dương. Click Add a product, type Aura, and choose Viindoo Aura Electric Motorbike. In the Configure your product dialog, choose the colour Moss green (the third round swatch) and the version Premium, then click Confirm.
Sales > Orders > Quotations
What you should see: as soon as you choose the customer, the Pricelist box changes by itself to Dealer Pricelist (16% discount) (VND) and Payment Terms to 30 Days - the salesperson does not have to remember which dealer gets which price. In the configuration dialog the vehicle code changes to [XMD-AURA-XR-CC] Viindoo Aura Electric Motorbike (Moss green, Premium), the Premium version adds 4,000,000 VND, and the price shows 30,240,000 VND.
One vehicle line, many colours, one bill of materials. The Aura comes in four colours and two versions, which is eight vehicle codes, but there is only one bill of materials. The bill picks the right painted plastic body kit for the colour and the right motor, controller and battery for the version.
Step 2 - Make the vehicle line to order and save the quotation
The order lines table does not show the route column yet. Click the column settings icon at the end of the table header row and tick Route. On the vehicle line, click the Route cell and choose Replenish on Order (MTO). Click Save (the cloud icon next to the quotation number).
Sales > Orders > Quotations
What you should see: the vehicle line has Unit Price 36,000,000.00 (list price 32 million plus 4 million for the Premium version), Disc.% 16.00 and Amount 30,240,000 VND. At the bottom of the quotation: Amount Before Discount 36,000,000 VND, Untaxed Amount 30,240,000 VND, VAT 10% 3,024,000 VND, Total 33,264,000 VND. The quotation gets a new number, for example S04396. If the table is crowded and you cannot see the Disc.% column, switch off the two delivery date columns with the same column settings button.
Why choose the to-order route: the Aura has the Manufacture route. When you add Replenish on Order (MTO) to the line, the system, on confirmation, opens a manufacturing order of its own for this dealer's vehicle at once and links it to the order. Without it, the order takes a vehicle that is already in stock; if no vehicle is in stock, the planner creates the order from the Replenishment screen (see the part Production planning).
Step 3 - Confirm the order
Sales > Orders > QuotationsClick Confirm. The Sales Order Confirmation dialog shows the Confirmation Date box already filled with the current time; click Validate in the dialog.
Sales > Orders > Quotations

What you should see: the status bar moves to Sales Order and the Create Invoice button appears. Two new smart buttons appear at the top: Delivery 1 (the delivery to the dealer) and Manufacturing 1 (the order that assembles this vehicle). The dealer's order has become work for the shop floor without anyone copying anything by hand.
Step 4 - See which components are short
Click the Manufacturing button on the order to open the order just created (for example NM1/MO/01282). The order is Confirmed, has three operations and 19 component lines. The system has also created a Pick Components transfer (the Transfers button on the order) that moves the components from the warehouse to the pre-production area. To see which components are short against all waiting demand, open the Replenishment screen and search for the component you want to check by its code, then press Enter.
Inventory > Operations > Procurement > Replenishment
What you should see: the row of a short component has a negative Forecast (for example -35.00) and To Order greater than 0 (35.00); at the right of the row are the Order, Automate and Snooze buttons. A negative forecast means that, after counting all waiting demand, the warehouse does not have enough of that component. The 72V hub motor of this lesson is the same kind of case: it is a component imported from China, and when it is short its row looks like this one.
The stock figures on this screen change from day to day because other orders on the demo system also take components. If the motor is not short when your company does the lesson, carry on with steps 5 - 16 to see the import flow; the order will take the motor that is in stock. The surest way to know what your own order is still missing is to open the Pick Components transfer of the order: any row whose Quantity column is still 0 is a row for which stock could not be reserved. In the trial run, besides the motor, the Lithium Battery 60V-30Ah was also short (the battery was in stock but sitting in the receiving area waiting to be put away for something else); one battery was bought from Nhà cung cấp linh kiện lẻ (the retail components vendor) in exactly the way of steps 5 - 11 and 15, and then the pick transfer reserved it by itself.
