On 27/11/2026 in Hai Phong, Viindoo handed over the system and completed the ready mix digital transformation project at Phuc Tien (brand PTC), a ready-mix concrete producer with 5 plants in Hai Phong, Hai Duong and Bac Ninh. After almost six months of implementation, Sales, Purchase, Inventory, Manufacturing and Accounting of 2 legal entities run on one Viindoo system with 26 standardized processes, and the batching plants and weighbridge are connected to the same system. This article looks back at the original problem, how it was solved and what Phuc Tien has at handover.

Handover of the Viindoo system at Phuc Tien, Hai Phong, 27/11/2026.
5 core functions
Sales, Purchase, Inventory, Manufacturing and Accounting on one system for 2 legal entities.
26 processes
Standardized at handover, 24 of them business processes.
3 batching plants + 1 weighbridge
Connected to Viindoo.
Seconds and 10 minutes
Weighbridge tickets arrive within seconds; batching plant data every 10 minutes.
The handover: from implementation to operation
At the handover ceremony, Viindoo delivered to Phuc Tien:
- The Viindoo system running 5 core functions for both companies, with the weighbridge and batching plant integration.
- The set of 26 application processes agreed by both sides.
- A 2-volume user guide: Daily Operations, and Administration and Configuration.
The handover closes the implementation phase that started on 04/06/2026. From here, Phuc Tien's teams run the system themselves, and Viindoo remains a lifelong partner, standing by Phuc Tien throughout the life of the system as the business grows.
About Phuc Tien
Phuc Tien Co., Ltd. and Phuc Tien Construction Concrete Co., Ltd. supply ready-mix concrete to customers in Hai Phong and neighbouring provinces.
- 5 plants in Hai Phong, Hai Duong and Bac Ninh, with a total area of 22 ha.
- Products: ready-mix concrete, square concrete piles, spun piles and precast concrete.
- Operations: 3 concrete batching plants, 1 weighbridge and a fleet of truck mixers.
According to the project kick-off documents, as customers demanded standardized quality records and cost pressure grew, Phuc Tien needed a centralized data platform, the foundation of a ready mix digital transformation, to keep the competitive edge it has built over 30 years and to prepare for its next stage of growth.

Cement silos at a Phuc Tien concrete batching plant.
The problem: one truckload, four places of record
For a ready-mix concrete business, the truckload is the most important control unit of delivery. Each load creates data in several places: the batching plant records the batches and materials used, the weighbridge records the truck weight on exit, the guard records the truck passing the gate, and sales records the order and the receiving site. When these places are not connected, one truckload has four records, and someone has to reconcile them at the end of the period.
At Phuc Tien, the figures of those four places were also spread across four different tools. The kick-off documents recorded the situation:
- Data was scattered across 4 places: the CIM batching plant software, the weighbridge software, Excel and Zalo.
- Weighbridge tickets were printed on paper and then typed in again by hand.
- Material quantities of the batches were summarized and sent to accounting to be typed in again.
- Orders arrived via Zalo and quotations were made in Excel.
- At the end of each day and month, teams spent time reconciling figures between the weighbridge, the batching plant, materials accounting and sales. The same data was entered several times.
- Order history, receivables and material stock against standard consumption could not be looked up; the risk of loss sat in delivery, between drivers, guards and the plant.
The cost was not only data entry time. When accounting receives material consumption as a summary sheet, it is hard to know right away which load used more material than the standard. When delivery figures sit in four places, gaps between the batched volume, the weighed volume and the volume the customer confirms are usually found only at the end-of-day or end-of-month reconciliation, when tracing the cause is much harder.
Project goals
Both sides agreed on four goals for the ready mix digital transformation at the kick-off:
- One source of data: orders, production, delivery, inventory and management accounting on one platform.
- Automated data transfer between systems: batch data from CIM and weighbridge tickets flow into Viindoo automatically; accounting and storekeepers only reconcile, they do not re-enter.
- Digitalize 5 core functions: Sales, Purchase, Inventory, Manufacturing and Accounting.
- Management and departments see the figures in the system directly, without waiting for summary reports.
One principle behind the batching plant integration was agreed early: the CIM batching plant software and the weighbridge software keep working as they are. Viindoo is the central management system and only adds a way to receive their data, so plant operators do not have to relearn the tools they use every day.
Implementation roadmap
The project started on 04/06/2026 and was split into 3 packages delivered in sequence; each package started only after the previous one was completed:
Package 1: Purchase - Sales - Inventory
Package 2: Manufacturing, concrete batching plant integration (CIM) and weighbridge
Package 3: Accounting
All three packages were completed and the system was handed over on 27/11/2026.

