- APPS
- Shop Floor Control 19.0
| Lines of Code | 12228 |
| Technical name | viin_mrp_workorder |
| License | OPL-1 |
| Website | https://viindoo.com/apps/modules/19.0/viin_mrp_workorder |
| Read description for | v 10.0 v 11.0 v 12.0 v 13.0 v 14.0 v 15.0 v 16.0 v 17.0 v 18.0 |
| Required Apps | Manufacturing (mrp) Discuss (mail) Inventory (stock) Employees (hr) |
| Included Dependencies | Viindoo Manufacturing Web Gantt |
| Extensions | Shop Floor Control - Backdate Shop Floor Control - Maintenance MRP Barcode Shop Floor Control - Accounting |
The figures in your system are the ones your operators just made
For manufacturers that run work orders at the machine and cost labour per person
Run every work order from a tablet at the machine: a job board per work center, output and materials recorded as they happen, machine stops with their reason, order closing on screen, and labour cost credited to the person who did the work.
Odoo 19.0 · Community Edition, Viindoo Cloud · OPL-1
What changes for your team
Output and materials are recorded when they happen
Today: quantities are noted on paper and typed in at the end of the shift.
→ Operators tap the quantity made and the components actually used against the expected quantity, by lot or serial number. A shortage shows before the order closes.
Labour cost follows the person who worked
Today: labour is costed per work center, at one average rate.
→ Each time line names the user who recorded it and the employee who worked, and freezes that employee's hourly cost when it closes, so a later pay rise never re-prices finished work.
Every stop is measured, with its reason
Today: a breakdown is remembered at the end of the shift, or not at all.
→ One tap on a reason tile stops the work center and times the stop until someone restarts the station. Stopped time is not counted as labour, and every restart is recorded.
Ready on day one
Your work centers, as they are
The board works from the work centers and operations you already have; each account picks its stations once and keeps them.
People and access
Set first: one access right per person, and each user linked to an employee, so work is credited to the right person.
Labour rates
Set first: each employee's hourly cost, and the rate per employee of each work center for anyone without one.
What is included
On its own the module covers the job board, operation instructions on screen, output, materials and scrap, machine stops, recording on behalf of a colleague, closing the order at the machine, planned labour in the cost overviews, the work order planning views and a full audit trail of what was recorded on the shop floor, by whom and for whom.
Optional extensions
Shop Floor Control - Accounting
Books the labour, work in progress and analytic entries of the shop floor in accounting.
Shop Floor Control - Maintenance
Reports a breakdown from the tablet: one tap stops the work center and calls a technician.
Shop Floor Control - Backdate
Users with the back-date right run the tablet with the real time of every tap.
Before you decide
Does every operator need a user account?
Yes. Work is recorded under a user linked to an employee, because time and labour cost are credited to that employee. Each account keeps its own stations, so people sharing a tablet never overwrite each other's choice.
Who can do what?
Manufacturing users run work orders, restart a stopped station and undo their own recordings while the order is open. Manufacturing administrators also record on behalf of a colleague, undo anyone's recording, approve consumption differences and see every entry. Scrap cannot be undone from the tablet.
What if the connection drops while recording?
The screen offers Retry. A retried recording is applied once, never twice.
Does the tablet bypass our manufacturing rules?
No. Closing an order runs the standard manufacturing close, so every installed rule still applies. When a bill of materials blocks consumption differences, the operator asks a manager to approve.
How is labour cost counted?
Time worked multiplied by the credited employee's hourly cost, frozen when the time line closes. Planned labour follows the number of employees each operation needs and appears in the bill of materials and manufacturing order overviews.
Try it, then ask us
The Documentation tab holds the user guide by role. Live demo: https://v19demo-int.viindoo.com
Pre-sales & partnership
https://viindoo.com/contactusTechnical support
https://viindoo.com/ticketTechnical requirements
- Odoo version: 19.0
- Editions: Community Edition, Viindoo Cloud
- Required modules: Viindoo Manufacturing, Employee Hourly Wage, Barcode
- License: OPL-1
- Languages: English, Vietnamese
Shop Floor Control
Who this guide is for. Machine operators and production planners (access right Manufacturing / User), shift leads (Manufacturing / Administrator) and the administrator who sets the module up.
Shop Floor Control puts the work orders of your plant on one touch screen at the machine. Operators open their jobs from a tablet, record the quantity they have just made and the materials they really used, report machine stops with their reason and close the manufacturing order on screen. The labour cost is credited to the employee who did the work.