Step 5 - Create the purchase order for the motors from the overseas vendor
Open the list of requests for quotation and click New. Fill in:
| Box | What to enter |
|---|---|
| Vendor | Jiangsu Huanyu Electric Drive Co., Ltd |
| Foreign Import | the system ticks it by itself when you choose an overseas vendor; untick it so that Deliver To changes to Nhà máy Yên Mỹ: Receipts - in this lesson the goods are received straight into the factory warehouse |
| Currency | choose CNY |
| Product line | click Add a product, type DC-HUB-72V, choose the 72V hub motor; Quantity 50 |
| Taxes on the line | click the tax cell and remove the 10% tag |
Click Save.
Purchase > Orders > Requests for Quotation
What you should see: the motor line takes Unit Price 690.00 and the vendor's own product code [HY-HM72-1500-12] from the vendor pricelist by itself; Total ¥ 34,500.00, and the line below converts it to Vietnamese dong (126,960,000 VND in the trial run). Expected Arrival is automatically 40 days ahead, following the delivery lead time declared for this vendor.
Why 50 units: this vendor only accepts orders of 50 units or more. If you order fewer, the system takes the price of a domestic vendor that sells in small quantities. Why remove the 10% tax: an overseas vendor does not issue a Vietnamese VAT invoice; import tax is added to the cost in step 13, and the VAT on imported goods is settled at customs.
Step 6 - Confirm the purchase order
Purchase > Orders > Requests for QuotationClick Confirm Order, then click Validate in the Purchase Order Confirmation dialog.
Purchase > Orders > Requests for Quotation
What you should see: the status changes to Purchase Order, the Confirmation Date box holds the time you just clicked, and a Receipt 1 smart button appears at the top (next to Bill Matching); the button bar now has Receive Products and Create Bill. The motor line shows 50.00 Quantity, Received 0.00, Billed 0.00 and Unit Price 690.00, with Total ¥ 34,500.00 and the amount in dong (126,960,000 VND) below it. The order is confirmed directly, with no approval step. Purchase orders can be put through approval by value; for how to set it up and who approves, see the part Approvals.
Step 7 - Open the receipt and enter the motor lot number
Click the Receipt button on the purchase order. On the motor line, click the list icon at the end of the line. In the Open: Stock move dialog, click the Lot/Serial Number cell of the existing line, type the lot number printed on the package, for example DC72V-261124-901, and click Save.
Purchase > Orders > Requests for Quotation

What you should see: receipt NM1/IN/00589 with Operation Type Nhà máy Yên Mỹ: Receipts, Destination Location NM1/Đầu vào (NM1/Input), status Ready, and the motor line with Demand 50.00 Units. At the top there is a purple Quality Checks button: the system created a check for the motors as soon as the receipt was created. In the lot dialog (columns Lot/Serial Number, Store To, Quantity, Unit of Measure), one line of 50.00 carries the lot number you just typed and Store To NM1/Đầu vào.
Step 8 - Try to receive the goods before the check
Purchase > Orders > Requests for QuotationClick Validate. A dialog asks for the transfer date (the system allows back-dating if you record a document of an earlier day); leave it as it is and click Validate.
Purchase > Orders > Requests for Quotation
What you should see: an Invalid Operation dialog with the line Complete the quality checks QC24528 first. The receipt stays Ready, and no motor has entered stock. Click Close, then click Cancel in the date dialog still waiting behind it. This is what the introduction video says: no check, no receipt into stock.
Step 9 - Do the incoming quality check
Purchase > Orders > Requests for QuotationClick the Quality Checks button on the button bar. Read the check instruction in the blue box, then click Pass.
Purchase > Orders > Requests for Quotation
What you should see: the dialog Motor and Controller Test Run: Hub Motor 72V 1500W 12-inch Rim with the instruction text in the blue box (written in Vietnamese on the demo system: a no-load run on the test bench for 3 minutes, measure the no-load current, listen for abnormal noise), the Checked (%) box at 100.00 with "(To Check: 100.00%)", a Note area and a Take Picture button; the buttons at the bottom are Pass, Fail and Discard. After you click Pass, the Quality Checks button disappears from the button bar. If you click Fail, the goods cannot enter stock, and you can create a quality alert straight from the receipt (see the part Warehouse and quality).
Step 10 - Receive the motors into stock
Purchase > Orders > Requests for QuotationClick Validate, then Validate in the transfer date dialog.