Handover slide: Viindoo system with weighbridge and batching plant integration for Phuc Tien.
Ready mix digital transformation across 5 functions and 26 processes on one system
The new way of working is described in the set of application processes agreed by both sides: 2 overview processes and 24 business processes.
| Area | Processes | Main content |
|---|---|---|
| Overview | 2 | Overall production and business flow of each company |
| Sales | 2 | Concrete sales, pile sales |
| Purchase | 1 | Purchase requests, purchase orders, attached contracts |
| Inventory | 7 | Receipts, material issues to workshops and sites, pile finished goods, delivery, returned concrete, stock counts |
| Manufacturing | 2 | Concrete production, pile production |
| Accounting | 12 | Receivables, payables, cash and bank, inventory, production, assets and depreciation, payroll, costs and allocation, advances, expenses, advance-expense reconciliation, loans |
Each process states which position does the work, which steps are done in Viindoo and which tasks remain outside the software, so the responsibility of each department is clearer. Both Phuc Tien companies share one system, so management sees the figures of both legal entities in one place.
Highlight: integrating the batching plants and weighbridge with Viindoo

How plant data reaches Viindoo: weigh tickets within seconds, batch tickets every 10 minutes, gate confirmations by the guard, and a trip-by-trip cross-check.
For the values this integration brings to Phuc Tien day to day, read 5 values of concrete batching plant integration for Phuc Tien. The sections below explain how it works.
Weighbridge: tickets reach Viindoo within seconds
Whenever the weighbridge operator saves a ticket on the plant computer, the ticket reaches Viindoo automatically within seconds. The system maps the item name on the ticket to a product, then waits for a reviewer to match it with an inventory document: a receipt for incoming materials, a delivery order for outgoing concrete.

Weigh ticket in Viindoo, received from the weighbridge software (Vietnamese interface). Customer data is masked.
When matching, the system compares the total weight of all tickets on an order line with the ordered quantity. If the total exceeds the ordered quantity by more than 5%, the ticket moves to "Needs review" for the responsible person to check. The check only flags the excess side, because one order line is usually delivered by several consecutive trucks, so being short while delivery is still in progress is normal.
Batching plant: each concrete load becomes one batch ticket
The CIM batching plant software does not send data out by itself. Viindoo installs a synchronization program on the computer at each batching plant that reads CIM data and sends it to Viindoo periodically, currently every 10 minutes. Each concrete load leaving the plant is recorded as one batch ticket, with the batches and the actual weighed material of each batch.