The application is called Shop Floor on the apps menu. The screenshots show the demo company: Marc Demo is the machine operator, Mitchell Admin is the shift lead and Anita Oliver is another employee to whom Mitchell credits an operation.
Overview
A work order moves through the shop floor in four stages. Each stage has one person who acts and one hand-off.
- Ready. The operator picks the work center and starts the job. The planner sees the same jobs on the desktop.
- In progress. The operator records output, materials and scrap, and stops the machine when something goes wrong. Any Manufacturing user restarts a stopped station once the cause is fixed.
- Done. The operator finishes the last operation. The tablet moves on to closing the manufacturing order.
- Waiting to be closed. When the materials used differ from a bill of materials that does not allow differences, the order waits for the shift lead, who confirms and closes it.
| Role | What they do | Access right to assign |
|---|---|---|
| Machine operator, production planner | Works the jobs on the tablet, records output, materials and scrap, stops and restarts the machine, closes the order. The planner follows the work on the desktop. | Manufacturing / User |
| Shift lead | Approves consumption differences, records work on behalf of another employee, undoes anyone's recording and audits every entry. | Manufacturing / Administrator |
| Administrator | Installs the module, turns on Work Orders, sets hourly costs, the number of employees per operation and the instructions. | Role / Administrator |
Setup (for the Administrator)
Installation
- Open Apps.
- Search for Shop Floor Control.
- Click Install.
The apps it needs are installed automatically: Manufacturing, Employee Hourly Wage and Barcode. When the installation is done, the Shop Floor app appears on the apps menu, and Shop Floor Entries appears in the Manufacturing reports.
You can also install it from Manufacturing ‣ Configuration ‣ Settings, in the row Shop Floor Control.
Work Orders and accounting settings
Open Manufacturing ‣ Configuration ‣ Settings and look at the section Operations.
- Tick Work Orders and click Save. It adds Manufacturing ‣ Overview, Manufacturing ‣ Planning ‣ Work Orders, Work Centers and Operations under Configuration. The Shop Floor app and Shop Floor Entries do not need it.
- The row Shop Floor Control - Accounting reads "Book the labour, work in progress and analytic entries of the shop floor in accounting. Installs Advanced MRP Accounting and the Accounting apps it needs." Booking the labour and the work in progress in accounting is the job of that separate module, which has its own guide. Tick its checkbox and click Save. When the module is not available on your server, the row offers the link Download or Learn more instead of the checkbox.
Access rights
- Give each operator and each planner the access right Manufacturing / User. They see the Shop Floor app, the planning views and their own lines in Shop Floor Entries.
- Give each shift lead the access right Manufacturing / Administrator. Only they can record work on behalf of someone else, confirm consumption differences on a bill of materials that blocks them, undo another person's recording and see all lines in Shop Floor Entries.
- Link the user of each operator to an employee: on the employee, open the Settings tab and fill User. The work and the labour cost are credited to that employee.
Hourly cost of each employee
The labour cost of a job is the time worked multiplied by the hourly cost of the credited employee. You need access to the employee settings to enter it.
- Open the employee in the Employees app and click the Settings tab.
- Check that User is the operator's user, and enter the Hourly Cost under APPLICATION SETTINGS.
Work centers and operations
Open Manufacturing ‣ Configuration ‣ Work Centers and open a work center.
Under COSTING INFORMATION, two lines hold the rates. Cost per hour, ending in per workcenter, is the cost of running the work center. Employee Hourly Cost, ending in per employee, is the hourly cost of one employee at this work center: it is used for an employee who has no hourly cost of their own, and it plans the expected labour of an operation.
Open Manufacturing ‣ Configuration ‣ Operations and open an operation. In Employee Capacity, enter how many employees the operation plans for. It budgets the expected labour cost only; the actual labour cost follows the time each employee records.
Instructions of an operation
The operator reads the drawing, the slides or the note of an operation on the tablet. You declare them on the operation.
- Open Manufacturing ‣ Configuration ‣ Operations and open the operation.
- Open the Instructions tab and choose PDF, Google Slide or Text, then upload the file, paste the link or write the note.
How the labour cost is built
- Each time line of a work order names the employee it is credited to. When the line closes, it freezes that employee's hourly cost. When the employee has no hourly cost, the line keeps the Employee Hourly Cost of the work center instead. A later pay rise never re-prices finished work.