Purchase > Orders > Requests for Quotation
What you should see: the status is Done (shown on the status bar Draft, Ready, Done), and the Effective Date box holds the time you just clicked. At the top appear Traceability, Moves, Next Transfer and Journal Entries 1 (the entry that raises the stock value at the purchase price converted to dong).
Step 11 - Record the bill of the components vendor
This lesson records tax, freight and fees with a landed cost document, supported by two bills: the goods bill from the overseas vendor and the freight and fees bill from the forwarder.
Open the motor purchase order again and click Create Bill. On the draft bill, fill in Bill Date and Bill Reference according to the bill you received, click Save, then click Confirm.
Purchase > Orders > Purchase Orders
What you should see: a Vendor Bill for Jiangsu Huanyu Electric Drive Co., Ltd, the journal records in CNY, the motor line is 50 x 690.00 with Account 151 Goods in transit; after you confirm, it has a number starting with HÓA Đ/ (the code of the Vendor Bills journal; for example HÓA Đ/2026/11/00003) and the status Posted. The receipt of step 10 already posted Debit 152 / Credit 151; the bill posts Debit 151 / Credit 331. When the bill uses the same exchange rate as the day of receipt, account 151 for this shipment returns to zero (in the trial run: 126,960,000 VND on both sides).
Step 12 - Record the freight and fees bill of the forwarder
Open the list of vendor bills and click New. Fill in Vendor Công ty TNHH Giao nhận Vận tải Hải Âu, Bill Reference and Bill Date. Click Add a line twice:
| Product | Price |
|---|---|
| [CP-CUOC-BIEN] International Freight (Sea) | 3,500,000 |
| [CP-HAIQUAN] Port Customs, Handling and Storage Fees | 1,800,000 |
Leave the tax of each line as on the bill you received. Click Save, then Confirm. The figures above are examples.
Accounting > Vendors > Bills
What you should see: a Vendor Bill with both lines taking Account 151 Goods in transit by themselves because the products are landed cost products; Untaxed Amount is the sum of the two lines (5,300,000 VND), plus VAT 10% of 530,000 VND, Total 5,830,000 VND. After you confirm, the status is Posted and the Create Landed Costs button is on the button bar.
Step 13 - Create the landed cost from the bill and add the import tax
On the bill you just posted, click Create Landed Costs. On the landed cost document that opens, Apply On is Transfers; in the Transfers box choose the motor receipt of step 10. In the Additional Costs tab, click Add a line: Product Import Tax Cost, Cost 12,696,000 (10% of the shipment value on the customs declaration), and in the Account box of this line choose 3333 Import and export duties payable. Click Save.
Accounting > Vendors > Bills
What you should see: a document LC/2026/... in Draft, the Vendor Bill box pointing back to the forwarder's bill, Journal Inventory Valuation, the freight and fee lines already filled in with account 151 Goods in transit (the Additional Costs tab has the columns Product, Description, Account, Split Method and Cost), and the Import Tax Cost line carrying account 3333 Import and export duties payable; Total 17,996,000 VND, with the Compute button below it.
Why the import tax uses 3333: import tax is an amount payable to the state budget according to the customs declaration, and there is no vendor bill for it. If you leave the default account 151, account 151 would be credited with nothing posted against it.
Step 14 - Compute and post the landed cost
Accounting > Vendors > BillsClick Compute, open the Valuation Adjustments tab to see how the cost is split across the components, then click Validate.
Accounting > Vendors > Bills
What you should see: the status is Posted, the Journal Entry box holds the number of the entry (for example STJ/2026/11/0731), and a Valuation smart button appears at the top. The Valuation Adjustments tab has three lines for [DC-HUB-72V], each with Quantity 50.00 and an Additional Landed Cost of 3,500,000 VND, 1,800,000 VND and 12,696,000 VND; the Cost Line column carries the names of the cost lines (International Freight, Port Customs and Import Tax). The total is 17,996,000 VND, so each motor carries almost 360 thousand dong of extra import cost: Original Value 126,960,000 VND becomes New Value 130,460,000, 128,760,000 and 139,656,000 VND on the three lines. (The Original Value and New Value columns on the total row, 380,880,000 and 398,876,000 VND, are the sum of the three lines and mean nothing by themselves.) The entry: Debit 152 17,996,000; Credit 151 5,300,000 (matching the forwarder's bill); Credit 3333 12,696,000. The average cost of the motor rises accordingly: motors fitted into vehicles later carry this share of cost too. For the calculation and the entries in detail, see the part Accounting and costing.