Batch ticket in Viindoo, synced from the CIM batching plant software: concrete grade, batches, finished product and deviation from the standard (Vietnamese interface). Customer data is masked.
When there is enough evidence, the batch ticket is assigned automatically to the right open manufacturing order: the weighbridge ticket provides the sales order, the batch ticket provides the concrete grade, and together they identify the sales order line and its manufacturing order. Tickets without enough evidence are flagged for the batching plant dispatcher to review. The system does not create manufacturing orders by itself.
Material consumption from the plant's actual figures
When a batch ticket is assigned to a manufacturing order, Viindoo records material consumption from the plant's actual weighed figures, not from the theoretical standard. Stock is reduced by the material actually used. The system flags differences between actual and standard consumption, and a monthly material reconciliation report lets accounting and plant managers follow them.
Gate control and cross-checking
Guards confirm trucks leaving through the gate on the Gate Control screen in Viindoo. The confirmation does not create or change weighbridge or batching data; it records who let the truck out and when.
Because one concrete delivery has both a weighbridge ticket and a batch ticket, the system matches the two by plate number, weigh time after mixing, weighed volume and concrete grade, and leaves uncertain trips for a person to decide, so the volume is not counted twice. The Trip Reconciliation report puts the guard's gate confirmation, the batched volume and the weighed volume of each trip side by side, calculates the difference and flags trips that deviate. Once the figures are agreed with the customer, the reconciler clicks Lock to freeze them.
Exceptions are recorded and have an owner
Both the weighbridge and batching plant software allow free-text entries such as item names, concrete grades and customer names. Viindoo uses mapping tables, set up once by managers, to bring these entries to the standard master data. When a new concrete grade or customer name appears, the system adds it to the mapping table for the manager to choose the matching record. Without a mapping, the ticket moves to "Needs review". The system does not guess without enough evidence, and it does not adjust cubic metres to match the weighbridge ticket; it only flags the case for the responsible person.
Ready mix digital transformation results at handover
At handover, the ready mix digital transformation at Phuc Tien had changed how figures are recorded and reconciled across the five core functions:
| Area | Before | After |
|---|---|---|
| Data sources | Scattered across 4 places: CIM, weighbridge software, Excel, Zalo | CIM and weighbridge data centralized in Viindoo; orders, inventory, manufacturing and accounting in Viindoo for both companies |
| Weighbridge tickets | Printed, then re-entered by hand | Reach Viindoo within seconds, matched with inventory documents |
| Batch data | Material summaries sent to accounting for manual entry | Synced every 10 minutes, one batch ticket per load, assigned to the manufacturing order when there is enough evidence |
| Material consumption | Could not be looked up against the standard | Recorded from actual weighed figures, deviations flagged, monthly report |
| Delivery reconciliation | End of day and month, across several departments | Trip-by-trip matching of gate, batching plant and weighbridge in one report |
The system comes with a 2-volume user guide: Daily Operations, for guards, weighbridge staff, batching plant staff and sales document managers; and Administration and Configuration, for system administrators and plant managers.
Operating indicators such as month-end reconciliation time and material variance will be measured as Phuc Tien runs the system and shared in a later update.
Lessons for a ready mix digital transformation
The ready mix digital transformation at Phuc Tien points to four practical lessons for other ready-mix concrete producers.
Use the truckload as the unit of reconciliation
When weighbridge, batching, gate and delivery figures all refer to one trip, gaps can be spotted the same day instead of waiting for period-end reconciliation.
Keep the plant control software
Connecting data from the batching plant and weighbridge software already in use usually causes less disruption than replacing them; plant operators keep working as before.
Master data mapping is core work
Free-text entries at the plant, such as item names, concrete grades and customer names, must be mapped to standard master data before the figures are usable for inventory and accounting.
Exceptions need a queue and an owner
A good system does not guess on people's behalf; it puts tickets without enough evidence into the "Needs review" list and makes clear who handles them.
For readers new to the topic, a concrete plant combines cement, aggregates, water and admixtures in measured batches; the ready mix digital transformation described here connects those batch records with sales, inventory and accounting.
Next phase: comprehensive HR management and AI
After the handover, Phuc Tien and Viindoo move to the next phase: rolling out comprehensive HR management (HRM) on the same Viindoo system and building AI into daily operations, so that production, accounting and people data sit on one AI-enabled management platform.
Thank you
Viindoo sincerely thanks the management and key users of Phuc Tien for their partnership throughout this ready mix digital transformation, and wishes Phuc Tien effective operation and continued growth.
Do you also run batching plants, a weighbridge and a truck mixer fleet? Tell us which reconciliation step costs your team the most effort. Book a consultation or see the cost.
Related articles
- Concrete Batching Plant Integration: 5 Values for Phuc Tien (PTC)
- 300-Employee Manufacturer: The Secret to Successful Digitalization
- Tachi Cable: A Successful Digital Transformation Journey with Viindoo
- An Viet Mechanical Manufacturer: Digital Transformation Success Story
- How BDO Transformed Their Legacy Operations into a Modern Success Story with Viindoo ERP?