- Time lost to a stop, such as a breakdown, is not part of the labour cost.
- The planned labour of an operation is its expected duration multiplied by its Employee Capacity and by the Employee Hourly Cost of the work center. The overview of a bill of materials and the overview of a manufacturing order include it in the cost of the operation.
To see it, open Manufacturing ‣ Operations ‣ Manufacturing Orders, open an order and click Overview. The columns MO Cost and BoM Cost carry the operation line.
Consumption differences
On the bill of materials, the tab Miscellaneous has Flexible Consumption with the values Allowed, Allowed with warning and Blocked. With Blocked, an operator who used more or less than expected cannot close the order: the tablet offers to send the differences to a manager.
Scrap reasons
The scrap screen of the tablet offers an optional Reason when your database holds scrap reason tags. Without any tag, the block is not shown and a scrap is recorded without a reason.
The tablet
Each operator signs in on the tablet with their own account. The work centers and the operators that you choose are remembered per account and per company, so people who share a tablet never overwrite each other's choice.
Machine operator and production planner: work the jobs
The tasks below need the access right Manufacturing / User. Tap with a finger: quantities go in on a number pad and choices are tiles, so you rarely type.
Choose your work centers and open the job board
- Open the apps menu and tap Shop Floor. If you have not chosen any work center yet, the selection screen opens. Each card shows its counts, such as 3 ready to start, and adds the jobs that are waiting or stopped when there are some.
- Tap the card of the work center you work at, for example Assembly 1. The card is highlighted. If you work at another station too, tap its card as well.
- Tap Open job board. Your choice is saved for your account and company, so the next shift opens straight on the board.
- To add or drop stations without leaving the board, tap Manage work centers, pick the cards and tap Add to my work centers. To look at another station you chose, tap its name under My work centers; each name carries its number of jobs.
Read the job board
The board shows one card per work order: the manufacturing order, a state badge, the product, the operation, the person responsible, a progress percentage, a progress bar and the output recorded so far as Output 2.00 / 3.00 Units.
- The tabs All, Ready, Running, Waiting and Station stopped each show a live count. Ready also lists the paused jobs. Waiting lists the jobs whose previous operation has not produced anything yet. Station stopped lists the jobs of a stopped work center.
- The progress bar is time-based: the time worked divided by the expected duration, and 100 when the work order is done. The output pill beside it counts the quantity recorded.
- A job that waits for components carries the yellow chip Waiting for components, and a job whose previous operation is not finished carries Waiting for another WO. Both can still be started: the card says "you can start anyway".
- Under Operators, tap a name to show only the jobs that person works on; tap Add operator to add a person to the list.
- Use the search bar to narrow the cards, and Refresh to read the board again.
Start, pause and resume a job
Tap Open & start on a card. It opens the operation and starts the clock. The badge turns to Running and the timer counts. Tapping anywhere else on the card only opens the job; it never starts the clock.
To take a break, tap Pause. The badge becomes Operation paused and the button becomes Resume.
Tap Resume when you are back. The clock starts again for you.
On the board, the card of a running job offers Continue operation, the card of a paused job offers Resume operation and a job on a stopped station offers Open operation.
Read the instructions of an operation
The panel Instructions of the operation screen shows the note of the operation, or a button for its PDF or slides. Tap View drawing full screen to open it over the whole screen, and tap Close to come back. When the operation has no instructions, the panel says so.
Record the quantity you have just made
On the operation screen, tap Record output. The screen reads "Recorded 0.00 / 3.00 Units - enter the quantity you have just made".
Tap the digits of the quantity you have just made, for example 2. No keyboard opens. The pad states "After this recording: 2.00 / 3.00 Units".
Tap Confirm output. The quantity is added to the order as its own recording and the screen reads "Recorded 2.00 / 3.00 Units". The screen stays open: enter only what you make next, and the new figure is added on top of the earlier ones.
Made a mistake? Under Undo the last recording, tap Undo. It takes back exactly the latest recording, without a confirmation.
Tap Back to return to the operation screen, or Finish operation when nothing is left to record.
Note
You can undo only your own recordings, and only while the operation and the order are still open. A Manufacturing Administrator can undo anyone's recording.
The finished lot, the serial numbers and the materials belong to the last operation of the order. On the earlier operations of a routed order, Record output shows the number pad only.
Record a finished lot
When the finished product is tracked by lot and you are on the last operation, the screen shows the number pad and the area Finished lot side by side on a tablet (from 768 px wide); on a phone they stack in one column.