Step 15 - Put the motors away into stock
Go back to the motor receipt (the breadcrumb at the top, or Inventory > Operations > Transfers > Receipts) and click the Next Transfer button. On the Storage transfer that opens, click Validate, then Validate in the date dialog.
Inventory > Operations > Transfers > Receipts
What you should see: a transfer NM1/STOR/00639 with Operation Type Nhà máy Yên Mỹ: Storage, Source Location NM1/Đầu vào (NM1/Input) and Destination Location NM1/Tồn kho (NM1/Stock), 50 motors; the status is Ready and, after you validate, Done. The Yen My factory receives goods in two steps: it receives into the input area for inspection, and only then puts the goods onto the shelves.
Step 16 - Issue the components to the line
Open the manufacturing order again (the Manufacturing button on the sales order, or find it in the list of manufacturing orders) and click the Transfers button to open the Pick Components transfer. Click Validate, then Validate in the date dialog.
Manufacturing > Operations > Manufacturing Orders
What you should see: before you validate, the transfer is Ready (with the Check Availability and Validate buttons), Operation Type Nhà máy Yên Mỹ: Pick Components, Source Location NM1/Tồn kho and Destination Location NM1/Trước sản xuất (NM1/Pre-production), and every line has its Quantity equal to its Demand - including the motor just received: the system reserved one motor from the new lot for this order by itself. After you validate, the transfer is Done and the components are in the pre-production area. The storekeeper handles one document for the whole vehicle.
Step 17 - Look at the manufacturing order before it goes to the line
Open the manufacturing order and open the Work Orders tab.
Manufacturing > Operations > Manufacturing Orders
What you should see: Component Status reads Available once the components are picked. The tab has the columns Operation, Work Center, Product, Quantity, Expected Duration, Real Duration and Status, with three operations: Lắp ráp tổng thành trên chuyền (line assembly of the complete unit; 45 minutes expected, work center Tổ lắp ráp trên chuyền (Line Assembly Team), Ready for its team once the components are picked), Lắp bánh xe, phanh (wheel and brake fitting; 15 minutes, Tổ lốp (Tyre Team)) and Kiểm tra hoàn thiện, đóng số khung (final inspection and chassis stamping; 15 minutes, Tổ kiểm tra xuất xưởng (Outgoing Inspection Team), with a Quality Checks tag) - the last two are in Waiting for another WO. The Quality Checks 4 smart button tells you that this vehicle goes through four checks before its order is closed.
Step 18 - Run the first two operations on the shop floor screen
Manufacturing > Operations > Manufacturing OrdersOpen the shop floor screen. In the left column, under My work centers, choose Tổ lắp ráp trên chuyền; type the order number (for example 01282) in the search box and press Enter. On the order card, click Open & start. Let the clock run for a while (the team leader doing real work), then click Finish operation. Do the same with Tổ lốp for the operation Lắp bánh xe, phanh.


What you should see: the screen is titled with the work center and your company; the filters at the top are All, Ready, Running, Waiting and Station stopped. The order card shows the order number, the label Ready, the product, the operation name Lắp ráp tổng thành trên chuyền, Responsible Unassigned, 0% and Output 0.00 / 1.00 Units. When you click Open & start, the operation screen opens with the label Running, a clock counting every second and an On behalf button; it has an Output block (0.00 / 1.00 Units with Record output), a Materials block, an Instructions block (the instruction text is written in Vietnamese on the demo system) and Call maintenance (machine keeps running). At the bottom there are Record scrap and Record materials used, and Pause, Stop machine (stops the line and asks for a reason) and Finish operation. After you finish, the card disappears from this team and the next operation moves to Ready at the next team. The real hours of each operation are recorded to calculate the cost.
Step 19 - Enter the chassis number on the order
The chassis number stamped on the vehicle is the serial number of the vehicle in the system. Open the manufacturing order, click the Lot/Serial Number box, type the chassis number that was stamped, for example RLVAU26K23001, choose the line Create "RLVAU26K23001", then click Save.
Manufacturing > Operations > Manufacturing Orders
What you should see: the Lot/Serial Number box shows the chassis number you typed, the Components tab lists each component with its To Consume and Quantity, and the order is already being worked on, so its status has moved on from Confirmed. The shop floor screen also has an Auto-generate lot button, but that button issues a number from the default numbering sequence (like 0000004), not in the chassis number format; that is why this lesson types the chassis number directly on the order.
Step 20 - Do the check before the last operation
Go back to the shop floor screen, choose Tổ kiểm tra xuất xưởng and find the order. The order card has no start button; it has an Open & do quality checks button instead. Click it. On the Quality checks before you start screen, on the line Overall Test Run and Sign-Off of Outgoing Inspection Slip click Pass, then click Start the operation.


What you should see: the order card (status Ready, Output 0.00 / 1.00 Units) has a yellow label 1 quality check(s) to do first and a reminder line Record the quality checks first: Overall Test Run and Sign-Off of Outgoing Inspection Slip. On the next screen, under Quality steps, the text 1 step(s) still to record and the step with the label To do and the buttons Pass, Fail, Add a note to the Fail, Take photo, Report quality issue and Reopen. The Start the operation button is greyed out until you click Pass; after that the operation moves to Running.
Step 21 - Record the outgoing inspection slip that was used
On the operation screen, the Materials block carries the label ▲ 1 material(s) still short, and Finish operation is greyed out with the line "1 material(s) still need a recorded quantity (enter 0 if none was used)". Scroll down to the line [LK0132] Viindoo Outgoing Inspection Slip (Actual 0.00, label Not recorded yet) and click that line. On the number pad, click As expected: 1.00 Units, then click Confirm consumption. Click Back to return to the operation.


What you should see: the Materials block lists each component with its location, Expected and Actual, and the label ✓ Enough once recorded; the lot-tracked components show their lot number, and [DC-HUB-72V] Hub Motor 72V 1500W 12-inch Rim carries the lot number recorded when the motors were received. The number pad shows Expected 1.00, Actual 0.00 and the Confirm consumption button (with "Actual after recording: 1.00 of 1.00 Units"). After you record, the inspection slip line has Actual 1.00 and the label ✓ Enough, and the label 1 material(s) still short is gone. The team leader records the quantity really used right at the line; if the usage differs from the bill of materials, type the actual quantity. The Quality steps block on the same screen shows the step you passed in step 20 with the label Passed.
Step 22 - Record the finished vehicle with its chassis number
Click Record output. Under the line Tracked by serial number: record exactly 1 unit, once. click the 1.00 cell. Check that the Finished lot block shows Assigned lot RLVAU26K23001, then click Confirm output. Click Back to the operation.

What you should see: on the Record output screen the left block Quantity just made shows 1.00 Units, "Recorded 0.00 / 1.00 Units" and "After this recording: 1.00 / 1.00 Units"; the right block Finished lot shows the Auto-generate lot button, the Assigned lot and the list under Or pick an existing lot. After you confirm, the screen shows One serial-numbered unit per order ("This order makes one serial-numbered unit, and it is recorded (1.00 / 1.00 Units)") and an Undo the last recording block with an Undo button in case you recorded by mistake. Back on the operation screen you see Output 1.00 / 1.00 Units and the finished lot.
Step 23 - Finish the operation
Click Finish operation.


What you should see: because this is the last operation, the system opens the Confirm Closing the Production Order screen at once, with the label Awaiting confirmation, a block The order closes with these figures (Product, Output recorded 1.00 / 1.00 Units and Finished lot RLVAU26K23001), a warning This action cannot be undone and a block Finished product checks with 3 step(s) still to record. The Confirm closing order NM1/MO/01282 button is still greyed out; the last line says the screen is waiting for the inspector to record the result ("Waiting for ... to check: ...").
Step 24 - Check the chassis and engine numbers and close the order
Compare the chassis and engine numbers on the vehicle with the label, then click Pass on the line Match Chassis and Engine Numbers to Label. Do the same with Test Brakes, Lights, Horn and Instrument Cluster and Paint Appearance and Plastic Assembly. Click Confirm closing order NM1/MO/01282.