Tap Auto-generate lot. The lot appears under Assigned lot. You can also pick an existing lot from Or pick an existing lot; Latest marks the newest one.
Tap the digits of the quantity and tap Confirm output.
- Auto-generate lot is offered only when the operation type of the order lets you create new lots. When it does not, pick an existing lot from the list or find it by name under Not in this list? Search every lot by name.
- An order makes one finished lot. Once output is recorded under a lot, recording under another lot is refused. The message gives the way forward: undo the earlier output first, or close the order and continue on a backorder under the new lot. Repeating the same action would only repeat the refusal, so this message has no Retry button.
Record serial numbers
When the finished product is tracked by serial number, one manufacturing order records several serial numbers. Each recording is one unit under one serial number.
Tap Record output. The screen shows Recorded on the order, for example 0 / 3, and the list Finished serial numbers.
Tap Generate a serial number, or scan or pick the next serial number under Next serial number, then tap Confirm output. Repeat for each unit. The counter and the list follow.
Under Undo the last recording, tap Undo to take back the latest unit.
Record the materials you really used
On the operation screen, tap Record materials used. Every component is a row with the Expected and Actual quantities and a chip such as Not recorded yet, Short or Enough.
Tap a component, tap the digits of the quantity used and tap Confirm consumption. Under the button, the screen shows the resulting "Actual after recording". Zero is allowed, and As expected fills in the planned quantity with one tap.
For a component tracked by lot, tap Lots in stock to see the lots with their quantity on hand, or Scan the label where the device can scan. Tap the lot you used, then tap the digits of the quantity used from that lot.
If you used something that is not in the bill of materials, tap Add a component outside the bill of materials. Search by name, reference or barcode and tap the product. It opens with the badge Outside the bill of materials. Tap the digits of the quantity used and confirm.
The list includes the extra component. Tap Undo on a row to restore its earlier figures. Only the latest standing entry of a row can be undone, by its author or by a Manufacturing Administrator.
Tap Back to operation.
Note
Until you enter a figure yourself, Actual is an estimate based on the reserved quantity that follows the output you record. Once you confirm a figure, it stays as you entered it.
Note
The lots you name for a component on the shop floor are created when the manufacturing order is closed. This happens only when the operation type of the order allows creating new lots for components. If it does not, naming a lot that does not exist is refused: ask the warehouse to receive the lot first.
Record scrap
From the bottom of the operation screen, tap Record scrap. Tap the product that was spoilt, for example Drawer Black.
Because the product is tracked by lot, the screen asks "Which lot is this scrap from?". Tap the lot.
Read the warning: recording scrap cannot be undone from the shop floor, and the stock is deducted the moment you confirm. Tap the digits of the quantity, for example 1, or one of the quick keys under it.
Optionally tap one or several tiles under Reason. The block is shown when scrap reasons are defined, and a scrap is recorded with or without a reason.
Tap Confirm scrap entry. The result screen confirms what was booked. Tap Done to go back to the operation.
If the lot holds less than the quantity you enter, the tablet warns you and lets you discard the entry or confirm to scrap anyway.
Stop the machine and restart it
On the operation screen, tap Stop machine. The screen says "Tap a tile to report right away - there is no confirmation step".
Tap the tile of the reason, for example Material Availability. One tap stops the work center and ends every running timer at that moment. You can optionally tap a tile under Additional details, or Type a description. The banner reads Station stopped: Material Availability, next to the button Restart station.
While the station is stopped, Start, Pause, Finish operation and Record output are refused and the screen shows why. On the board the jobs of the station appear under Station stopped; the card carries the badge Station stopped, and the job that was running offers Open to handle incident.
Any Manufacturing user can put the station back to work once the cause is fixed:
Tap Restart station: on the operation screen, or in the menu of the card (the three dots), which also offers Open operation.
The question "Restart this station?" appears. Keep it stopped leaves things as they were.
Tap Yes, restart. The work center works again. The stop is timed from the moment someone tapped the reason until the restart, and no time is credited to anyone in between. The job shows Operation paused: the operator taps Resume to continue. The restart is logged (see "Audit what was recorded on the tablets").
Finish the last operation and close the manufacturing order
Make sure the output and the materials are recorded, then tap Finish operation. It closes your timer and finishes the operation. Because it is the last operation, the tablet moves on to Confirm Closing the Production Order. The screen shows the product, the output recorded and, for a serial-tracked product, the serial numbers. It warns that this cannot be undone.
Tap Confirm closing order, followed by the order reference. The manufacturing order is closed through the standard rules, so every rule installed in your system still applies. When only part of the ordered quantity was produced, the screen asks what to do with the rest.
Tap Create a backorder for 1.00 Units to produce the rest later, or Close without backorder. The screen confirms what was produced and that a backorder was created. Tap Done to return to the board. The finished order is gone from the work to do, and the backorder shows up as a new card.
If you are not sure, tap Back, not yet closed on the closing screens: nothing changes.
When the materials differ from the bill of materials
When the materials you recorded differ from the bill of materials, the closing screen shows the table The materials used differ from the bill of materials with Product, Expected and Actual. You can tap Correct the figures to reopen the materials list.
When the bill of materials is set to Blocked, the screen adds "Only a manufacturing manager can close this order with these differences." and offers Ask a manager to approve.
Tap Confirm closing order. The table lists the differences.
Tap Ask a manager to approve. A to-do is scheduled for the managers and the differences are logged. The screen says "Sent to ... for approval. The order stays open until the differences are approved."
Open the Shop Floor from the desktop
Open Manufacturing ‣ Overview. Each work center is a card. The small screen button next to the main button of the card is Open Shop Floor.
Click it. The Shop Floor opens on that station, focused on it, without saving it among your stations.
To jump to a single job, open Manufacturing ‣ Operations ‣ Work Orders and switch to the Kanban view. Each work order is a card with an Open button.
Click Open. The Shop Floor opens directly on the operation screen of that job, or on the closing screen when its order waits to be closed.
Follow the work on the desktop
Open Manufacturing ‣ Planning ‣ Work Orders ‣ Planning by Production to see the work orders of each manufacturing order on a timeline, or Planning by Workcenter to see them by station.
See who a time line is credited to
Open Manufacturing ‣ Operations ‣ Work Orders, open the work order and click the Time Tracking tab.
Each line shows two people. User is the account that recorded or started the line. Employee is the person who worked: the credit and the labour cost follow the Employee. When no employee is chosen, the Employee is filled from the User: that user's employee.
In the example, Anita Oliver worked part of the job and Mitchell Admin recorded it on her behalf, so that line reads User Mitchell Admin and Employee Anita Oliver. A line that Mitchell started for himself reads Mitchell Admin twice.
Shift lead: approve, credit and audit
The tasks below need the access right Manufacturing / Administrator, in addition to everything an operator does. You work on a tablet or on the desktop.
Approve a consumption difference
Find the card whose badge reads Waiting to be closed and tap Close the order.
On the closing screen, tap Confirm closing order, followed by the order reference.
Review the differences. As a manager you are offered Confirm and close, which an operator does not get on a bill of materials set to Blocked. Correct the figures reopens the materials list instead.
Tap Confirm and close. The extra consumption is accepted and kept, and the order is closed. The approval request is recorded in the log of the order.
Credit an operation to another employee (On behalf)
Use this when someone else actually works the job at the station, for example because their own tablet is not at hand. The time and the labour cost go to that person's hourly cost, or to the Employee Hourly Cost of the work center when that person has none. You stay the User of the time line; the person you choose becomes its Employee.
On the operation screen, tap On behalf. Only a Manufacturing Administrator sees this button.
The screen Who is this operation credited to? carries the badge Team leaders only. It splits the people into This work center, Recently credited and All employees, each tab with its number of people.
Tap the employee, for example Anita Oliver. The card This action has cost consequences states the effect: the operation time is credited to that person and the labour cost is computed from that person's hourly cost, not yours; when that person has no hourly cost, the per-employee rate of the work center is used. The box The time entry keeps both identities shows Acting user, the name of the account you are signed in with, and Credited to, the person you chose. Back to me undoes the choice.
Tap Back. Every screen carries the banner Recording for: with the name and the button Back to me. Tap Start or Resume and the time line is credited to the chosen employee, while your own account stays in the log as its user.
When you are done, tap Back to me to put the recording back on your own account. The banner is gone.
Started the job first? If you tapped Open & start before choosing, open On behalf on that operation and choose the person: the time running since you started goes to them, counted from its start, so no line stays on your name. The screen says so before you choose, with the time it started. Only time you started for yourself moves: time running for another worker keeps that worker, and time you already paused stays yours. Back to me does not take the time back: it stays with the person you chose, and the operation screen shows the notice "The time you started on this operation is credited to ..." with the name of who receives it.