What you should see: each check line has a green Passed label at its right corner; the Confirm closing order button lights up. After you click it, the screen says Order closed with 1.00 Units produced. If a step is Failed, the inspection team adds a note (Add a note to the Fail), takes a photo, or clicks Report quality issue to create an alert, and the step can be reopened with Reopen; these three check points are set to block when they fail, so the order cannot be closed until the problem is handled (see the part Shop floor production).
This action cannot be undone: after the order is closed, quantities, lots and materials can no longer be changed from the shop floor screen. If anything is wrong, click Back, not yet closed before you confirm.
Step 25 - Record the chassis and engine numbers on the vehicle's record
Open the serial number record of the vehicle: on the manufacturing order click the value of the Lot/Serial Number box, or search for the chassis number in the list of lot/serial numbers. Fill in the three boxes that belong to the vehicle (they are properties of the record, and their labels are in Vietnamese on the demo system): Số khung (chassis number) RLVAU26K23001, Số máy (engine number), the number stamped on the motor, for example VM72-6K23001, and Năm sản xuất (year of manufacture) 2026. Click Save.
Inventory > Products > Lots / Serial Numbers
What you should see: the three boxes show the values you just typed (the year appears with a thousands separator, 2,026). From now on, a dealer or a warranty workshop who searches by chassis number gets this vehicle (step 33). The lot number of the imported motor does not have to be typed by hand: the system recorded it when the motor was fitted in step 21.
Step 26 - Read the vehicle cost on the order overview
Open the manufacturing order. On the row of smart buttons, click More, then choose Overview.
Manufacturing > Operations > Manufacturing Orders


What you should see: the order is Done (status bar Draft, Confirmed, Done), Progress 100 %, and on the Components tab the Quantity column equals To Consume on every row. The MO Overview screen (with the Print, Unfold and Display controls) has the columns Quantity, Unit Cost and Real Cost: the first row is the vehicle itself (Unit Cost 17,215,463 VND, Real Cost 17,213,769 VND in the trial run), followed by every component with its cost; the row [DC-HUB-72V] Hub Motor 72V 1500W 12-inch Rim carries the motor's average cost, which includes the import costs added by landed costs (2,900,432 VND in the trial run). Scroll to the bottom to see the Operations group (0.0414 hours, 7,853 VND) with the real hours of each team multiplied by the team's hourly rate (for example Tổ lắp ráp trên chuyền (Line Assembly Team) 230,000 VND per hour), then Unit Cost, Total Cost of Components (17,205,916 VND) and Total Cost of Operations (7,853 VND). The labour hours in this lesson are small because the operations only ran for a few minutes; in a real workshop the hours are the time the team really works.
Step 27 - See the cost by cost item
On the order, click More, then choose Cost Analysis.
Manufacturing > Operations > Manufacturing Orders
What you should see: the page Production Cost Analysis starts with the product, then Total Quantity: 1.00 Units, from 1 manufacturing order(s), Total Cost: and Unit Cost: (17,215,463 VND in the trial run). Below are three cost items: Direct Materials Costs (a table with the columns Materials, Manufacturing Orders, Standard Quantity, Actual Consumption Quantity, Unit Cost, Cost Share (%) and Total Cost), Direct Labor and Manufacturing Overheads by operation. This is the figure posted to finished goods stock: the entry that closes the order posts Debit 155 / Credit 154 for exactly this Total Cost. The Overview screen in step 26 prices operations at the team's hourly rate, so its real cost may differ from this figure by a few thousand dong (17,213,769 VND against 17,215,463 VND here); the figure used for accounting is the one on Cost Analysis. For the calculation and the entries in detail, see the part Accounting and costing.
Step 28 - Deliver the vehicle to the dealer
Open sales order S04396 and click the Delivery button. On the delivery transfer (operation type Nhà máy Yên Mỹ: Delivery Orders), click Validate, then Validate in the date dialog.
Sales > Orders > Orders

What you should see: before you validate, the transfer NM1/OUT/... has Delivery Address Đại lý Xe điện Hải Dương, Source Location NM1/Tồn kho, Product Availability Available and the status Ready: the vehicle with chassis number RLVAU26K23001 was reserved for this order the moment the manufacturing order closed. After you validate, the transfer is Done, the Effective Date box holds the time you clicked, and Traceability, Moves and Journal Entries buttons appear at the top.