Post the consumption of components early
By default the consumption is booked when the order is closed. You can book it earlier from the work order form.
Open Manufacturing ‣ Operations ‣ Work Orders and open the work order. While it is in progress, the header offers Post Consumption. The button is shown only when there is consumption that can be posted.
Click Post Consumption. The components that the operation consumes, the same ones the tablet lists for it, are posted at once and the stock is credited, not at order close. Output recorded later only consumes what is left of a partly posted component.
Audit what was recorded on the tablets
Open Manufacturing ‣ Reporting ‣ Shop Floor Entries. The read-only list shows every recording. A Manufacturing User sees own lines, a Manufacturing Administrator sees all of them.
Open the filter menu. Filters has Done, Undone, On Behalf and Restarts; Group By has Kind, Recorded By and Manufacturing Order.
Choose the filter Restarts to show who put a stopped station back to work, and when.
Click a line to open it. The read-only form shows the kind, the order, the work order, the stop reason and duration, who recorded it, the credited employee, whether it was on behalf and, for an undone line, who undid it and when. Lines can be neither edited nor deleted.
The filter Undone shows only the recordings that were taken back, and On Behalf the lines recorded for another employee.
Troubleshooting
- Tapping a card did not start the job. This is intended: tapping the body of a card only opens the job, so a hand resting on a card never puts you on the clock. Tap Open & start, Continue operation, Resume operation or the Start button of the operation screen.
- Start, Pause, Finish operation or Record output are refused. The work center is stopped. The screen shows the reason of the stop. Tap Restart station once the cause is fixed.
- The screen says "Enter the quantity first. Tap 0 if none was used." A materials row needs a quantity before you can confirm. Enter 0 if nothing was used.
- "Every lot needs a quantity above zero." Remove the lot you do not use with the red bin button, or enter a quantity for it.
- I recorded scrap by mistake. Scrap cannot be undone from the shop floor. Ask a shift lead or a stock manager to correct it.
- I cannot close an order because of a difference in materials. Tap Correct the figures if a figure is wrong, or Ask a manager to approve when the bill of materials does not allow differences.
- I cannot see On behalf. This control is for Manufacturing Administrators only.
- I cannot see the finished lot or the materials on an operation. They belong to the last operation of the order. Open that operation.
- There is no Auto-generate lot button. The operation type of the order does not allow creating new lots. Pick an existing lot, or ask the warehouse to create the lot first.
- "Output ... is already recorded under lot ..." and there is no Retry button. An order makes one finished lot. Undo the earlier output first, or close the order and continue on a backorder under the new lot.
- My connection dropped while I was recording. Tap Retry when the connection is back. A recording that is retried is applied once, never twice.
- I do not see Overview or Work Orders in the Manufacturing menu. Turn on Work Orders in Manufacturing ‣ Configuration ‣ Settings.
FAQ
Do operators need to type?
Rarely. Quantities go in on a number pad and choices are tiles. Only the search and a free description of a stop use the keyboard.
Whose labour cost does a job use?
The employee the time is credited to: the signed-in operator, or the employee chosen with On behalf. In the Time Tracking tab of a work order this is the Employee column; the User column is the account that recorded the line.
Can several people share one tablet?
Yes. Each person signs in with their own account, and the work centers and operators are remembered per account.
Who can restart a stopped station?
Any Manufacturing user. Every restart is logged in Shop Floor Entries with who did it and when.
Can I undo a recording after the order is closed?
No. Undo works only while the operation and the order are open.
Where do I see who recorded what?
In Manufacturing ‣ Reporting ‣ Shop Floor Entries. See "Audit what was recorded on the tablets".
This software and associated files (the "Software") may only be used (executed, modified, executed after modifications) if you have purchased a valid license from the authors, typically via Odoo Apps, or if you have received a written agreement from the authors of the Software (see the COPYRIGHT file).
You may develop Odoo modules that use the Software as a library (typically by depending on it, importing it and using its resources), but without copying any source code or material from the Software. You may distribute those modules under the license of your choice, provided that this license is compatible with the terms of the Odoo Proprietary License (For example: LGPL, MIT, or proprietary licenses similar to this one).
It is forbidden to publish, distribute, sublicense, or sell copies of the Software or modified copies of the Software.
The above copyright notice and this permission notice must be included in all copies or substantial portions of the Software.
THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.