Step 29 - Invoice the dealer
Go back to the sales order and click Create Invoice. In the Create invoice(s) dialog, keep Regular invoice and click Create Draft. On the draft invoice, click Confirm.
Sales > Orders > Orders

What you should see: the dialog has the Create Invoice choices Regular invoice, Down payment (percentage) and Down payment (fixed amount). The invoice is a Customer Invoice with the vehicle line, Price 36,000,000.00, Taxes 10% and Amount 30,240,000 VND (the 16% dealer discount is already applied), VAT 10% 3,024,000 VND, Total 33,264,000 VND, Payment terms 30 Days and Journal Customer Invoices in VND; after you confirm, it has a number INV/2026/... and the status Posted, and Amount Due shows 33,264,000 VND. The dealer's receivable rises accordingly.
Step 30 - Look up the chassis number
Open the list of lot/serial numbers, type RLVAU26K23001 in the search box and press Enter. The list is grouped by location; click the group Partners/Customers (1) to open it.
Inventory > Products > Lots / Serial Numbers > Warranty > Lot/Serial Numbers
What you should see: exactly one row RLVAU26K23001, with the product [XMD-AURA-XR-CC] Viindoo Aura Electric Motorbike (Moss green, Premium), in the group Partners/Customers - the vehicle has left the warehouse and gone to the customer.
Step 31 - Open the vehicle record and the warranty deadline
Inventory > Products > Lots / Serial NumbersClick the row of the chassis number. Scroll down to the Sales Purchases Warranty Info block.
Inventory > Products > Lots / Serial Numbers

What you should see: Customer and Last Delivery Partner are Đại lý Xe điện Hải Dương, Location is Partners/Customers; Số khung and Số máy are as recorded in step 25. The smart buttons at the top include Sales 1, Transfers 1, Location and Traceability. In the warranty block: Warranty period (months) 36, Customer Warranty Start Date is the delivery date of the vehicle (11/23/2026 in the trial run), Customer Warranty Expiration Date is exactly three years later (11/23/2029), Sales Orders S04396; the Warranty Policy table (columns Milestone, Apply to, Operation Start, Current Measurement) has two milestones, 36 tháng [36 Months] and 20.000 km [20000 km]. The warranty deadline is calculated when the vehicle is delivered; nobody has to enter it. At the top there is a Create Warranty Request button - when the dealer reports a defect, the warranty request is opened from this very record (see the part Warranty and repairs).
Step 32 - Trace the vehicle back to its component lots
Click the Traceability button at the top of the record. On the report, click the arrow in front of the row NM1/MO/01282 to open the components of the vehicle.
Inventory > Products > Lots / Serial Numbers
What you should see: the Traceability Report has a delivery row NM1/OUT/02532 (from Tồn kho (Stock) to Customers) and an order row NM1/MO/01282 (from Production into Tồn kho). When you open the order, you see all 19 components fitted into the vehicle, each with a quantity.
Step 33 - Trace the motor lot back to the vendor
Scroll to the bottom of the report. On the row [DC-HUB-72V] Hub Motor 72V 1500W 12-inch Rim (see its lot in the column Lot/Serial #), click the arrow in front of the row; repeat with the new rows that open until no arrow is left.
Inventory > Products > Lots / Serial Numbers
What you should see: the three lot-tracked components (motor, controller, battery) show their lot number right on the row. The motor lot traces back to the chain NM1/PC/... (picked for the line), NM1/STOR/... (put away, 50 units), NM1/IN/... (from Vendors into Đầu vào (Input), 50 units) - that is, back to the motor's receipt and its purchase order, the lot of 50 motors imported from Jiangsu Huanyu in stages 2 and 3. If that motor lot later turns out to be defective, open the lot record of the motor (Inventory > Products > Lots / Serial Numbers) and click Traceability: the report lists every manufacturing order that took motors of this lot, and from there each vehicle.
Three questions of an assembly business, answered on one vehicle: where the money is (the motor cost already includes tax, freight and fees; the vehicle cost separates materials from labour hours), which component lots the vehicle is made of and where it is now (traced from the chassis number), and who bought it at what price (the order and the invoice follow the dealer pricelist). The following parts go deeper into each stage: configuration, every status, exception cases and reports.